Aow Associates Inc
AState contracts since 2009Updated Nov 13, 2026
Aow Associates Inc holds 37 contracts worth $99.1M with 6 New York State agencies, most with State University Construction Fund; none active today. The first started in 2009.
- Total contract value
- $99.1M
- Current contract amounts
- Spent to date
- $94.4M
- 95% of contract value
- Active contracts
- 0
- None active today
- Contracts on record
- 37
- Since 2009
- Agencies served
- 6
- Most with State University Construction Fund
- Years active
- 17
- First contract 2009
Contact & company
Business information and how to reach the company.
Contracts
37 contracts with New York State agencies, active first. Open a row for the full record.
| Details | Contract | Type | Contract no. | Term | |||||
|---|---|---|---|---|---|---|---|---|---|
Plaza rehabilitation on the fifth floor south at SUNY System Administration (Albany) D006770Construction: Building | State University Construction Fund | Construction: BuildingConstruction | D006770 | Oct 20, 2022to Dec 19, 2024 | Oct 20, 2022 | Dec 19, 2024 | $4,317,043$4,317,043 spent | $4,317,043 | |
Rehabilitate office & building entrance DMNA Headquarters general construction Albany County D46227CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D46227C | Aug 8, 2022to Jul 26, 2024 | Aug 8, 2022 | Jul 26, 2024 | $3,252,528$3,250,358 spent | $3,250,358 | |
ETEC breakout project #2 - balloon inflation launch station D210075Construction: Miscellaneous | SUNY at Albany | Construction: MiscellaneousConstruction | D210075 | May 5, 2022to Sep 18, 2024 | May 5, 2022 | Sep 18, 2024 | $676,070$676,070 spent | $676,070 | |
Phase IV of lecture center renovations at the University at Albany D006708Construction: Miscellaneous | State University Construction Fund | Construction: MiscellaneousConstruction | D006708 | Apr 19, 2022to Aug 15, 2024 | Apr 19, 2022 | Aug 15, 2024 | $5,871,707$5,871,707 spent | $5,871,707 | |
Renovate gym & infill pool in the Physical Education Building Albany campus D006685Construction: Building | State University Construction Fund | Construction: BuildingConstruction | D006685 | Dec 17, 2021to May 1, 2025 | Dec 17, 2021 | May 1, 2025 | $3,729,686$3,729,686 spent | $3,729,686 | |
Rehab toilets for ADA compliance at SUNY Albany biology, chemistry and physics buildings D006670Construction: Miscellaneous | State University Construction Fund | Construction: MiscellaneousConstruction | D006670 | Oct 22, 2021to Jun 13, 2024 | Oct 22, 2021 | Jun 13, 2024 | $2,370,377$2,370,377 spent | $2,370,377 | |
Business building classroom re T210025Contract not subject to state pre-audit | SUNY at Albany | Contract not subject to state pre-auditNot pre-audited | T210025 | Sep 15, 2021to Feb 15, 2022 | Sep 15, 2021 | Feb 15, 2022 | $214,988$214,988 spent | $214,988 | |
Bouck Hall renovation at bookstore and related student life D006641Construction: Building | State University Construction Fund | Construction: BuildingConstruction | D006641 | Jun 28, 2021to Sep 26, 2023 | Jun 28, 2021 | Sep 26, 2023 | $3,685,641$3,685,641 spent | $3,685,641 | |
Phase III of the lecture center renovation at SUNY Albany D006597Construction: Building | State University Construction Fund | Construction: BuildingConstruction | D006597 | Dec 8, 2020to Nov 8, 2022 | Dec 8, 2020 | Nov 8, 2022 | $3,425,831$3,425,831 spent | $3,425,831 | |
SUCF011032 Renovate Building T006556Contract not subject to state pre-audit | State University Construction Fund | Contract not subject to state pre-auditNot pre-audited | T006556 | Oct 6, 2020to Dec 6, 2022 | Oct 6, 2020 | Dec 6, 2022 | $9,072,496$9,072,496 spent | $9,072,496 | |
Project d37919c bathroom upgra T000753Contract not subject to state pre-audit | College of Agriculture and Technology at Cobleskill | Contract not subject to state pre-auditNot pre-audited | T000753 | Jan 15, 2020to Feb 28, 2021 | Jan 15, 2020 | Feb 28, 2021 | $2,744,682$2,744,346 spent | $2,744,346 | |
Class lab phase vi constructio T005502Contract not subject to state pre-audit | SUNY at Albany | Contract not subject to state pre-auditNot pre-audited | T005502 | Feb 21, 2019to Oct 31, 2020 | Feb 21, 2019 | Oct 31, 2020 | $3,277,492$3,276,692 spent | $3,276,692 | |
Renovate biology 2ND floor, fo T005469Contract not subject to state pre-audit | SUNY at Albany | Contract not subject to state pre-auditNot pre-audited | T005469 | Oct 19, 2018to Dec 31, 2019 | Oct 19, 2018 | Dec 31, 2019 | $458,805$458,805 spent | $458,805 | |
Class lab phase v renovations T005345Contract not subject to state pre-audit | SUNY at Albany | Contract not subject to state pre-auditNot pre-audited | T005345 | Jun 26, 2017to Dec 31, 2019 | Jun 26, 2017 | Dec 31, 2019 | $1,630,033$1,630,033 spent | $1,630,033 | |
Renovate library basement for T005254Contract not subject to state pre-audit | SUNY at Albany | Contract not subject to state pre-auditNot pre-audited | T005254 | Nov 25, 2016to Dec 31, 2017 | Nov 25, 2016 | Dec 31, 2017 | $1,575,567$1,575,549 spent | $1,575,549 | |
SUCF 01A47 Renovate Health Ce T006244Contract not subject to state pre-audit | State University Construction Fund | Contract not subject to state pre-auditNot pre-audited | T006244 | Jul 11, 2016to Feb 1, 2019 | Jul 11, 2016 | Feb 1, 2019 | $921,220$921,220 spent | $921,220 | |
PA Filed Contract-SUNY Alb. Eastman,Stuyvesant&Livingston Towers Elev. Renovation&Asbestos Abatement D191023Contract not subject to state pre-audit | Dormitory Authority of the State of New York | Contract not subject to state pre-auditNot pre-audited | D191023 | Jan 26, 2016to Aug 13, 2018 | Jan 26, 2016 | Aug 13, 2018 | $4,591,000$0 spent | $0 | |
SUCF 01A47 Renovate Health Ce T006177Contract not subject to state pre-audit | State University Construction Fund | Contract not subject to state pre-auditNot pre-audited | T006177 | Oct 12, 2015to Feb 1, 2019 | Oct 12, 2015 | Feb 1, 2019 | $10,533,970$10,530,970 spent | $10,530,970 | |
SUCF 01A47 Renovate Health Ce T006177Contract not subject to state pre-audit | State University Construction Fund | Contract not subject to state pre-auditNot pre-audited | T006177 | Oct 12, 2015to Apr 26, 2018 | Oct 12, 2015 | Apr 26, 2018 | $0$0 spent | $0 | |
Provide Visitor Bld&Site Improvements@Five Rivers Environ.Educ.Ctr. (Gen.Constr.portion of 4 Trade) D43153CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D43153C | Sep 10, 2015to Aug 11, 2017 | Sep 10, 2015 | Aug 11, 2017 | $5,289,517$5,288,728 spent | $5,288,728 |
Plaza rehabilitation on the fifth floor south at SUNY System Administration (Albany)State University Construction FundOct 20, 2022 – Dec 19, 2024$4,317,043
- Description
- Plaza rehabilitation on the fifth floor south at SUNY System Administration (Albany)
- Contract number
- D006770
- Type
- Construction: BuildingConstruction
- Term
- Oct 20, 2022 → Dec 19, 20242.2 years
- Approved
- Oct 18, 2022
- Status
- Ended
- Amount
- $4,317,043
- Spent to date
- $4,317,043 · 100% of the amount
Rehabilitate office & building entrance DMNA Headquarters general construction Albany CountyOffice of General Services - Design & ConstructionAug 8, 2022 – Jul 26, 2024$3,252,528
- Description
- Rehabilitate office & building entrance DMNA Headquarters general construction Albany County
- Contract number
- D46227C
- Type
- Construction: BuildingConstruction
- Term
- Aug 8, 2022 → Jul 26, 20242 years
- Approved
- Aug 8, 2022
- Status
- Ended
- Amount
- $3,252,528
- Spent to date
- $3,250,358 · 100% of the amount
ETEC breakout project #2 - balloon inflation launch stationSUNY at AlbanyMay 5, 2022 – Sep 18, 2024$676,070
- Description
- ETEC breakout project #2 - balloon inflation launch station
- Contract number
- D210075
- Type
- Construction: MiscellaneousConstruction
- Agency
- SUNY at Albany
- Term
- May 5, 2022 → Sep 18, 20242.3 years
- Approved
- May 5, 2022
- Status
- Ended
- Amount
- $676,070
- Spent to date
- $676,070 · 100% of the amount
Phase IV of lecture center renovations at the University at AlbanyState University Construction FundApr 19, 2022 – Aug 15, 2024$5,871,707
- Description
- Phase IV of lecture center renovations at the University at Albany
- Contract number
- D006708
- Type
- Construction: MiscellaneousConstruction
- Term
- Apr 19, 2022 → Aug 15, 20242.3 years
- Approved
- Apr 13, 2022
- Status
- Ended
- Amount
- $5,871,707
- Spent to date
- $5,871,707 · 100% of the amount
Renovate gym & infill pool in the Physical Education Building Albany campusState University Construction FundDec 17, 2021 – May 1, 2025$3,729,686
- Description
- Renovate gym & infill pool in the Physical Education Building Albany campus
- Contract number
- D006685
- Type
- Construction: BuildingConstruction
- Term
- Dec 17, 2021 → May 1, 20253.3 years
- Approved
- Dec 14, 2021
- Status
- Ended
- Amount
- $3,729,686
- Spent to date
- $3,729,686 · 100% of the amount
Rehab toilets for ADA compliance at SUNY Albany biology, chemistry and physics buildingsState University Construction FundOct 22, 2021 – Jun 13, 2024$2,370,377
- Description
- Rehab toilets for ADA compliance at SUNY Albany biology, chemistry and physics buildings
- Contract number
- D006670
- Type
- Construction: MiscellaneousConstruction
- Term
- Oct 22, 2021 → Jun 13, 20242.7 years
- Approved
- Oct 19, 2021
- Status
- Ended
- Amount
- $2,370,377
- Spent to date
- $2,370,377 · 100% of the amount
Business building classroom reSUNY at AlbanySep 15, 2021 – Feb 15, 2022$214,988
- Description
- Business building classroom re
- Contract number
- T210025
- Type
- Contract not subject to state pre-auditNot pre-audited
- Agency
- SUNY at Albany
- Term
- Sep 15, 2021 → Feb 15, 20225 months
- Approved
- Sep 17, 2021
- Status
- Ended
- Amount
- $214,988
- Spent to date
- $214,988 · 100% of the amount
Bouck Hall renovation at bookstore and related student lifeState University Construction FundJun 28, 2021 – Sep 26, 2023$3,685,641
- Description
- Bouck Hall renovation at bookstore and related student life
- Contract number
- D006641
- Type
- Construction: BuildingConstruction
- Term
- Jun 28, 2021 → Sep 26, 20232.3 years
- Approved
- Jun 18, 2021
- Status
- Ended
- Amount
- $3,685,641
- Spent to date
- $3,685,641 · 100% of the amount
Phase III of the lecture center renovation at SUNY AlbanyState University Construction FundDec 8, 2020 – Nov 8, 2022$3,425,831
- Description
- Phase III of the lecture center renovation at SUNY Albany
- Contract number
- D006597
- Type
- Construction: BuildingConstruction
- Term
- Dec 8, 2020 → Nov 8, 20221.9 years
- Approved
- Nov 25, 2020
- Status
- Ended
- Amount
- $3,425,831
- Spent to date
- $3,425,831 · 100% of the amount
SUCF011032 Renovate BuildingState University Construction FundOct 6, 2020 – Dec 6, 2022$9,072,496
- Description
- SUCF011032 Renovate Building
- Contract number
- T006556
- Type
- Contract not subject to state pre-auditNot pre-audited
- Term
- Oct 6, 2020 → Dec 6, 20222.2 years
- Approved
- Oct 13, 2020
- Status
- Ended
- Amount
- $9,072,496
- Spent to date
- $9,072,496 · 100% of the amount
Project d37919c bathroom upgraCollege of Agriculture and Technology at CobleskillJan 15, 2020 – Feb 28, 2021$2,744,682
- Description
- Project d37919c bathroom upgra
- Contract number
- T000753
- Type
- Contract not subject to state pre-auditNot pre-audited
- Term
- Jan 15, 2020 → Feb 28, 202113 months
- Approved
- Mar 24, 2020
- Status
- Ended
- Amount
- $2,744,682
- Spent to date
- $2,744,346 · 100% of the amount
Class lab phase vi constructioSUNY at AlbanyFeb 21, 2019 – Oct 31, 2020$3,277,492
- Description
- Class lab phase vi constructio
- Contract number
- T005502
- Type
- Contract not subject to state pre-auditNot pre-audited
- Agency
- SUNY at Albany
- Term
- Feb 21, 2019 → Oct 31, 20201.7 years
- Approved
- May 5, 2019
- Status
- Ended
- Amount
- $3,277,492
- Spent to date
- $3,276,692 · 100% of the amount
Renovate biology 2ND floor, foSUNY at AlbanyOct 19, 2018 – Dec 31, 2019$458,805
- Description
- Renovate biology 2ND floor, fo
- Contract number
- T005469
- Type
- Contract not subject to state pre-auditNot pre-audited
- Agency
- SUNY at Albany
- Term
- Oct 19, 2018 → Dec 31, 201914 months
- Approved
- Dec 13, 2018
- Status
- Ended
- Amount
- $458,805
- Spent to date
- $458,805 · 100% of the amount
Class lab phase v renovationsSUNY at AlbanyJun 26, 2017 – Dec 31, 2019$1,630,033
- Description
- Class lab phase v renovations
- Contract number
- T005345
- Type
- Contract not subject to state pre-auditNot pre-audited
- Agency
- SUNY at Albany
- Term
- Jun 26, 2017 → Dec 31, 20192.5 years
- Approved
- Sep 7, 2017
- Status
- Ended
- Amount
- $1,630,033
- Spent to date
- $1,630,033 · 100% of the amount
Renovate library basement forSUNY at AlbanyNov 25, 2016 – Dec 31, 2017$1,575,567
- Description
- Renovate library basement for
- Contract number
- T005254
- Type
- Contract not subject to state pre-auditNot pre-audited
- Agency
- SUNY at Albany
- Term
- Nov 25, 2016 → Dec 31, 201713 months
- Approved
- Dec 10, 2016
- Status
- Ended
- Amount
- $1,575,567
- Spent to date
- $1,575,549 · 100% of the amount
SUCF 01A47 Renovate Health CeState University Construction FundJul 11, 2016 – Feb 1, 2019$921,220
- Description
- SUCF 01A47 Renovate Health Ce
- Contract number
- T006244
- Type
- Contract not subject to state pre-auditNot pre-audited
- Term
- Jul 11, 2016 → Feb 1, 20192.6 years
- Approved
- Jul 19, 2016
- Status
- Ended
- Amount
- $921,220
- Spent to date
- $921,220 · 100% of the amount
PA Filed Contract-SUNY Alb. Eastman,Stuyvesant&Livingston Towers Elev. Renovation&Asbestos AbatementDormitory Authority of the State of New YorkJan 26, 2016 – Aug 13, 2018$4,591,000
- Description
- PA Filed Contract-SUNY Alb. Eastman,Stuyvesant&Livingston Towers Elev. Renovation&Asbestos Abatement
- Contract number
- D191023
- Type
- Contract not subject to state pre-auditNot pre-audited
- Term
- Jan 26, 2016 → Aug 13, 20182.6 years
- Approved
- Feb 8, 2016
- Status
- Ended
- Amount
- $4,591,000
- Spent to date
- $0 · 0% of the amount
SUCF 01A47 Renovate Health CeState University Construction FundOct 12, 2015 – Feb 1, 2019$10,533,970
- Description
- SUCF 01A47 Renovate Health Ce
- Contract number
- T006177
- Type
- Contract not subject to state pre-auditNot pre-audited
- Term
- Oct 12, 2015 → Feb 1, 20193.3 years
- Approved
- Nov 23, 2015
- Status
- Ended
- Amount
- $10,533,970
- Spent to date
- $10,530,970 · 100% of the amount
SUCF 01A47 Renovate Health CeState University Construction FundOct 12, 2015 – Apr 26, 2018$0
- Description
- SUCF 01A47 Renovate Health Ce
- Contract number
- T006177
- Type
- Contract not subject to state pre-auditNot pre-audited
- Term
- Oct 12, 2015 → Apr 26, 20182.5 years
- Approved
- Dec 21, 2015
- Status
- Ended
- Amount
- $0
- Spent to date
- $0 · 0% of the amount
Provide Visitor Bld&Site Improvements@Five Rivers Environ.Educ.Ctr. (Gen.Constr.portion of 4 Trade)Office of General Services - Design & ConstructionSep 10, 2015 – Aug 11, 2017$5,289,517
- Description
- Provide Visitor Bld&Site Improvements@Five Rivers Environ.Educ.Ctr. (Gen.Constr.portion of 4 Trade)
- Contract number
- D43153C
- Type
- Construction: BuildingConstruction
- Term
- Sep 10, 2015 → Aug 11, 20171.9 years
- Approved
- Sep 10, 2015
- Status
- Ended
- Amount
- $5,289,517
- Spent to date
- $5,288,728 · 100% of the amount
Contract-type mix
Share of contract value by type
- Contract not subject to state pre-audit21 contracts$55.1M
- Construction16 contracts$44.0M
Contracts over time
Contracts started per year
View as table
| Year | Contracts |
|---|---|
| 2009: 3 contracts, $4.5M | 3 |
| 2010: 3 contracts, $1.7M | 3 |
| 2011: 4 contracts, $6.7M | 4 |
| 2012: 2 contracts, $10.0M | 2 |
| 2013: 3 contracts, $7.9M | 3 |
| 2014: 0 contracts, $0.0 | 0 |
| 2015: 5 contracts, $16.4M | 5 |
| 2016: 3 contracts, $7.1M | 3 |
| 2017: 1 contracts, $1.6M | 1 |
| 2018: 1 contracts, $458.8K | 1 |
| 2019: 1 contracts, $3.3M | 1 |
| 2020: 3 contracts, $15.2M | 3 |
| 2021: 4 contracts, $10.0M | 4 |
| 2022: 4 contracts, $14.1M | 4 |
| 2023: 0 contracts, $0.0 | 0 |
| 2024: 0 contracts, $0.0 | 0 |
| 2025: 0 contracts, $0.0 | 0 |
| 2026: 0 contracts, $0.0 | 0 |
How the Contractor Score adds up
Extensive (A, 84/100): $99M in contracts, works with 6 agencies.
- Contract volume+17.7measured
$99M in current contract value across 37 contracts, more than 97% of scored contractors.
- Recent activity+0.2measured
No active contracts today; the most recent was approved in October 2022.
- Agency breadth+10.3measured
Contracts with 6 different state agencies and facilities.
- Experience+1.7measured
First contract started in June 2009 (17 years of contract history).
- Contract-type mix+3.5measured
3 contract types; the largest group is contracts exempt from state pre-audit (56% of value). Goods and services contracts are 44% of the total.
- Spending vs. value+0.1measured
On 35 completed contracts with spending recorded, spending is 100% of the contract value. Spending below the full value is common (work can finish under budget) and isn't treated as a problem.
- Federal award history0.0unknown
No federal award history found. Scored as neutral.
- Federal registration0.0unknown
No federal contractor registration found. Scored as neutral.
50 + contributions = 84 (A, Extensive)Starts at 50. Bars: cool adds, warm subtracts.
Agencies served
Contract value with each agency or facility
- State University Construction Fund14 contracts$51.5M
- SUNY at Albany14 contracts$23.2M
- Office of General Services - Design & Construction4 contracts$9.1M
- Office of Parks Recreation & Historic Preservation3 contracts$7.9M
- Dormitory Authority of the State of New York1 contract$4.6M
- College of Agriculture and Technology at Cobleskill1 contract$2.7M
Similar contractors
- A
Digesare Mechanical Inc
Construction & Renovation
Since 200810 agencies
- Contract value
- $264.4M
- Contracts
- 156
- Active
- 11
- A
John W Danforth Company
Tonawanda, NYConstruction & Renovation
Since 200722 agencies
- Contract value
- $97.0M
- Contracts
- 160
- Active
- 14
- A
J & K Plumbing and Heating Co Inc
Construction & Renovation
Since 200810 agencies
- Contract value
- $93.8M
- Contracts
- 77
- Active
- 4
- A
James H Maloy Inc
Loudonville, NYConstruction & Renovation
Since 20068 agencies
- Contract value
- $105.6M
- Contracts
- 35
- Active
- 2
- A
Matco Electric Corporation
Vestal, NYConstruction & Renovation
Since 200942 agencies
- Contract value
- $85.8M
- Contracts
- 118
- Active
- 16
- A
Aow Construction LLC
Construction & Renovation
Since 20226 agencies
- Contract value
- $83.6M
- Contracts
- 17
- Active
- 7
- More construction & renovation contractors Ranked by contract value
Browse more
- State University Construction Fund contractors
- SUNY at Albany contractors
- Office of General Services - Design & Construction contractors
- Office of Parks Recreation & Historic Preservation contractors
- Construction & Renovation contractors
- Top contractors
- All contractors
Contract figures are public New York State contract records as of Nov 13, 2026: current contract amounts and spending to date as reported. Company details are shown when we can match this contractor to a registered business with confidence.