Adhan Piping Co Inc
AState contracts since 2008Updated Nov 13, 2026
Adhan Piping Co Inc holds 40 contracts worth $36.7M with 5 New York State agencies, most with College at Cortland; 7 active today. The first started in 2008.
- Total contract value
- $36.7M
- Current contract amounts
- Spent to date
- $19.5M
- 53% of contract value
- Active contracts
- 7
- $6.5M in active value
- Contracts on record
- 40
- Since 2008
- Agencies served
- 5
- Most with College at Cortland
- Years active
- 18
- First contract 2008
Contact & company
Business information and how to reach the company.
Phone
Address
Contracts
40 contracts with New York State agencies, active first. Open a row for the full record.
| Details | Contract | Type | Contract no. | Term | |||||
|---|---|---|---|---|---|---|---|---|---|
Term contract for landscaping at SUNY Cortland in Cortland County D001022Construction: Standby contractsActive | College at Cortland | Construction: Standby contractsConstruction | D001022 | Oct 22, 2026to Oct 22, 2029 | Oct 22, 2026 | Oct 22, 2029 | $500,000$0 spent | $0 | |
Term contract for masonry work at SUNY Cortland in Cortland County D001020Construction: Standby contractsActive | College at Cortland | Construction: Standby contractsConstruction | D001020 | Oct 19, 2026to Oct 18, 2029 | Oct 19, 2026 | Oct 18, 2029 | $1,000,000$0 spent | $0 | |
Term contract for concrete and flatwork at SUNY Cortland in Cortland County D001023Construction: Standby contractsActive | College at Cortland | Construction: Standby contractsConstruction | D001023 | Oct 19, 2026to Oct 18, 2029 | Oct 19, 2026 | Oct 18, 2029 | $1,000,000$0 spent | $0 | |
Term contract for site work at SUNY Cortland in Cortland County D001021Construction: Standby contractsActive | College at Cortland | Construction: Standby contractsConstruction | D001021 | Oct 19, 2026to Oct 18, 2029 | Oct 19, 2026 | Oct 18, 2029 | $1,000,000$0 spent | $0 | |
Construction of south campus parking lot in Cortland County D001002Construction: BuildingActive | College at Cortland | Construction: BuildingConstruction | D001002 | Apr 30, 2026to Jun 30, 2027 | Apr 30, 2026 | Jun 30, 2027 | $984,622$907,298 spent | $907,298 | |
Term contract for carpentry in Cortland County D000954Construction: Standby contractsActive | College at Cortland | Construction: Standby contractsConstruction | D000954 | Jun 7, 2025to Jun 6, 2028 | Jun 7, 2025 | Jun 6, 2028 | $1,000,000$289,732 spent | $289,732 | |
Term contract for general contractor on main campus in Cortland County D000955Construction: Standby contractsActive | College at Cortland | Construction: Standby contractsConstruction | D000955 | Jun 7, 2025to Jun 6, 2028 | Jun 7, 2025 | Jun 6, 2028 | $1,000,000$418,171 spent | $418,171 | |
Professional Studies parking lot replacement in Cortland County D000969Construction: Highway | College at Cortland | Construction: HighwayConstruction | D000969 | May 30, 2025to Aug 8, 2025 | May 30, 2025 | Aug 8, 2025 | $774,360$774,360 spent | $774,360 | |
Miller building stairs and plaza reconstruction in Cortland County D000925Construction: Building | College at Cortland | Construction: BuildingConstruction | D000925 | Aug 17, 2024to Oct 31, 2025 | Aug 17, 2024 | Oct 31, 2025 | $1,228,776$1,228,776 spent | $1,228,776 | |
Construction term contract for sitework at SUNY Cortland D000875Construction: Standby contracts | College at Cortland | Construction: Standby contractsConstruction | D000875 | Aug 24, 2023to Aug 23, 2026 | Aug 24, 2023 | Aug 23, 2026 | $1,000,000$832,097 spent | $832,097 | |
Construction term contract for concrete and flatwork at SUNY Cortland D000871Construction: Standby contracts | College at Cortland | Construction: Standby contractsConstruction | D000871 | Aug 24, 2023to Aug 23, 2026 | Aug 24, 2023 | Aug 23, 2026 | $1,000,000$137,276 spent | $137,276 | |
Construction term contract for landscaping at SUNY Cortland D000879Construction: Standby contracts | College at Cortland | Construction: Standby contractsConstruction | D000879 | Aug 24, 2023to Aug 23, 2026 | Aug 24, 2023 | Aug 23, 2026 | $500,000$199,227 spent | $199,227 | |
Red field turf replacement at SUNY Cortland D000853Construction: Building | College at Cortland | Construction: BuildingConstruction | D000853 | Mar 30, 2023to Feb 12, 2025 | Mar 30, 2023 | Feb 12, 2025 | $1,355,190$1,355,190 spent | $1,355,190 | |
Red field scoreboard replacement at SUNY Cortland D000856Construction: Miscellaneous | College at Cortland | Construction: MiscellaneousConstruction | D000856 | Mar 24, 2023to Jul 28, 2024 | Mar 24, 2023 | Jul 28, 2024 | $386,000$386,000 spent | $386,000 | |
Construction term contract si T000783Contract not subject to state pre-audit | College at Cortland | Contract not subject to state pre-auditNot pre-audited | T000783 | Mar 1, 2020to Feb 29, 2024 | Mar 1, 2020 | Feb 29, 2024 | $1,000,000$608,577 spent | $608,577 | |
Construction term contract ge T000777Contract not subject to state pre-audit | College at Cortland | Contract not subject to state pre-auditNot pre-audited | T000777 | Mar 1, 2020to Feb 29, 2024 | Mar 1, 2020 | Feb 29, 2024 | $1,000,000$0 spent | $0 | |
Construction term contract co T000766Contract not subject to state pre-audit | College at Cortland | Contract not subject to state pre-auditNot pre-audited | T000766 | Mar 1, 2020to Feb 29, 2024 | Mar 1, 2020 | Feb 29, 2024 | $1,000,000$971,552 spent | $971,552 | |
Construction term contract ge T000774Contract not subject to state pre-audit | College at Cortland | Contract not subject to state pre-auditNot pre-audited | T000774 | Mar 1, 2020to Feb 29, 2024 | Mar 1, 2020 | Feb 29, 2024 | $1,000,000$825,649 spent | $825,649 | |
Construction term contract la T000779Contract not subject to state pre-audit | College at Cortland | Contract not subject to state pre-auditNot pre-audited | T000779 | Mar 1, 2020to Feb 29, 2024 | Mar 1, 2020 | Feb 29, 2024 | $500,000$306,321 spent | $306,321 | |
Wallace field infield replacem T000757Contract not subject to state pre-audit | College at Cortland | Contract not subject to state pre-auditNot pre-audited | T000757 | Aug 20, 2019to Aug 31, 2020 | Aug 20, 2019 | Aug 31, 2020 | $467,340$467,340 spent | $467,340 |
Term contract for landscaping at SUNY Cortland in Cortland CountyCollege at CortlandOct 22, 2026 – Oct 22, 2029Active$500,000
- Description
- Term contract for landscaping at SUNY Cortland in Cortland County
- Contract number
- D001022
- Type
- Construction: Standby contractsConstruction
- Agency
- College at Cortland
- Term
- Oct 22, 2026 → Oct 22, 20293 years
- Approved
- Oct 22, 2026
- Status
- Active
- Amount
- $500,000
- Spent to date
- $0 · 0% of the amount
Term contract for masonry work at SUNY Cortland in Cortland CountyCollege at CortlandOct 19, 2026 – Oct 18, 2029Active$1,000,000
- Description
- Term contract for masonry work at SUNY Cortland in Cortland County
- Contract number
- D001020
- Type
- Construction: Standby contractsConstruction
- Agency
- College at Cortland
- Term
- Oct 19, 2026 → Oct 18, 20293 years
- Approved
- Oct 19, 2026
- Status
- Active
- Amount
- $1,000,000
- Spent to date
- $0 · 0% of the amount
Term contract for concrete and flatwork at SUNY Cortland in Cortland CountyCollege at CortlandOct 19, 2026 – Oct 18, 2029Active$1,000,000
- Description
- Term contract for concrete and flatwork at SUNY Cortland in Cortland County
- Contract number
- D001023
- Type
- Construction: Standby contractsConstruction
- Agency
- College at Cortland
- Term
- Oct 19, 2026 → Oct 18, 20293 years
- Approved
- Oct 19, 2026
- Status
- Active
- Amount
- $1,000,000
- Spent to date
- $0 · 0% of the amount
Term contract for site work at SUNY Cortland in Cortland CountyCollege at CortlandOct 19, 2026 – Oct 18, 2029Active$1,000,000
- Description
- Term contract for site work at SUNY Cortland in Cortland County
- Contract number
- D001021
- Type
- Construction: Standby contractsConstruction
- Agency
- College at Cortland
- Term
- Oct 19, 2026 → Oct 18, 20293 years
- Approved
- Oct 19, 2026
- Status
- Active
- Amount
- $1,000,000
- Spent to date
- $0 · 0% of the amount
Construction of south campus parking lot in Cortland CountyCollege at CortlandApr 30, 2026 – Jun 30, 2027Active$984,622
- Description
- Construction of south campus parking lot in Cortland County
- Contract number
- D001002
- Type
- Construction: BuildingConstruction
- Agency
- College at Cortland
- Term
- Apr 30, 2026 → Jun 30, 202714 months
- Approved
- Apr 30, 2026
- Status
- Active
- Amount
- $984,622
- Spent to date
- $907,298 · 92% of the amount
Term contract for carpentry in Cortland CountyCollege at CortlandJun 7, 2025 – Jun 6, 2028Active$1,000,000
- Description
- Term contract for carpentry in Cortland County
- Contract number
- D000954
- Type
- Construction: Standby contractsConstruction
- Agency
- College at Cortland
- Term
- Jun 7, 2025 → Jun 6, 20283 years
- Approved
- May 28, 2025
- Status
- Active
- Amount
- $1,000,000
- Spent to date
- $289,732 · 29% of the amount
Term contract for general contractor on main campus in Cortland CountyCollege at CortlandJun 7, 2025 – Jun 6, 2028Active$1,000,000
- Description
- Term contract for general contractor on main campus in Cortland County
- Contract number
- D000955
- Type
- Construction: Standby contractsConstruction
- Agency
- College at Cortland
- Term
- Jun 7, 2025 → Jun 6, 20283 years
- Approved
- May 28, 2025
- Status
- Active
- Amount
- $1,000,000
- Spent to date
- $418,171 · 42% of the amount
Professional Studies parking lot replacement in Cortland CountyCollege at CortlandMay 30, 2025 – Aug 8, 2025$774,360
- Description
- Professional Studies parking lot replacement in Cortland County
- Contract number
- D000969
- Type
- Construction: HighwayConstruction
- Agency
- College at Cortland
- Term
- May 30, 2025 → Aug 8, 20252 months
- Approved
- May 20, 2025
- Status
- Ended
- Amount
- $774,360
- Spent to date
- $774,360 · 100% of the amount
Miller building stairs and plaza reconstruction in Cortland CountyCollege at CortlandAug 17, 2024 – Oct 31, 2025$1,228,776
- Description
- Miller building stairs and plaza reconstruction in Cortland County
- Contract number
- D000925
- Type
- Construction: BuildingConstruction
- Agency
- College at Cortland
- Term
- Aug 17, 2024 → Oct 31, 202514 months
- Approved
- Aug 7, 2024
- Status
- Ended
- Amount
- $1,228,776
- Spent to date
- $1,228,776 · 100% of the amount
Construction term contract for sitework at SUNY CortlandCollege at CortlandAug 24, 2023 – Aug 23, 2026$1,000,000
- Description
- Construction term contract for sitework at SUNY Cortland
- Contract number
- D000875
- Type
- Construction: Standby contractsConstruction
- Agency
- College at Cortland
- Term
- Aug 24, 2023 → Aug 23, 20263 years
- Approved
- Aug 14, 2023
- Status
- Ended
- Amount
- $1,000,000
- Spent to date
- $832,097 · 83% of the amount
Construction term contract for concrete and flatwork at SUNY CortlandCollege at CortlandAug 24, 2023 – Aug 23, 2026$1,000,000
- Description
- Construction term contract for concrete and flatwork at SUNY Cortland
- Contract number
- D000871
- Type
- Construction: Standby contractsConstruction
- Agency
- College at Cortland
- Term
- Aug 24, 2023 → Aug 23, 20263 years
- Approved
- Aug 14, 2023
- Status
- Ended
- Amount
- $1,000,000
- Spent to date
- $137,276 · 14% of the amount
Construction term contract for landscaping at SUNY CortlandCollege at CortlandAug 24, 2023 – Aug 23, 2026$500,000
- Description
- Construction term contract for landscaping at SUNY Cortland
- Contract number
- D000879
- Type
- Construction: Standby contractsConstruction
- Agency
- College at Cortland
- Term
- Aug 24, 2023 → Aug 23, 20263 years
- Approved
- Aug 14, 2023
- Status
- Ended
- Amount
- $500,000
- Spent to date
- $199,227 · 40% of the amount
Red field turf replacement at SUNY CortlandCollege at CortlandMar 30, 2023 – Feb 12, 2025$1,355,190
- Description
- Red field turf replacement at SUNY Cortland
- Contract number
- D000853
- Type
- Construction: BuildingConstruction
- Agency
- College at Cortland
- Term
- Mar 30, 2023 → Feb 12, 20251.9 years
- Approved
- Mar 20, 2023
- Status
- Ended
- Amount
- $1,355,190
- Spent to date
- $1,355,190 · 100% of the amount
Red field scoreboard replacement at SUNY CortlandCollege at CortlandMar 24, 2023 – Jul 28, 2024$386,000
- Description
- Red field scoreboard replacement at SUNY Cortland
- Contract number
- D000856
- Type
- Construction: MiscellaneousConstruction
- Agency
- College at Cortland
- Term
- Mar 24, 2023 → Jul 28, 202416 months
- Approved
- Mar 15, 2023
- Status
- Ended
- Amount
- $386,000
- Spent to date
- $386,000 · 100% of the amount
Construction term contract siCollege at CortlandMar 1, 2020 – Feb 29, 2024$1,000,000
- Description
- Construction term contract si
- Contract number
- T000783
- Type
- Contract not subject to state pre-auditNot pre-audited
- Agency
- College at Cortland
- Term
- Mar 1, 2020 → Feb 29, 20244 years
- Approved
- Feb 7, 2020
- Status
- Ended
- Amount
- $1,000,000
- Spent to date
- $608,577 · 61% of the amount
Construction term contract geCollege at CortlandMar 1, 2020 – Feb 29, 2024$1,000,000
- Description
- Construction term contract ge
- Contract number
- T000777
- Type
- Contract not subject to state pre-auditNot pre-audited
- Agency
- College at Cortland
- Term
- Mar 1, 2020 → Feb 29, 20244 years
- Approved
- Feb 7, 2020
- Status
- Ended
- Amount
- $1,000,000
- Spent to date
- $0 · 0% of the amount
Construction term contract coCollege at CortlandMar 1, 2020 – Feb 29, 2024$1,000,000
- Description
- Construction term contract co
- Contract number
- T000766
- Type
- Contract not subject to state pre-auditNot pre-audited
- Agency
- College at Cortland
- Term
- Mar 1, 2020 → Feb 29, 20244 years
- Approved
- Feb 7, 2020
- Status
- Ended
- Amount
- $1,000,000
- Spent to date
- $971,552 · 97% of the amount
Construction term contract geCollege at CortlandMar 1, 2020 – Feb 29, 2024$1,000,000
- Description
- Construction term contract ge
- Contract number
- T000774
- Type
- Contract not subject to state pre-auditNot pre-audited
- Agency
- College at Cortland
- Term
- Mar 1, 2020 → Feb 29, 20244 years
- Approved
- Feb 7, 2020
- Status
- Ended
- Amount
- $1,000,000
- Spent to date
- $825,649 · 83% of the amount
Construction term contract laCollege at CortlandMar 1, 2020 – Feb 29, 2024$500,000
- Description
- Construction term contract la
- Contract number
- T000779
- Type
- Contract not subject to state pre-auditNot pre-audited
- Agency
- College at Cortland
- Term
- Mar 1, 2020 → Feb 29, 20244 years
- Approved
- Feb 7, 2020
- Status
- Ended
- Amount
- $500,000
- Spent to date
- $306,321 · 61% of the amount
Wallace field infield replacemCollege at CortlandAug 20, 2019 – Aug 31, 2020$467,340
- Description
- Wallace field infield replacem
- Contract number
- T000757
- Type
- Contract not subject to state pre-auditNot pre-audited
- Agency
- College at Cortland
- Term
- Aug 20, 2019 → Aug 31, 202012 months
- Approved
- Sep 10, 2019
- Status
- Ended
- Amount
- $467,340
- Spent to date
- $467,340 · 100% of the amount
Contract-type mix
Share of contract value by type
- Construction20 contracts$18.8M
- Contract not subject to state pre-audit20 contracts$18.0M
Contracts over time
Contracts started per year
View as table
| Year | Contracts |
|---|---|
| 2008: 3 contracts, $5.5M | 3 |
| 2009: 0 contracts, $0.0 | 0 |
| 2010: 0 contracts, $0.0 | 0 |
| 2011: 3 contracts, $1.1M | 3 |
| 2012: 4 contracts, $4.0M | 4 |
| 2013: 3 contracts, $1.5M | 3 |
| 2014: 0 contracts, $0.0 | 0 |
| 2015: 0 contracts, $0.0 | 0 |
| 2016: 5 contracts, $5.0M | 5 |
| 2017: 1 contracts, $1.0M | 1 |
| 2018: 0 contracts, $0.0 | 0 |
| 2019: 2 contracts, $1.5M | 2 |
| 2020: 5 contracts, $4.5M | 5 |
| 2021: 0 contracts, $0.0 | 0 |
| 2022: 0 contracts, $0.0 | 0 |
| 2023: 5 contracts, $4.2M | 5 |
| 2024: 1 contracts, $1.2M | 1 |
| 2025: 3 contracts, $2.8M | 3 |
| 2026: 5 contracts, $4.5M | 5 |
How the Contractor Score adds up
Extensive (A, 99/100): 7 active contracts, $37M in contracts.
- Contract volume+14.5measured
$37M in current contract value across 40 contracts, more than 93% of scored contractors.
- Recent activity+18.5measured
7 active contracts today; the most recent was approved in October 2026.
- Agency breadth+9.8measured
Contracts with 5 different state agencies and facilities.
- Experience+2.1measured
First contract started in April 2008 (18 years of contract history).
- Contract-type mix+5.0measured
5 contract types; the largest group is construction (51% of value). Goods and services contracts are 51% of the total.
- Spending vs. value−0.8measured
On 31 completed contracts with spending recorded, spending is 63% of the contract value. Spending below the full value is common (work can finish under budget) and isn't treated as a problem.
- Federal award history0.0unknown
No federal award history found. Scored as neutral.
- Federal registration0.0unknown
No federal contractor registration found. Scored as neutral.
50 + contributions = 99 (A, Extensive)Starts at 50. Bars: cool adds, warm subtracts.
Agencies served
Contract value with each agency or facility
Similar contractors
- A
Upstate Companies I LLC
Mount Upton, NYConstruction & Renovation
Since 201610 agencies
- Contract value
- $156.7M
- Contracts
- 104
- Active
- 22
- A
Patricia Electric Inc
Syracuse, NYConstruction & Renovation
Since 20088 agencies
- Contract value
- $35.2M
- Contracts
- 29
- Active
- 2
- A
Bellows Const Spec LLC
Construction & Renovation
Since 20096 agencies
- Contract value
- $19.9M
- Contracts
- 32
- Active
- 5
- A
Wilkins Mechanical Inc
Construction & Renovation
Since 200810 agencies
- Contract value
- $67.9M
- Contracts
- 125
- Active
- 0
- A
Titan Roofing Inc
Construction & Renovation
Since 200816 agencies
- Contract value
- $137.7M
- Contracts
- 128
- Active
- 7
- A
McGinnis Nelson Construction Inc
Construction & Renovation
Since 201110 agencies
- Contract value
- $7.0M
- Contracts
- 15
- Active
- 2
- More construction & renovation contractors Ranked by contract value
Browse more
- College at Cortland contractors
- Department of Environmental Conservation contractors
- College of Environmental Science & Forestry contractors
- College at Morrisville contractors
- Construction & Renovation contractors
- Top contractors
- All contractors
Contract figures are public New York State contract records as of Nov 13, 2026: current contract amounts and spending to date as reported. Company details are shown when we can match this contractor to a registered business with confidence.
RFP Detector is an independent service and is not affiliated with any government agency. Scores are informational.