Boilermatic Welding Industries Inc
AMedford, NY State contracts since 2007Updated Nov 13, 2026
Boilermatic Welding Industries Inc holds 26 contracts worth $214.8M with 5 New York State agencies, most with SUNY at Stony Brook; 3 active today. The first started in 2007.
- Total contract value
- $214.8M
- Current contract amounts
- Spent to date
- $133.1M
- 62% of contract value
- Active contracts
- 3
- $62.4M in active value
- Contracts on record
- 26
- Since 2007
- Agencies served
- 5
- Most with SUNY at Stony Brook
- Years active
- 19
- First contract 2007
Contact & company
Business information and how to reach the company.
Phone
Address
- Legal name
- Boilermatic Welding Industries, Inc.Doing business as Boilermatic Welding Industries Inc
- Identifiers
- UEI XZ1EJQ9D6CA7 · CAGE 3NBK0
- Federal registration
- Active · renews by May 2027
- In business since
- 1973
Industry codes (NAICS)
- 238220Plumbing, Heating, and Air-Conditioning Contractors
- 237120Oil and Gas Pipeline and Related Structures Construction
- 332410Power Boiler and Heat Exchanger Manufacturing
Leadership
Shasho Pole
President
Jody S Brenner
Cfo
Contracts
26 contracts with New York State agencies, active first. Open a row for the full record.
| Details | Contract | Type | Contract no. | Term | |||||
|---|---|---|---|---|---|---|---|---|---|
Welding services C004229Service: Building servicesActive | SUNY at Stony Brook | Service: Building servicesService | C004229 | Dec 1, 2024to Nov 30, 2029 | Dec 1, 2024 | Nov 30, 2029 | $37,182,600$9,921,937 spent | $9,921,937 | |
Provide temporary hot water and steam boiler rentals C002985Service: Building servicesActive | SUNY at Stony Brook | Service: Building servicesService | C002985 | Dec 1, 2021to May 31, 2027 | Dec 1, 2021 | May 31, 2027 | $6,822,625$1,918,696 spent | $1,918,696 | |
Boiler maintenance and repair services C002867Service: Building servicesActive | SUNY at Stony Brook | Service: Building servicesService | C002867 | Oct 1, 2021to Mar 31, 2027 | Oct 1, 2021 | Mar 31, 2027 | $18,430,000$2,846,738 spent | $2,846,738 | |
Chiller and generator rental at Chavez Hall C003231Commodity: Miscellaneous | SUNY at Stony Brook | Commodity: MiscellaneousCommodity | C003231 | May 18, 2022to Dec 19, 2022 | May 18, 2022 | Dec 19, 2022 | $660,700$524,889 spent | $524,889 | |
Renovation of Marine Engineering Lab at SUNY Maritime at Fort Schuyler D006601Construction: Building | State University Construction Fund | Construction: BuildingConstruction | D006601 | Jan 29, 2021to Dec 31, 2024 | Jan 29, 2021 | Dec 31, 2024 | $4,759,300$4,759,300 spent | $4,759,300 | |
Replace Air Handling Units HVAC Building 80 Sagamore CPC D45889HConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D45889H | Mar 20, 2020to Apr 9, 2023 | Mar 20, 2020 | Apr 9, 2023 | $1,571,126$1,566,540 spent | $1,566,540 | |
Welding and pipe drying services C002233Service: Building services | SUNY at Stony Brook | Service: Building servicesService | C002233 | Dec 1, 2019to Nov 30, 2024 | Dec 1, 2019 | Nov 30, 2024 | $34,587,205$28,597,151 spent | $28,597,151 | |
East campus boiler #1 replacem T002214Contract not subject to state pre-audit | SUNY at Stony Brook | Contract not subject to state pre-auditNot pre-audited | T002214 | Nov 6, 2019to Apr 28, 2023 | Nov 6, 2019 | Apr 28, 2023 | $3,831,792$3,831,792 spent | $3,831,792 | |
SUCF131046 Expand and Upgrade T006489Contract not subject to state pre-audit | State University Construction Fund | Contract not subject to state pre-auditNot pre-audited | T006489 | Apr 25, 2019to Jul 1, 2022 | Apr 25, 2019 | Jul 1, 2022 | $5,485,900$5,485,900 spent | $5,485,900 | |
Replace Central Air Conditioning Unit & Supporting Systems Bldg. 702 Pilgrim PC Suffolk County D45890HConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D45890H | Mar 18, 2019to Nov 9, 2019 | Mar 18, 2019 | Nov 9, 2019 | $506,200$477,000 spent | $477,000 | |
PA Filed Contract-Pilgrim Psychiatric Center Steam Tunnel Rehabilitation and Asbestos Abate D195341Contract not subject to state pre-audit | Dormitory Authority of the State of New York | Contract not subject to state pre-auditNot pre-audited | D195341 | Dec 13, 2016to Sep 29, 2017 | Dec 13, 2016 | Sep 29, 2017 | $1,967,000$0 spent | $0 | |
Provide welding services C001991Service: Building services | SUNY at Stony Brook | Service: Building servicesService | C001991 | Dec 1, 2016to Nov 30, 2019 | Dec 1, 2016 | Nov 30, 2019 | $24,913,860$16,842,741 spent | $16,842,741 | |
Provide temporary hot water and steam boiler rentals C002005Service: Building services | SUNY at Stony Brook | Service: Building servicesService | C002005 | Dec 1, 2016to Nov 30, 2021 | Dec 1, 2016 | Nov 30, 2021 | $8,794,500$2,079,675 spent | $2,079,675 | |
Maintenance/repair service repairs, stonybrook campus C001987Service: Other / misc. services | SUNY at Stony Brook | Service: Other / misc. servicesService | C001987 | Oct 1, 2016to Sep 30, 2021 | Oct 1, 2016 | Sep 30, 2021 | $6,057,675$4,554,030 spent | $4,554,030 | |
Welding Services C001828Service: Other / misc. services | SUNY at Stony Brook | Service: Other / misc. servicesService | C001828 | Jul 1, 2014to Jun 30, 2017 | Jul 1, 2014 | Jun 30, 2017 | $10,099,750$9,357,696 spent | $9,357,696 | |
Temporary boiler rental C001810Service: Building services | SUNY at Stony Brook | Service: Building servicesService | C001810 | Dec 1, 2013to Nov 30, 2016 | Dec 1, 2013 | Nov 30, 2016 | $4,141,500$1,251,564 spent | $1,251,564 | |
East campus chiller plant addi T001802Contract not subject to state pre-audit | SUNY at Stony Brook | Contract not subject to state pre-auditNot pre-audited | T001802 | Oct 28, 2013to Apr 17, 2016 | Oct 28, 2013 | Apr 17, 2016 | $17,985,323$17,187,326 spent | $17,187,326 | |
Change order 4 for contract T0 T006015Contract not subject to state pre-audit | State University Construction Fund | Contract not subject to state pre-auditNot pre-audited | T006015 | May 31, 2013to Feb 15, 2015 | May 31, 2013 | Feb 15, 2015 | $514,430$514,430 spent | $514,430 | |
Provide maintenance/services to power plant equipment/boilers C001654Service: Building services | SUNY at Stony Brook | Service: Building servicesService | C001654 | Oct 1, 2011to Sep 30, 2016 | Oct 1, 2011 | Sep 30, 2016 | $3,338,125$940,413 spent | $940,413 | |
Sucf 13D91 high temperature hot water phase II - area 3, stony brook T005859Contract not subject to state pre-audit | State University Construction Fund | Contract not subject to state pre-auditNot pre-audited | T005859 | Sep 1, 2011to Jun 27, 2012 | Sep 1, 2011 | Jun 27, 2012 | $1,045,492$1,045,492 spent | $1,045,492 |
Welding servicesSUNY at Stony BrookDec 1, 2024 – Nov 30, 2029Active$37,182,600
- Description
- Welding services
- Contract number
- C004229
- Type
- Service: Building servicesService
- Agency
- SUNY at Stony Brook
- Term
- Dec 1, 2024 → Nov 30, 20295 years
- Approved
- Nov 25, 2024
- Status
- Active
- Amount
- $37,182,600
- Spent to date
- $9,921,937 · 27% of the amount
Provide temporary hot water and steam boiler rentalsSUNY at Stony BrookDec 1, 2021 – May 31, 2027Active$6,822,625
- Description
- Provide temporary hot water and steam boiler rentals
- Contract number
- C002985
- Type
- Service: Building servicesService
- Agency
- SUNY at Stony Brook
- Term
- Dec 1, 2021 → May 31, 20275.5 years
- Approved
- Dec 8, 2021
- Status
- Active
- Amount
- $6,822,625
- Spent to date
- $1,918,696 · 28% of the amount
Boiler maintenance and repair servicesSUNY at Stony BrookOct 1, 2021 – Mar 31, 2027Active$18,430,000
- Description
- Boiler maintenance and repair services
- Contract number
- C002867
- Type
- Service: Building servicesService
- Agency
- SUNY at Stony Brook
- Term
- Oct 1, 2021 → Mar 31, 20275.5 years
- Approved
- Sep 15, 2021
- Status
- Active
- Amount
- $18,430,000
- Spent to date
- $2,846,738 · 15% of the amount
Chiller and generator rental at Chavez HallSUNY at Stony BrookMay 18, 2022 – Dec 19, 2022$660,700
- Description
- Chiller and generator rental at Chavez Hall
- Contract number
- C003231
- Type
- Commodity: MiscellaneousCommodity
- Agency
- SUNY at Stony Brook
- Term
- May 18, 2022 → Dec 19, 20227 months
- Approved
- Oct 5, 2022
- Status
- Ended
- Amount
- $660,700
- Spent to date
- $524,889 · 79% of the amount
Renovation of Marine Engineering Lab at SUNY Maritime at Fort SchuylerState University Construction FundJan 29, 2021 – Dec 31, 2024$4,759,300
- Description
- Renovation of Marine Engineering Lab at SUNY Maritime at Fort Schuyler
- Contract number
- D006601
- Type
- Construction: BuildingConstruction
- Term
- Jan 29, 2021 → Dec 31, 20243.9 years
- Approved
- Jan 26, 2021
- Status
- Ended
- Amount
- $4,759,300
- Spent to date
- $4,759,300 · 100% of the amount
Replace Air Handling Units HVAC Building 80 Sagamore CPCOffice of General Services - Design & ConstructionMar 20, 2020 – Apr 9, 2023$1,571,126
- Description
- Replace Air Handling Units HVAC Building 80 Sagamore CPC
- Contract number
- D45889H
- Type
- Construction: BuildingConstruction
- Term
- Mar 20, 2020 → Apr 9, 20233.1 years
- Approved
- Mar 20, 2020
- Status
- Ended
- Amount
- $1,571,126
- Spent to date
- $1,566,540 · 100% of the amount
Welding and pipe drying servicesSUNY at Stony BrookDec 1, 2019 – Nov 30, 2024$34,587,205
- Description
- Welding and pipe drying services
- Contract number
- C002233
- Type
- Service: Building servicesService
- Agency
- SUNY at Stony Brook
- Term
- Dec 1, 2019 → Nov 30, 20245 years
- Approved
- Mar 11, 2020
- Status
- Ended
- Amount
- $34,587,205
- Spent to date
- $28,597,151 · 83% of the amount
East campus boiler #1 replacemSUNY at Stony BrookNov 6, 2019 – Apr 28, 2023$3,831,792
- Description
- East campus boiler #1 replacem
- Contract number
- T002214
- Type
- Contract not subject to state pre-auditNot pre-audited
- Agency
- SUNY at Stony Brook
- Term
- Nov 6, 2019 → Apr 28, 20233.5 years
- Approved
- Nov 7, 2019
- Status
- Ended
- Amount
- $3,831,792
- Spent to date
- $3,831,792 · 100% of the amount
SUCF131046 Expand and UpgradeState University Construction FundApr 25, 2019 – Jul 1, 2022$5,485,900
- Description
- SUCF131046 Expand and Upgrade
- Contract number
- T006489
- Type
- Contract not subject to state pre-auditNot pre-audited
- Term
- Apr 25, 2019 → Jul 1, 20223.2 years
- Approved
- Apr 29, 2019
- Status
- Ended
- Amount
- $5,485,900
- Spent to date
- $5,485,900 · 100% of the amount
Replace Central Air Conditioning Unit & Supporting Systems Bldg. 702 Pilgrim PC Suffolk CountyOffice of General Services - Design & ConstructionMar 18, 2019 – Nov 9, 2019$506,200
- Description
- Replace Central Air Conditioning Unit & Supporting Systems Bldg. 702 Pilgrim PC Suffolk County
- Contract number
- D45890H
- Type
- Construction: BuildingConstruction
- Term
- Mar 18, 2019 → Nov 9, 20198 months
- Approved
- Mar 18, 2019
- Status
- Ended
- Amount
- $506,200
- Spent to date
- $477,000 · 94% of the amount
PA Filed Contract-Pilgrim Psychiatric Center Steam Tunnel Rehabilitation and Asbestos AbateDormitory Authority of the State of New YorkDec 13, 2016 – Sep 29, 2017$1,967,000
- Description
- PA Filed Contract-Pilgrim Psychiatric Center Steam Tunnel Rehabilitation and Asbestos Abate
- Contract number
- D195341
- Type
- Contract not subject to state pre-auditNot pre-audited
- Term
- Dec 13, 2016 → Sep 29, 201710 months
- Approved
- Dec 21, 2016
- Status
- Ended
- Amount
- $1,967,000
- Spent to date
- $0 · 0% of the amount
Provide welding servicesSUNY at Stony BrookDec 1, 2016 – Nov 30, 2019$24,913,860
- Description
- Provide welding services
- Contract number
- C001991
- Type
- Service: Building servicesService
- Agency
- SUNY at Stony Brook
- Term
- Dec 1, 2016 → Nov 30, 20193 years
- Approved
- Jan 24, 2017
- Status
- Ended
- Amount
- $24,913,860
- Spent to date
- $16,842,741 · 68% of the amount
Provide temporary hot water and steam boiler rentalsSUNY at Stony BrookDec 1, 2016 – Nov 30, 2021$8,794,500
- Description
- Provide temporary hot water and steam boiler rentals
- Contract number
- C002005
- Type
- Service: Building servicesService
- Agency
- SUNY at Stony Brook
- Term
- Dec 1, 2016 → Nov 30, 20215 years
- Approved
- Feb 2, 2017
- Status
- Ended
- Amount
- $8,794,500
- Spent to date
- $2,079,675 · 24% of the amount
Maintenance/repair service repairs, stonybrook campusSUNY at Stony BrookOct 1, 2016 – Sep 30, 2021$6,057,675
- Description
- Maintenance/repair service repairs, stonybrook campus
- Contract number
- C001987
- Type
- Service: Other / misc. servicesService
- Agency
- SUNY at Stony Brook
- Term
- Oct 1, 2016 → Sep 30, 20215 years
- Approved
- Dec 8, 2016
- Status
- Ended
- Amount
- $6,057,675
- Spent to date
- $4,554,030 · 75% of the amount
Welding ServicesSUNY at Stony BrookJul 1, 2014 – Jun 30, 2017$10,099,750
- Description
- Welding Services
- Contract number
- C001828
- Type
- Service: Other / misc. servicesService
- Agency
- SUNY at Stony Brook
- Term
- Jul 1, 2014 → Jun 30, 20173 years
- Approved
- Aug 7, 2014
- Status
- Ended
- Amount
- $10,099,750
- Spent to date
- $9,357,696 · 93% of the amount
Temporary boiler rentalSUNY at Stony BrookDec 1, 2013 – Nov 30, 2016$4,141,500
- Description
- Temporary boiler rental
- Contract number
- C001810
- Type
- Service: Building servicesService
- Agency
- SUNY at Stony Brook
- Term
- Dec 1, 2013 → Nov 30, 20163 years
- Approved
- Feb 19, 2014
- Status
- Ended
- Amount
- $4,141,500
- Spent to date
- $1,251,564 · 30% of the amount
East campus chiller plant addiSUNY at Stony BrookOct 28, 2013 – Apr 17, 2016$17,985,323
- Description
- East campus chiller plant addi
- Contract number
- T001802
- Type
- Contract not subject to state pre-auditNot pre-audited
- Agency
- SUNY at Stony Brook
- Term
- Oct 28, 2013 → Apr 17, 20162.5 years
- Approved
- Nov 15, 2013
- Status
- Ended
- Amount
- $17,985,323
- Spent to date
- $17,187,326 · 96% of the amount
Change order 4 for contract T0State University Construction FundMay 31, 2013 – Feb 15, 2015$514,430
- Description
- Change order 4 for contract T0
- Contract number
- T006015
- Type
- Contract not subject to state pre-auditNot pre-audited
- Term
- May 31, 2013 → Feb 15, 20151.8 years
- Approved
- Jun 28, 2013
- Status
- Ended
- Amount
- $514,430
- Spent to date
- $514,430 · 100% of the amount
Provide maintenance/services to power plant equipment/boilersSUNY at Stony BrookOct 1, 2011 – Sep 30, 2016$3,338,125
- Description
- Provide maintenance/services to power plant equipment/boilers
- Contract number
- C001654
- Type
- Service: Building servicesService
- Agency
- SUNY at Stony Brook
- Term
- Oct 1, 2011 → Sep 30, 20165 years
- Approved
- Oct 21, 2011
- Status
- Ended
- Amount
- $3,338,125
- Spent to date
- $940,413 · 28% of the amount
Sucf 13D91 high temperature hot water phase II - area 3, stony brookState University Construction FundSep 1, 2011 – Jun 27, 2012$1,045,492
- Description
- Sucf 13D91 high temperature hot water phase II - area 3, stony brook
- Contract number
- T005859
- Type
- Contract not subject to state pre-auditNot pre-audited
- Term
- Sep 1, 2011 → Jun 27, 201210 months
- Approved
- Sep 2, 2011
- Status
- Ended
- Amount
- $1,045,492
- Spent to date
- $1,045,492 · 100% of the amount
Contract-type mix
Share of contract value by type
- Service14 contracts$176.0M
- Contract not subject to state pre-audit8 contracts$31.3M
- Construction: Building3 contracts$6.8M
- Commodity: Miscellaneous1 contract$660.7K
Contracts over time
Contracts started per year
View as table
| Year | Contracts |
|---|---|
| 2007: 2 contracts, $9.2M | 2 |
| 2008: 0 contracts, $0.0 | 0 |
| 2009: 1 contracts, $197.4K | 1 |
| 2010: 2 contracts, $3.2M | 2 |
| 2011: 3 contracts, $14.0M | 3 |
| 2012: 0 contracts, $0.0 | 0 |
| 2013: 3 contracts, $22.6M | 3 |
| 2014: 1 contracts, $10.1M | 1 |
| 2015: 0 contracts, $0.0 | 0 |
| 2016: 4 contracts, $41.7M | 4 |
| 2017: 0 contracts, $0.0 | 0 |
| 2018: 0 contracts, $0.0 | 0 |
| 2019: 4 contracts, $44.4M | 4 |
| 2020: 1 contracts, $1.6M | 1 |
| 2021: 3 contracts, $30.0M | 3 |
| 2022: 1 contracts, $660.7K | 1 |
| 2023: 0 contracts, $0.0 | 0 |
| 2024: 1 contracts, $37.2M | 1 |
| 2025: 0 contracts, $0.0 | 0 |
| 2026: 0 contracts, $0.0 | 0 |
How the Contractor Score adds up
Extensive (A, 100/100): $215M in contracts, 3 active contracts.
- Contract volume+20.2measured
$215M in current contract value across 26 contracts, more than 98% of scored contractors.
- Recent activity+13.2measured
3 active contracts today; the most recent was approved in November 2024.
- Agency breadth+9.8measured
Contracts with 5 different state agencies and facilities.
- Experience+2.4measured
First contract started in May 2007 (19 years of contract history).
- Contract-type mix+6.8measured
5 contract types; the largest group is services (82% of value). Goods and services contracts are 85% of the total.
- Spending vs. value−0.4measured
On 22 completed contracts with spending recorded, spending is 79% of the contract value. Spending below the full value is common (work can finish under budget) and isn't treated as a problem.
- Federal award history0.0unknown
No federal award history found. Scored as neutral.
- Federal registration+5.2measured
Registered to do business with the federal government (registration active).
50 + contributions = 107.2, capped at 100Starts at 50. Bars: cool adds, warm subtracts.
Agencies served
Contract value with each agency or facility
Similar contractors
- A
Schindler Elevator Corp
Morristown, NJFacilities, Maintenance & Janitorial
Since 200249 agencies
- Contract value
- $191.0M
- Contracts
- 125
- Active
- 14
- A
Otis Elevator Company
Farmington, CTFacilities, Maintenance & Janitorial
Since 200053 agencies
- Contract value
- $153.8M
- Contracts
- 168
- Active
- 22
- A
Johnson Controls Inc
Facilities, Maintenance & Janitorial
Since 200344 agencies
- Contract value
- $318.4M
- Contracts
- 175
- Active
- 19
- A
Kasselman Electric Co Inc
Menands, NYFacilities, Maintenance & Janitorial
Since 200413 agencies
- Contract value
- $373.0M
- Contracts
- 93
- Active
- 17
- A
Slade Industries Inc
Mountainside, NJFacilities, Maintenance & Janitorial
Since 200833 agencies
- Contract value
- $118.2M
- Contracts
- 76
- Active
- 15
- A
Hinck Electrical Contractor Inc
Bohemia, NYFacilities, Maintenance & Janitorial
Since 20074 agencies
- Contract value
- $81.6M
- Contracts
- 28
- Active
- 2
- More facilities, maintenance & janitorial contractors Ranked by contract value
Browse more
- SUNY at Stony Brook contractors
- State University Construction Fund contractors
- Office of General Services - Design & Construction contractors
- Dormitory Authority of the State of New York contractors
- Facilities, Maintenance & Janitorial contractors
- Top contractors
- All contractors
Contract figures are public New York State contract records as of Nov 13, 2026: current contract amounts and spending to date as reported. Company details are shown when we can match this contractor to a registered business with confidence.
RFP Detector is an independent service and is not affiliated with any government agency. Scores are informational.