A Treffeisen & Sons LLC
AOneonta, NY State contracts since 2009Updated Nov 13, 2026
A Treffeisen & Sons LLC holds 30 contracts worth $5.6M with 4 New York State agencies, most with Department of Environmental Conservation; 5 active today. The first started in 2009.
- Total contract value
- $5.6M
- Current contract amounts
- Spent to date
- $3.8M
- 69% of contract value
- Active contracts
- 5
- $2.0M in active value
- Contracts on record
- 30
- Since 2009
- Agencies served
- 4
- Most with Department of Environmental Conservation
- Years active
- 17
- First contract 2009
Contact & company
Business information and how to reach the company.
Phone
Address
- Legal name
- A Treffeisen & Sons LLC
- Identifiers
- UEI DM69Y41BMT19 · CAGE 5F1D2
- Federal registration
- Active · renews by May 2027
- In business since
- 1923
Industry codes (NAICS)
- 238210Electrical Contractors and Other Wiring Installation Contractors
- 238220Plumbing, Heating, and Air-Conditioning Contractors
Leadership
Kevin Treffeisen
Contracts
30 contracts with New York State agencies, active first. Open a row for the full record.
| Details | Contract | Type | Contract no. | Term | |||||
|---|---|---|---|---|---|---|---|---|---|
Rehabilitate rest area on Route 30 in Delaware County D47486HConstruction: BuildingActive | Office of General Services - Design & Construction | Construction: BuildingConstruction | D47486H | Aug 5, 2026to Mar 28, 2028 | Aug 5, 2026 | Mar 28, 2028 | $242,427$37,858 spent | $37,858 | |
DeBruce Environmental Education Camp cafeteria & crew cabin Town of Rockland Sullivan County D0000003Construction: BuildingActive | Department of Environmental Conservation | Construction: BuildingConstruction | D0000003 | Apr 14, 2026to Sep 13, 2027 | Apr 14, 2026 | Sep 13, 2027 | $593,400$183,354 spent | $183,354 | |
DeBruce Environmental Education Camp cafeteria & crew cabin Town of Rockland Sullivan County D0000004Construction: BuildingActive | Department of Environmental Conservation | Construction: BuildingConstruction | D0000004 | Apr 14, 2026to Sep 13, 2027 | Apr 14, 2026 | Sep 13, 2027 | $182,400$29,367 spent | $29,367 | |
Term contract for electrical in Otsego County D220027Construction: Standby contractsActive | College at Oneonta | Construction: Standby contractsConstruction | D220027 | Mar 12, 2025to Mar 11, 2028 | Mar 12, 2025 | Mar 11, 2028 | $500,000$0 spent | $0 | |
Term contract for mechanical, electrical and plumbing in Otsego County D220028Construction: Standby contractsActive | College at Oneonta | Construction: Standby contractsConstruction | D220028 | Mar 12, 2025to Mar 11, 2028 | Mar 12, 2025 | Mar 11, 2028 | $500,000$117,555 spent | $117,555 | |
Cooling tower upgrades in Otsego County D220066Construction: Building | College at Oneonta | Construction: BuildingConstruction | D220066 | Aug 8, 2025to May 20, 2026 | Aug 8, 2025 | May 20, 2026 | $139,242$132,280 spent | $132,280 | |
Air conditioning upgrade in the Alumni field house in Otsego County D220049Construction: Miscellaneous | College at Oneonta | Construction: MiscellaneousConstruction | D220049 | Dec 13, 2024to May 30, 2025 | Dec 13, 2024 | May 30, 2025 | $74,400$74,400 spent | $74,400 | |
Physical science fume hood upg T220023Contract not subject to state pre-audit | College at Oneonta | Contract not subject to state pre-auditNot pre-audited | T220023 | May 28, 2024to Jan 25, 2025 | May 28, 2024 | Jan 25, 2025 | $66,800$66,800 spent | $66,800 | |
Provide salt storage buildings Bainbridge & Horton Region 9 Chenango and Delaware Counties D47321EConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D47321E | May 7, 2024to Aug 29, 2025 | May 7, 2024 | Aug 29, 2025 | $297,291$280,749 spent | $280,749 | |
Milne library cooling tower repairs at SUNY Oneonta D220003Construction: Building | College at Oneonta | Construction: BuildingConstruction | D220003 | Feb 5, 2024to May 1, 2024 | Feb 5, 2024 | May 1, 2024 | $126,800$126,800 spent | $126,800 | |
Replace elevator at Homer Folks Facility in Otsego County D47391HConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D47391H | Jan 31, 2024to May 21, 2025 | Jan 31, 2024 | May 21, 2025 | $31,398$29,600 spent | $29,600 | |
Plumbing - Provide 2 new shower buildings Mongaup Pond Campground Sullivan County D012564Construction: Building | Department of Environmental Conservation | Construction: BuildingConstruction | D012564 | Mar 23, 2023to Jul 19, 2024 | Mar 23, 2023 | Jul 19, 2024 | $667,800$648,522 spent | $648,522 | |
Rogers Environ Education Center visitor center ADA improvements Sherburne Chenango county (P) D011647Construction: Building | Department of Environmental Conservation | Construction: BuildingConstruction | D011647 | Mar 25, 2021to Jan 21, 2022 | Mar 25, 2021 | Jan 21, 2022 | $42,800$41,361 spent | $41,361 | |
Provide Salt Storage Building DOT Region 6 Wellsville Allegany County (E) D45846EConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D45846E | Jul 20, 2018to Jan 13, 2019 | Jul 20, 2018 | Jan 13, 2019 | $34,000$33,306 spent | $33,306 | |
Nicks Lake Campground Loop D Shower Bldg & Utility P Improvements Herkimer County D010618Construction: Miscellaneous | Department of Environmental Conservation | Construction: MiscellaneousConstruction | D010618 | Jul 2, 2018to Aug 13, 2019 | Jul 2, 2018 | Aug 13, 2019 | $229,900$223,515 spent | $223,515 | |
Construction services for proj T990453Contract not subject to state pre-audit | College at Oneonta | Contract not subject to state pre-auditNot pre-audited | T990453 | May 14, 2018to Jan 31, 2019 | May 14, 2018 | Jan 31, 2019 | $411,460$411,460 spent | $411,460 | |
Sanitary Sewer System Rehab at Caroga Lake Campground, T. Caroga Lake, Fulton County D010226Construction: Building | Department of Environmental Conservation | Construction: BuildingConstruction | D010226 | Oct 25, 2016to Aug 15, 2017 | Oct 25, 2016 | Aug 15, 2017 | $98,100$94,600 spent | $94,600 | |
Lake Durant Shower Building PC, Indian Lake, Hamilton County D010172Construction: Building | Department of Environmental Conservation | Construction: BuildingConstruction | D010172 | Oct 17, 2016to Aug 9, 2017 | Oct 17, 2016 | Aug 9, 2017 | $196,800$191,800 spent | $191,800 | |
Rehab wells bridge rest area, i88 WB, wells bridge NY (multi-trade) electrical D45287EConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D45287E | Apr 21, 2016to Mar 8, 2017 | Apr 21, 2016 | Mar 8, 2017 | $169,400$155,890 spent | $155,890 | |
Rehab wells bridge rest area, i88 WB, wells bridge NY (multi-trade) plumbing D45287PConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D45287P | Apr 21, 2016to Mar 8, 2017 | Apr 21, 2016 | Mar 8, 2017 | $96,600$92,856 spent | $92,856 |
Rehabilitate rest area on Route 30 in Delaware CountyOffice of General Services - Design & ConstructionAug 5, 2026 – Mar 28, 2028Active$242,427
- Description
- Rehabilitate rest area on Route 30 in Delaware County
- Contract number
- D47486H
- Type
- Construction: BuildingConstruction
- Term
- Aug 5, 2026 → Mar 28, 20281.7 years
- Approved
- Aug 5, 2026
- Status
- Active
- Amount
- $242,427
- Spent to date
- $37,858 · 16% of the amount
DeBruce Environmental Education Camp cafeteria & crew cabin Town of Rockland Sullivan CountyDepartment of Environmental ConservationApr 14, 2026 – Sep 13, 2027Active$593,400
- Description
- DeBruce Environmental Education Camp cafeteria & crew cabin Town of Rockland Sullivan County
- Contract number
- D0000003
- Type
- Construction: BuildingConstruction
- Term
- Apr 14, 2026 → Sep 13, 202717 months
- Approved
- Apr 14, 2026
- Status
- Active
- Amount
- $593,400
- Spent to date
- $183,354 · 31% of the amount
DeBruce Environmental Education Camp cafeteria & crew cabin Town of Rockland Sullivan CountyDepartment of Environmental ConservationApr 14, 2026 – Sep 13, 2027Active$182,400
- Description
- DeBruce Environmental Education Camp cafeteria & crew cabin Town of Rockland Sullivan County
- Contract number
- D0000004
- Type
- Construction: BuildingConstruction
- Term
- Apr 14, 2026 → Sep 13, 202717 months
- Approved
- Apr 14, 2026
- Status
- Active
- Amount
- $182,400
- Spent to date
- $29,367 · 16% of the amount
Term contract for electrical in Otsego CountyCollege at OneontaMar 12, 2025 – Mar 11, 2028Active$500,000
- Description
- Term contract for electrical in Otsego County
- Contract number
- D220027
- Type
- Construction: Standby contractsConstruction
- Agency
- College at Oneonta
- Term
- Mar 12, 2025 → Mar 11, 20283 years
- Approved
- Mar 12, 2025
- Status
- Active
- Amount
- $500,000
- Spent to date
- $0 · 0% of the amount
Term contract for mechanical, electrical and plumbing in Otsego CountyCollege at OneontaMar 12, 2025 – Mar 11, 2028Active$500,000
- Description
- Term contract for mechanical, electrical and plumbing in Otsego County
- Contract number
- D220028
- Type
- Construction: Standby contractsConstruction
- Agency
- College at Oneonta
- Term
- Mar 12, 2025 → Mar 11, 20283 years
- Approved
- Mar 12, 2025
- Status
- Active
- Amount
- $500,000
- Spent to date
- $117,555 · 24% of the amount
Cooling tower upgrades in Otsego CountyCollege at OneontaAug 8, 2025 – May 20, 2026$139,242
- Description
- Cooling tower upgrades in Otsego County
- Contract number
- D220066
- Type
- Construction: BuildingConstruction
- Agency
- College at Oneonta
- Term
- Aug 8, 2025 → May 20, 20269 months
- Approved
- Aug 8, 2025
- Status
- Ended
- Amount
- $139,242
- Spent to date
- $132,280 · 95% of the amount
Air conditioning upgrade in the Alumni field house in Otsego CountyCollege at OneontaDec 13, 2024 – May 30, 2025$74,400
- Description
- Air conditioning upgrade in the Alumni field house in Otsego County
- Contract number
- D220049
- Type
- Construction: MiscellaneousConstruction
- Agency
- College at Oneonta
- Term
- Dec 13, 2024 → May 30, 20256 months
- Approved
- Dec 3, 2024
- Status
- Ended
- Amount
- $74,400
- Spent to date
- $74,400 · 100% of the amount
Physical science fume hood upgCollege at OneontaMay 28, 2024 – Jan 25, 2025$66,800
- Description
- Physical science fume hood upg
- Contract number
- T220023
- Type
- Contract not subject to state pre-auditNot pre-audited
- Agency
- College at Oneonta
- Term
- May 28, 2024 → Jan 25, 20258 months
- Approved
- Jun 3, 2024
- Status
- Ended
- Amount
- $66,800
- Spent to date
- $66,800 · 100% of the amount
Provide salt storage buildings Bainbridge & Horton Region 9 Chenango and Delaware CountiesOffice of General Services - Design & ConstructionMay 7, 2024 – Aug 29, 2025$297,291
- Description
- Provide salt storage buildings Bainbridge & Horton Region 9 Chenango and Delaware Counties
- Contract number
- D47321E
- Type
- Construction: BuildingConstruction
- Term
- May 7, 2024 → Aug 29, 202516 months
- Approved
- May 7, 2024
- Status
- Ended
- Amount
- $297,291
- Spent to date
- $280,749 · 94% of the amount
Milne library cooling tower repairs at SUNY OneontaCollege at OneontaFeb 5, 2024 – May 1, 2024$126,800
- Description
- Milne library cooling tower repairs at SUNY Oneonta
- Contract number
- D220003
- Type
- Construction: BuildingConstruction
- Agency
- College at Oneonta
- Term
- Feb 5, 2024 → May 1, 20243 months
- Approved
- Feb 7, 2024
- Status
- Ended
- Amount
- $126,800
- Spent to date
- $126,800 · 100% of the amount
Replace elevator at Homer Folks Facility in Otsego CountyOffice of General Services - Design & ConstructionJan 31, 2024 – May 21, 2025$31,398
- Description
- Replace elevator at Homer Folks Facility in Otsego County
- Contract number
- D47391H
- Type
- Construction: BuildingConstruction
- Term
- Jan 31, 2024 → May 21, 202516 months
- Approved
- Jan 31, 2024
- Status
- Ended
- Amount
- $31,398
- Spent to date
- $29,600 · 94% of the amount
Plumbing - Provide 2 new shower buildings Mongaup Pond Campground Sullivan CountyDepartment of Environmental ConservationMar 23, 2023 – Jul 19, 2024$667,800
- Description
- Plumbing - Provide 2 new shower buildings Mongaup Pond Campground Sullivan County
- Contract number
- D012564
- Type
- Construction: BuildingConstruction
- Term
- Mar 23, 2023 → Jul 19, 202416 months
- Approved
- Mar 23, 2023
- Status
- Ended
- Amount
- $667,800
- Spent to date
- $648,522 · 97% of the amount
Rogers Environ Education Center visitor center ADA improvements Sherburne Chenango county (P)Department of Environmental ConservationMar 25, 2021 – Jan 21, 2022$42,800
- Description
- Rogers Environ Education Center visitor center ADA improvements Sherburne Chenango county (P)
- Contract number
- D011647
- Type
- Construction: BuildingConstruction
- Term
- Mar 25, 2021 → Jan 21, 202210 months
- Approved
- Mar 25, 2021
- Status
- Ended
- Amount
- $42,800
- Spent to date
- $41,361 · 97% of the amount
Provide Salt Storage Building DOT Region 6 Wellsville Allegany County (E)Office of General Services - Design & ConstructionJul 20, 2018 – Jan 13, 2019$34,000
- Description
- Provide Salt Storage Building DOT Region 6 Wellsville Allegany County (E)
- Contract number
- D45846E
- Type
- Construction: BuildingConstruction
- Term
- Jul 20, 2018 → Jan 13, 20196 months
- Approved
- Jul 20, 2018
- Status
- Ended
- Amount
- $34,000
- Spent to date
- $33,306 · 98% of the amount
Nicks Lake Campground Loop D Shower Bldg & Utility P Improvements Herkimer CountyDepartment of Environmental ConservationJul 2, 2018 – Aug 13, 2019$229,900
- Description
- Nicks Lake Campground Loop D Shower Bldg & Utility P Improvements Herkimer County
- Contract number
- D010618
- Type
- Construction: MiscellaneousConstruction
- Term
- Jul 2, 2018 → Aug 13, 201913 months
- Approved
- Jul 2, 2018
- Status
- Ended
- Amount
- $229,900
- Spent to date
- $223,515 · 97% of the amount
Construction services for projCollege at OneontaMay 14, 2018 – Jan 31, 2019$411,460
- Description
- Construction services for proj
- Contract number
- T990453
- Type
- Contract not subject to state pre-auditNot pre-audited
- Agency
- College at Oneonta
- Term
- May 14, 2018 → Jan 31, 20199 months
- Approved
- Mar 9, 2018
- Status
- Ended
- Amount
- $411,460
- Spent to date
- $411,460 · 100% of the amount
Sanitary Sewer System Rehab at Caroga Lake Campground, T. Caroga Lake, Fulton CountyDepartment of Environmental ConservationOct 25, 2016 – Aug 15, 2017$98,100
- Description
- Sanitary Sewer System Rehab at Caroga Lake Campground, T. Caroga Lake, Fulton County
- Contract number
- D010226
- Type
- Construction: BuildingConstruction
- Term
- Oct 25, 2016 → Aug 15, 201710 months
- Approved
- Oct 25, 2016
- Status
- Ended
- Amount
- $98,100
- Spent to date
- $94,600 · 96% of the amount
Lake Durant Shower Building PC, Indian Lake, Hamilton CountyDepartment of Environmental ConservationOct 17, 2016 – Aug 9, 2017$196,800
- Description
- Lake Durant Shower Building PC, Indian Lake, Hamilton County
- Contract number
- D010172
- Type
- Construction: BuildingConstruction
- Term
- Oct 17, 2016 → Aug 9, 201710 months
- Approved
- Oct 17, 2016
- Status
- Ended
- Amount
- $196,800
- Spent to date
- $191,800 · 97% of the amount
Rehab wells bridge rest area, i88 WB, wells bridge NY (multi-trade) electricalOffice of General Services - Design & ConstructionApr 21, 2016 – Mar 8, 2017$169,400
- Description
- Rehab wells bridge rest area, i88 WB, wells bridge NY (multi-trade) electrical
- Contract number
- D45287E
- Type
- Construction: BuildingConstruction
- Term
- Apr 21, 2016 → Mar 8, 201711 months
- Approved
- Apr 21, 2016
- Status
- Ended
- Amount
- $169,400
- Spent to date
- $155,890 · 92% of the amount
Rehab wells bridge rest area, i88 WB, wells bridge NY (multi-trade) plumbingOffice of General Services - Design & ConstructionApr 21, 2016 – Mar 8, 2017$96,600
- Description
- Rehab wells bridge rest area, i88 WB, wells bridge NY (multi-trade) plumbing
- Contract number
- D45287P
- Type
- Construction: BuildingConstruction
- Term
- Apr 21, 2016 → Mar 8, 201711 months
- Approved
- Apr 21, 2016
- Status
- Ended
- Amount
- $96,600
- Spent to date
- $92,856 · 96% of the amount
Contract-type mix
Share of contract value by type
- Construction25 contracts$5.0M
- Contract not subject to state pre-audit5 contracts$558.8K
Contracts over time
Contracts started per year
View as table
| Year | Contracts |
|---|---|
| 2009: 2 contracts, $233.2K | 2 |
| 2010: 0 contracts, $0.0 | 0 |
| 2011: 2 contracts, $73.4K | 2 |
| 2012: 0 contracts, $0.0 | 0 |
| 2013: 2 contracts, $213.3K | 2 |
| 2014: 0 contracts, $0.0 | 0 |
| 2015: 3 contracts, $301.8K | 3 |
| 2016: 5 contracts, $615.2K | 5 |
| 2017: 0 contracts, $0.0 | 0 |
| 2018: 3 contracts, $675.4K | 3 |
| 2019: 0 contracts, $0.0 | 0 |
| 2020: 0 contracts, $0.0 | 0 |
| 2021: 1 contracts, $42.8K | 1 |
| 2022: 0 contracts, $0.0 | 0 |
| 2023: 1 contracts, $667.8K | 1 |
| 2024: 5 contracts, $596.7K | 5 |
| 2025: 3 contracts, $1.1M | 3 |
| 2026: 3 contracts, $1.0M | 3 |
How the Contractor Score adds up
Extensive (A, 98/100): 5 active contracts, $5.6M in contracts.
- Contract volume+8.4measured
$5.6M in current contract value across 30 contracts, more than 81% of scored contractors.
- Recent activity+17.4measured
5 active contracts today; the most recent was approved in August 2026.
- Agency breadth+8.3measured
Contracts with 4 different state agencies and facilities.
- Experience+1.8measured
First contract started in May 2009 (17 years of contract history).
- Contract-type mix+6.4measured
4 contract types; the largest group is construction (90% of value). Goods and services contracts are 90% of the total.
- Spending vs. value+0.1measured
On 25 completed contracts with spending recorded, spending is 97% of the contract value. Spending below the full value is common (work can finish under budget) and isn't treated as a problem.
- Federal award history0.0unknown
No federal award history found. Scored as neutral.
- Federal registration+5.2measured
Registered to do business with the federal government (registration active).
50 + contributions = 98 (A, Extensive)Starts at 50. Bars: cool adds, warm subtracts.
Agencies served
Contract value with each agency or facility
Similar contractors
- B
Eastman Associates Inc
Construction & Renovation
Since 20096 agencies
- Contract value
- $7.6M
- Contracts
- 15
- Active
- 0
- A
RB Robinson Contracting Inc
Construction & Renovation
Since 20146 agencies
- Contract value
- $14.4M
- Contracts
- 14
- Active
- 0
- A
Titan Roofing Inc
Construction & Renovation
Since 200816 agencies
- Contract value
- $137.7M
- Contracts
- 128
- Active
- 7
- A
Upstate Companies I LLC
Mount Upton, NYConstruction & Renovation
Since 201610 agencies
- Contract value
- $156.7M
- Contracts
- 104
- Active
- 22
- A
Andrew R Mancini Assoc Inc
Construction & Renovation
Since 20088 agencies
- Contract value
- $193.0M
- Contracts
- 69
- Active
- 4
- A
Murnane Building Contractors
Plattsburgh, NYConstruction & Renovation
Since 200515 agencies
- Contract value
- $519.9M
- Contracts
- 120
- Active
- 9
- More construction & renovation contractors Ranked by contract value
Browse more
- Department of Environmental Conservation contractors
- College at Oneonta contractors
- Office of General Services - Design & Construction contractors
- State University Construction Fund contractors
- Construction & Renovation contractors
- Top contractors
- All contractors
Contract figures are public New York State contract records as of Nov 13, 2026: current contract amounts and spending to date as reported. Company details are shown when we can match this contractor to a registered business with confidence.
RFP Detector is an independent service and is not affiliated with any government agency. Scores are informational.