Advanced Testing Systems Inc
AState contracts since 2001Updated Nov 13, 2026
Advanced Testing Systems Inc holds 37 contracts worth $6.4M with 16 New York State agencies, most with Rockland Psychiatric Center; 6 active today. The first started in 2001.
- Total contract value
- $6.4M
- Current contract amounts
- Spent to date
- $2.2M
- 35% of contract value
- Active contracts
- 6
- $2.7M in active value
- Contracts on record
- 37
- Since 2001
- Agencies served
- 16
- Most with Rockland Psychiatric Center
- Years active
- 25
- First contract 2001
Contact & company
Business information and how to reach the company.
Contracts
37 contracts with New York State agencies, active first. Open a row for the full record.
| Details | Contract | Type | Contract no. | Term | |||||
|---|---|---|---|---|---|---|---|---|---|
Inspection and testing of switchgear and ancillary equipment at NYC Children's Center - Brooklyn C202537Service: Building servicesActive | New York City Children's Center | Service: Building servicesService | C202537 | Jul 1, 2025to Jun 30, 2030 | Jul 1, 2025 | Jun 30, 2030 | $496,850$500 spent | $500 | |
Inspection and testing of switchgear and ancillary equipment at Rockland Psychiatric Center C202164Service: Building servicesActive | Rockland Psychiatric Center | Service: Building servicesService | C202164 | Jan 1, 2025to Dec 31, 2029 | Jan 1, 2025 | Dec 31, 2029 | $985,188$144,638 spent | $144,638 | |
Preventative maintenance of switchgear and ancillary equipment at Rockland Psychiatric Center C202151Service: Building servicesActive | Rockland Psychiatric Center - Children's Services | Service: Building servicesService | C202151 | Nov 1, 2024to Oct 31, 2029 | Nov 1, 2024 | Oct 31, 2029 | $323,925$10,800 spent | $10,800 | |
Preventive maintenance for electrical switchgear and equipment at Nathan Kline Institute C201841Service: Building servicesActive | Nathan S. Kline Institute | Service: Building servicesService | C201841 | Oct 1, 2024to Sep 30, 2029 | Oct 1, 2024 | Sep 30, 2029 | $384,464$41,575 spent | $41,575 | |
Inspection and testing of switchgear and ancillary equipment at NYC Children's Center - Queens C201908Service: Building servicesActive | New York City Children's Center | Service: Building servicesService | C201908 | Aug 1, 2023to Jul 31, 2029 | Aug 1, 2023 | Jul 31, 2029 | $385,650$19,340 spent | $19,340 | |
Electrical preventive maintenance CT23049Service: Building servicesActive | New York State Thruway Authority | Service: Building servicesService | CT23049 | Jul 10, 2023to May 31, 2028 | Jul 10, 2023 | May 31, 2028 | $117,225$0 spent | $0 | |
T&M Switchgear T202538Contract not subject to state pre-audit | New York City Children's Center | Contract not subject to state pre-auditNot pre-audited | T202538 | Jan 1, 2025to Jun 30, 2025 | Jan 1, 2025 | Jun 30, 2025 | $50,000$0 spent | $0 | |
Switchgear Inspection/Testing T202334Contract not subject to state pre-audit | Office of Mental Health | Contract not subject to state pre-auditNot pre-audited | T202334 | Aug 1, 2024to Aug 31, 2025 | Aug 1, 2024 | Aug 31, 2025 | $50,000$0 spent | $0 | |
T&M Switchgear T202331Contract not subject to state pre-audit | Nathan S. Kline Institute | Contract not subject to state pre-auditNot pre-audited | T202331 | Jul 1, 2024to Sep 30, 2024 | Jul 1, 2024 | Sep 30, 2024 | $50,000$0 spent | $0 | |
T&M Switchgear T202338Contract not subject to state pre-audit | Rockland Psychiatric Center | Contract not subject to state pre-auditNot pre-audited | T202338 | Jul 1, 2024to Oct 31, 2024 | Jul 1, 2024 | Oct 31, 2024 | $50,000$0 spent | $0 | |
Stopgap PM Switchgear Services T202322Contract not subject to state pre-audit | Manhattan Psychiatric Center | Contract not subject to state pre-auditNot pre-audited | T202322 | Jul 1, 2024to Oct 31, 2024 | Jul 1, 2024 | Oct 31, 2024 | $49,999$4,153 spent | $4,153 | |
Stopgap Switchgear T&M Service T202323Contract not subject to state pre-audit | Kingsboro Psychiatric Center | Contract not subject to state pre-auditNot pre-audited | T202323 | Jul 1, 2024to Dec 31, 2024 | Jul 1, 2024 | Dec 31, 2024 | $49,999$0 spent | $0 | |
Temp Switchgear PM services T202320Contract not subject to state pre-audit | Mid-Hudson Forensic Psychiatric Center | Contract not subject to state pre-auditNot pre-audited | T202320 | Jul 1, 2024to Oct 31, 2024 | Jul 1, 2024 | Oct 31, 2024 | $49,840$0 spent | $0 | |
Temp Switchgear PM services T202336Contract not subject to state pre-audit | Rockland Psychiatric Center - Children's Services | Contract not subject to state pre-auditNot pre-audited | T202336 | Jul 1, 2024to Oct 31, 2024 | Jul 1, 2024 | Oct 31, 2024 | $49,640$0 spent | $0 | |
Electrical Switchgear Testing T060122Contract not subject to state pre-audit | Wallkill Correctional Facility | Contract not subject to state pre-auditNot pre-audited | T060122 | Apr 15, 2023to Apr 14, 2024 | Apr 15, 2023 | Apr 14, 2024 | $46,900$25,600 spent | $25,600 | |
Inspection and testing of switchgear and ancillary equipment at Rockland Psychiatric Center C201366Service: Building services | Rockland Psychiatric Center | Service: Building servicesService | C201366 | Dec 1, 2022to Nov 30, 2024 | Dec 1, 2022 | Nov 30, 2024 | $137,720$137,720 spent | $137,720 | |
Inspection and testing of switchgear and ancillary equipment at NYC Childrens Center - Brooklyn C200946Service: Building services | New York City Children's Center | Service: Building servicesService | C200946 | Aug 1, 2022to Dec 31, 2024 | Aug 1, 2022 | Dec 31, 2024 | $65,490$31,670 spent | $31,670 | |
Switchgear T200971Contract not subject to state pre-audit | Rockland Psychiatric Center - Children's Services | Contract not subject to state pre-auditNot pre-audited | T200971 | Mar 1, 2022to Feb 29, 2024 | Mar 1, 2022 | Feb 29, 2024 | $41,960$23,520 spent | $23,520 | |
Inspection and testing of switchgear and ancillary equipment C200947Service: Building services | Rockland Psychiatric Center | Service: Building servicesService | C200947 | Nov 1, 2021to Oct 31, 2023 | Nov 1, 2021 | Oct 31, 2023 | $153,605$27,180 spent | $27,180 | |
Electrical switchgear testing and maintenance for Helen Hayes Hospital C000572Service: Building services | Helen Hayes Hospital | Service: Building servicesService | C000572 | Oct 1, 2021to Sep 30, 2026 | Oct 1, 2021 | Sep 30, 2026 | $115,720$53,770 spent | $53,770 |
Inspection and testing of switchgear and ancillary equipment at NYC Children's Center - BrooklynNew York City Children's CenterJul 1, 2025 – Jun 30, 2030Active$496,850
- Description
- Inspection and testing of switchgear and ancillary equipment at NYC Children's Center - Brooklyn
- Contract number
- C202537
- Type
- Service: Building servicesService
- Term
- Jul 1, 2025 → Jun 30, 20305 years
- Approved
- Jun 10, 2025
- Status
- Active
- Amount
- $496,850
- Spent to date
- $500 · 0% of the amount
Inspection and testing of switchgear and ancillary equipment at Rockland Psychiatric CenterRockland Psychiatric CenterJan 1, 2025 – Dec 31, 2029Active$985,188
- Description
- Inspection and testing of switchgear and ancillary equipment at Rockland Psychiatric Center
- Contract number
- C202164
- Type
- Service: Building servicesService
- Term
- Jan 1, 2025 → Dec 31, 20295 years
- Approved
- Oct 7, 2024
- Status
- Active
- Amount
- $985,188
- Spent to date
- $144,638 · 15% of the amount
Preventative maintenance of switchgear and ancillary equipment at Rockland Psychiatric CenterRockland Psychiatric Center - Children's ServicesNov 1, 2024 – Oct 31, 2029Active$323,925
- Description
- Preventative maintenance of switchgear and ancillary equipment at Rockland Psychiatric Center
- Contract number
- C202151
- Type
- Service: Building servicesService
- Term
- Nov 1, 2024 → Oct 31, 20295 years
- Approved
- Aug 21, 2024
- Status
- Active
- Amount
- $323,925
- Spent to date
- $10,800 · 3% of the amount
Preventive maintenance for electrical switchgear and equipment at Nathan Kline InstituteNathan S. Kline InstituteOct 1, 2024 – Sep 30, 2029Active$384,464
- Description
- Preventive maintenance for electrical switchgear and equipment at Nathan Kline Institute
- Contract number
- C201841
- Type
- Service: Building servicesService
- Term
- Oct 1, 2024 → Sep 30, 20295 years
- Approved
- May 17, 2024
- Status
- Active
- Amount
- $384,464
- Spent to date
- $41,575 · 11% of the amount
Inspection and testing of switchgear and ancillary equipment at NYC Children's Center - QueensNew York City Children's CenterAug 1, 2023 – Jul 31, 2029Active$385,650
- Description
- Inspection and testing of switchgear and ancillary equipment at NYC Children's Center - Queens
- Contract number
- C201908
- Type
- Service: Building servicesService
- Term
- Aug 1, 2023 → Jul 31, 20296 years
- Approved
- Oct 11, 2023
- Status
- Active
- Amount
- $385,650
- Spent to date
- $19,340 · 5% of the amount
Electrical preventive maintenanceNew York State Thruway AuthorityJul 10, 2023 – May 31, 2028Active$117,225
- Description
- Electrical preventive maintenance
- Contract number
- CT23049
- Type
- Service: Building servicesService
- Term
- Jul 10, 2023 → May 31, 20284.9 years
- Approved
- Jul 20, 2023
- Status
- Active
- Amount
- $117,225
- Spent to date
- $0 · 0% of the amount
T&M SwitchgearNew York City Children's CenterJan 1, 2025 – Jun 30, 2025$50,000
- Description
- T&M Switchgear
- Contract number
- T202538
- Type
- Contract not subject to state pre-auditNot pre-audited
- Term
- Jan 1, 2025 → Jun 30, 20256 months
- Approved
- Feb 4, 2025
- Status
- Ended
- Amount
- $50,000
- Spent to date
- $0 · 0% of the amount
Switchgear Inspection/TestingOffice of Mental HealthAug 1, 2024 – Aug 31, 2025$50,000
- Description
- Switchgear Inspection/Testing
- Contract number
- T202334
- Type
- Contract not subject to state pre-auditNot pre-audited
- Agency
- Office of Mental Health
- Term
- Aug 1, 2024 → Aug 31, 202513 months
- Approved
- Aug 15, 2024
- Status
- Ended
- Amount
- $50,000
- Spent to date
- $0 · 0% of the amount
T&M SwitchgearNathan S. Kline InstituteJul 1, 2024 – Sep 30, 2024$50,000
- Description
- T&M Switchgear
- Contract number
- T202331
- Type
- Contract not subject to state pre-auditNot pre-audited
- Term
- Jul 1, 2024 → Sep 30, 20243 months
- Approved
- Aug 1, 2024
- Status
- Ended
- Amount
- $50,000
- Spent to date
- $0 · 0% of the amount
T&M SwitchgearRockland Psychiatric CenterJul 1, 2024 – Oct 31, 2024$50,000
- Description
- T&M Switchgear
- Contract number
- T202338
- Type
- Contract not subject to state pre-auditNot pre-audited
- Term
- Jul 1, 2024 → Oct 31, 20244 months
- Approved
- Aug 1, 2024
- Status
- Ended
- Amount
- $50,000
- Spent to date
- $0 · 0% of the amount
Stopgap PM Switchgear ServicesManhattan Psychiatric CenterJul 1, 2024 – Oct 31, 2024$49,999
- Description
- Stopgap PM Switchgear Services
- Contract number
- T202322
- Type
- Contract not subject to state pre-auditNot pre-audited
- Term
- Jul 1, 2024 → Oct 31, 20244 months
- Approved
- Jul 8, 2024
- Status
- Ended
- Amount
- $49,999
- Spent to date
- $4,153 · 8% of the amount
Stopgap Switchgear T&M ServiceKingsboro Psychiatric CenterJul 1, 2024 – Dec 31, 2024$49,999
- Description
- Stopgap Switchgear T&M Service
- Contract number
- T202323
- Type
- Contract not subject to state pre-auditNot pre-audited
- Term
- Jul 1, 2024 → Dec 31, 20246 months
- Approved
- Jul 8, 2024
- Status
- Ended
- Amount
- $49,999
- Spent to date
- $0 · 0% of the amount
Temp Switchgear PM servicesMid-Hudson Forensic Psychiatric CenterJul 1, 2024 – Oct 31, 2024$49,840
- Description
- Temp Switchgear PM services
- Contract number
- T202320
- Type
- Contract not subject to state pre-auditNot pre-audited
- Term
- Jul 1, 2024 → Oct 31, 20244 months
- Approved
- Jul 25, 2024
- Status
- Ended
- Amount
- $49,840
- Spent to date
- $0 · 0% of the amount
Temp Switchgear PM servicesRockland Psychiatric Center - Children's ServicesJul 1, 2024 – Oct 31, 2024$49,640
- Description
- Temp Switchgear PM services
- Contract number
- T202336
- Type
- Contract not subject to state pre-auditNot pre-audited
- Term
- Jul 1, 2024 → Oct 31, 20244 months
- Approved
- Jul 25, 2024
- Status
- Ended
- Amount
- $49,640
- Spent to date
- $0 · 0% of the amount
Electrical Switchgear TestingWallkill Correctional FacilityApr 15, 2023 – Apr 14, 2024$46,900
- Description
- Electrical Switchgear Testing
- Contract number
- T060122
- Type
- Contract not subject to state pre-auditNot pre-audited
- Term
- Apr 15, 2023 → Apr 14, 202412 months
- Approved
- Mar 19, 2023
- Status
- Ended
- Amount
- $46,900
- Spent to date
- $25,600 · 55% of the amount
Inspection and testing of switchgear and ancillary equipment at Rockland Psychiatric CenterRockland Psychiatric CenterDec 1, 2022 – Nov 30, 2024$137,720
- Description
- Inspection and testing of switchgear and ancillary equipment at Rockland Psychiatric Center
- Contract number
- C201366
- Type
- Service: Building servicesService
- Term
- Dec 1, 2022 → Nov 30, 20242 years
- Approved
- Nov 17, 2022
- Status
- Ended
- Amount
- $137,720
- Spent to date
- $137,720 · 100% of the amount
Inspection and testing of switchgear and ancillary equipment at NYC Childrens Center - BrooklynNew York City Children's CenterAug 1, 2022 – Dec 31, 2024$65,490
- Description
- Inspection and testing of switchgear and ancillary equipment at NYC Childrens Center - Brooklyn
- Contract number
- C200946
- Type
- Service: Building servicesService
- Term
- Aug 1, 2022 → Dec 31, 20242.4 years
- Approved
- Aug 1, 2022
- Status
- Ended
- Amount
- $65,490
- Spent to date
- $31,670 · 48% of the amount
SwitchgearRockland Psychiatric Center - Children's ServicesMar 1, 2022 – Feb 29, 2024$41,960
- Description
- Switchgear
- Contract number
- T200971
- Type
- Contract not subject to state pre-auditNot pre-audited
- Term
- Mar 1, 2022 → Feb 29, 20242 years
- Approved
- Apr 12, 2024
- Status
- Ended
- Amount
- $41,960
- Spent to date
- $23,520 · 56% of the amount
Inspection and testing of switchgear and ancillary equipmentRockland Psychiatric CenterNov 1, 2021 – Oct 31, 2023$153,605
- Description
- Inspection and testing of switchgear and ancillary equipment
- Contract number
- C200947
- Type
- Service: Building servicesService
- Term
- Nov 1, 2021 → Oct 31, 20232 years
- Approved
- Jun 3, 2021
- Status
- Ended
- Amount
- $153,605
- Spent to date
- $27,180 · 18% of the amount
Electrical switchgear testing and maintenance for Helen Hayes HospitalHelen Hayes HospitalOct 1, 2021 – Sep 30, 2026$115,720
- Description
- Electrical switchgear testing and maintenance for Helen Hayes Hospital
- Contract number
- C000572
- Type
- Service: Building servicesService
- Agency
- Helen Hayes Hospital
- Term
- Oct 1, 2021 → Sep 30, 20265 years
- Approved
- Sep 13, 2021
- Status
- Ended
- Amount
- $115,720
- Spent to date
- $53,770 · 46% of the amount
Contract-type mix
Share of contract value by type
- Service19 contracts$5.3M
- Contract not subject to state pre-audit16 contracts$715.4K
- Commodity: Maintenance, industry supplies and equipment2 contracts$294.5K
Contracts over time
Contracts started per year
View as table
| Year | Contracts |
|---|---|
| 2007: 0 contracts, $0.0 | 0 |
| 2008: 1 contracts, $16.4K | 1 |
| 2009: 0 contracts, $0.0 | 0 |
| 2010: 2 contracts, $57.7K | 2 |
| 2011: 1 contracts, $38.6K | 1 |
| 2012: 2 contracts, $158.7K | 2 |
| 2013: 2 contracts, $261.8K | 2 |
| 2014: 0 contracts, $0.0 | 0 |
| 2015: 0 contracts, $0.0 | 0 |
| 2016: 3 contracts, $215.7K | 3 |
| 2017: 1 contracts, $44.1K | 1 |
| 2018: 1 contracts, $94.4K | 1 |
| 2019: 0 contracts, $0.0 | 0 |
| 2020: 1 contracts, $179.2K | 1 |
| 2021: 4 contracts, $420.7K | 4 |
| 2022: 3 contracts, $245.2K | 3 |
| 2023: 3 contracts, $549.8K | 3 |
| 2024: 9 contracts, $1.1M | 9 |
| 2025: 3 contracts, $1.5M | 3 |
| 2026: 0 contracts, $0.0 | 0 |
How the Contractor Score adds up
Extensive (A, 98/100): 6 active contracts, works with 16 agencies.
- Contract volume+8.8measured
$6.4M in current contract value across 37 contracts, more than 82% of scored contractors.
- Recent activity+16.0measured
6 active contracts today; the most recent was approved in June 2025.
- Agency breadth+13.8measured
Contracts with 16 different state agencies and facilities.
- Experience+3.3measured
First contract started in March 2001 (25 years of contract history).
- Contract-type mix+7.0measured
5 contract types; the largest group is services (84% of value). Goods and services contracts are 89% of the total.
- Spending vs. value−0.8measured
On 21 completed contracts with spending recorded, spending is 64% of the contract value. Spending below the full value is common (work can finish under budget) and isn't treated as a problem.
- Federal award history0.0unknown
No federal award history found. Scored as neutral.
- Federal registration0.0unknown
No federal contractor registration found. Scored as neutral.
50 + contributions = 98 (A, Extensive)Starts at 50. Bars: cool adds, warm subtracts.
Agencies served
Contract value with each agency or facility
- Rockland Psychiatric Center6 contracts$1.5M
- Office of General Services1 contract$1.5M
- New York City Children's Center4 contracts$998.0K
- Nathan S. Kline Institute3 contracts$490.0K
- Rockland Psychiatric Center - Children's Services3 contracts$415.5K
- New York State Thruway Authority4 contracts$294.7K
- Mid-Hudson Forensic Psychiatric Center4 contracts$257.7K
- Manhattan Psychiatric Center2 contracts$245.1K
- Helen Hayes Hospital2 contracts$215.1K
- Creedmoor Psychiatric Center1 contract$179.2K
- Office of Mental Health2 contracts$92.8K
- Kingsboro Psychiatric Center1 contract$50.0K
And 4 more agencies in the contracts table.
Similar contractors
- A
Johnson Controls Inc
Facilities, Maintenance & Janitorial
Since 200344 agencies
- Contract value
- $318.4M
- Contracts
- 175
- Active
- 19
- A
New York State Industries for the Disabled Inc
Albany, NYFacilities, Maintenance & Janitorial
Since 1986117 agencies
- Contract value
- $2.2B
- Contracts
- 1,684
- Active
- 313
- A
Otis Elevator Company
Farmington, CTFacilities, Maintenance & Janitorial
Since 200053 agencies
- Contract value
- $153.8M
- Contracts
- 168
- Active
- 22
- A
Syntec Corporation
Facilities, Maintenance & Janitorial
Since 201511 agencies
- Contract value
- $6.1M
- Contracts
- 19
- Active
- 5
- A
Lifeline Energy Solutions Inc
Facilities, Maintenance & Janitorial
Since 202015 agencies
- Contract value
- $21.9M
- Contracts
- 23
- Active
- 10
- A
Emcor Services New York New Jersey Inc
Plainview, NYFacilities, Maintenance & Janitorial
Since 201516 agencies
- Contract value
- $26.9M
- Contracts
- 37
- Active
- 15
- More facilities, maintenance & janitorial contractors Ranked by contract value
Browse more
- Rockland Psychiatric Center contractors
- Office of General Services contractors
- New York City Children's Center contractors
- Nathan S. Kline Institute contractors
- Facilities, Maintenance & Janitorial contractors
- Top contractors
- All contractors
Contract figures are public New York State contract records as of Nov 13, 2026: current contract amounts and spending to date as reported. Company details are shown when we can match this contractor to a registered business with confidence.
RFP Detector is an independent service and is not affiliated with any government agency. Scores are informational.