C&S Technical Resources Inc
ASyracuse, NY State contracts since 2008Updated Nov 13, 2026
C&S Technical Resources Inc holds 18 contracts worth $41.4M with 7 New York State agencies, most with Dormitory Authority of the State of New York; 1 active today. The first started in 2008.
- Total contract value
- $41.4M
- Current contract amounts
- Spent to date
- $10.4M
- 25% of contract value
- Active contracts
- 1
- $30.0M in active value
- Contracts on record
- 18
- Since 2008
- Agencies served
- 7
- Most with Dormitory Authority of the State of New York
- Years active
- 18
- First contract 2008
Contact & company
Business information and how to reach the company.
Phone
Address
- Legal name
- C&S Technical Resources, IncDoing business as C & S Technical Resources
- Identifiers
- UEI EPZANB5G5K75 · CAGE 3E6D8
- Federal registration
- Active · renews by Sep 2027
- In business since
- 1995
Industry codes (NAICS)
- 236220Commercial and Institutional Building Construction
Leadership
Jennifer Smith
General Counsel
Contracts
18 contracts with New York State agencies, active first. Open a row for the full record.
| Details | Contract | Type | Contract no. | Term | |||||
|---|---|---|---|---|---|---|---|---|---|
PA filed contract OMH Hutching PC building 2 rehab D228091Contract not subject to state pre-auditActive | Dormitory Authority of the State of New York | Contract not subject to state pre-auditNot pre-audited | D228091 | Nov 1, 2024to Nov 20, 2026 | Nov 1, 2024 | Nov 20, 2026 | $29,999,000$0 spent | $0 | |
Computer warehouse building third floor office renovations SUNY Upstate Medical University D550335Construction: Building | SUNY - Upstate Medical University | Construction: BuildingConstruction | D550335 | Nov 29, 2022to Aug 31, 2024 | Nov 29, 2022 | Aug 31, 2024 | $384,841$384,841 spent | $384,841 | |
Randall Hall bathroom renovations GC Cortland County D000821Construction: Building | College at Cortland | Construction: BuildingConstruction | D000821 | Feb 28, 2022to Aug 5, 2023 | Feb 28, 2022 | Aug 5, 2023 | $1,130,587$1,130,587 spent | $1,130,587 | |
Construction of storage building at SUNY Plattsburgh D006669Construction: Building | State University Construction Fund | Construction: BuildingConstruction | D006669 | Oct 25, 2021to Oct 25, 2023 | Oct 25, 2021 | Oct 25, 2023 | $788,793$788,793 spent | $788,793 | |
Expansion Four Seasons College Farm SUNY Morrisville Madison County D400460Construction: Miscellaneous | College at Morrisville | Construction: MiscellaneousConstruction | D400460 | Aug 13, 2021to Nov 1, 2023 | Aug 13, 2021 | Nov 1, 2023 | $2,486,354$1,573,751 spent | $1,573,751 | |
Weiskotten Hall automatic door operators SUNY Upstate Onondaga County D550315Construction: Building | SUNY - Upstate Medical University | Construction: BuildingConstruction | D550315 | Aug 13, 2021to May 31, 2022 | Aug 13, 2021 | May 31, 2022 | $339,000$335,983 spent | $335,983 | |
151095/1214 University hospita T550303Contract not subject to state pre-audit | SUNY - Upstate Medical University | Contract not subject to state pre-auditNot pre-audited | T550303 | Mar 1, 2021to Dec 30, 2021 | Mar 1, 2021 | Dec 30, 2021 | $938,739$938,739 spent | $938,739 | |
Replace AC Air Handing Units & Controls Bldgs 3 & 101 Mid State CF Oneida County D45178CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D45178C | Nov 19, 2019to Jun 30, 2022 | Nov 19, 2019 | Jun 30, 2022 | $1,221,212$1,221,212 spent | $1,221,212 | |
Construction agreement proj #1 T550276Contract not subject to state pre-audit | SUNY - Upstate Medical University | Contract not subject to state pre-auditNot pre-audited | T550276 | Sep 19, 2019to Apr 13, 2020 | Sep 19, 2019 | Apr 13, 2020 | $1,321,744$1,321,744 spent | $1,321,744 | |
Replace Steam & Condensate Piping to Bld 163 Willard Drug Treatment Center Willard Seneca County DM3117HConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DM3117H | May 2, 2019to Nov 25, 2019 | May 2, 2019 | Nov 25, 2019 | $355,631$335,463 spent | $335,463 | |
Construction contract proj #11 T550263Contract not subject to state pre-audit | SUNY - Upstate Medical University | Contract not subject to state pre-auditNot pre-audited | T550263 | Feb 1, 2019to May 2, 2019 | Feb 1, 2019 | May 2, 2019 | $137,401$137,401 spent | $137,401 | |
Rehab non-contact visit space, admin bldg 1 Auburn CF, Cayuga County D44933CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D44933C | May 20, 2016to Jun 15, 2019 | May 20, 2016 | Jun 15, 2019 | $910,621$863,298 spent | $863,298 | |
Project 916 incinerator renova T550077Contract not subject to state pre-audit | SUNY - Upstate Medical University | Contract not subject to state pre-auditNot pre-audited | T550077 | Aug 27, 2012to Jun 30, 2013 | Aug 27, 2012 | Jun 30, 2013 | $262,280$262,280 spent | $262,280 | |
Science i labor & material for mechanical ductwork piping exhaust fans and fan coil T300050Contract not subject to state pre-audit | SUNY at Binghamton | Contract not subject to state pre-auditNot pre-audited | T300050 | Sep 3, 2010to Jun 1, 2011 | Sep 3, 2010 | Jun 1, 2011 | $141,756$141,756 spent | $141,756 | |
Repair deteriorating powerhouse stacks mohawk CF DEB021CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEB021C | Jan 26, 2010to Feb 26, 2011 | Jan 26, 2010 | Feb 26, 2011 | $209,864$195,671 spent | $195,671 | |
Project # 809 T502681Contract not subject to state pre-audit | SUNY - Upstate Medical University | Contract not subject to state pre-auditNot pre-audited | T502681 | Jul 1, 2009to Mar 15, 2010 | Jul 1, 2009 | Mar 15, 2010 | $149,680$146,532 spent | $146,532 | |
Replace doors and frames var bldgs cape vincent CF DQ1126CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DQ1126C | Apr 22, 2009to Sep 28, 2011 | Apr 22, 2009 | Sep 28, 2011 | $209,640$199,347 spent | $199,347 | |
Prov. flooring & trench, messhall kettle area, BLDG. 150 mohawk CF D43463CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D43463C | Sep 15, 2008to Jan 26, 2011 | Sep 15, 2008 | Jan 26, 2011 | $397,513$392,719 spent | $392,719 |
PA filed contract OMH Hutching PC building 2 rehabDormitory Authority of the State of New YorkNov 1, 2024 – Nov 20, 2026Active$29,999,000
- Description
- PA filed contract OMH Hutching PC building 2 rehab
- Contract number
- D228091
- Type
- Contract not subject to state pre-auditNot pre-audited
- Term
- Nov 1, 2024 → Nov 20, 20262.1 years
- Approved
- Nov 13, 2024
- Status
- Active
- Amount
- $29,999,000
- Spent to date
- $0 · 0% of the amount
Computer warehouse building third floor office renovations SUNY Upstate Medical UniversitySUNY - Upstate Medical UniversityNov 29, 2022 – Aug 31, 2024$384,841
- Description
- Computer warehouse building third floor office renovations SUNY Upstate Medical University
- Contract number
- D550335
- Type
- Construction: BuildingConstruction
- Term
- Nov 29, 2022 → Aug 31, 20241.8 years
- Approved
- Nov 22, 2022
- Status
- Ended
- Amount
- $384,841
- Spent to date
- $384,841 · 100% of the amount
Randall Hall bathroom renovations GC Cortland CountyCollege at CortlandFeb 28, 2022 – Aug 5, 2023$1,130,587
- Description
- Randall Hall bathroom renovations GC Cortland County
- Contract number
- D000821
- Type
- Construction: BuildingConstruction
- Agency
- College at Cortland
- Term
- Feb 28, 2022 → Aug 5, 202317 months
- Approved
- Feb 18, 2022
- Status
- Ended
- Amount
- $1,130,587
- Spent to date
- $1,130,587 · 100% of the amount
Construction of storage building at SUNY PlattsburghState University Construction FundOct 25, 2021 – Oct 25, 2023$788,793
- Description
- Construction of storage building at SUNY Plattsburgh
- Contract number
- D006669
- Type
- Construction: BuildingConstruction
- Term
- Oct 25, 2021 → Oct 25, 20232 years
- Approved
- Oct 15, 2021
- Status
- Ended
- Amount
- $788,793
- Spent to date
- $788,793 · 100% of the amount
Expansion Four Seasons College Farm SUNY Morrisville Madison CountyCollege at MorrisvilleAug 13, 2021 – Nov 1, 2023$2,486,354
- Description
- Expansion Four Seasons College Farm SUNY Morrisville Madison County
- Contract number
- D400460
- Type
- Construction: MiscellaneousConstruction
- Agency
- College at Morrisville
- Term
- Aug 13, 2021 → Nov 1, 20232.3 years
- Approved
- Aug 13, 2021
- Status
- Ended
- Amount
- $2,486,354
- Spent to date
- $1,573,751 · 63% of the amount
Weiskotten Hall automatic door operators SUNY Upstate Onondaga CountySUNY - Upstate Medical UniversityAug 13, 2021 – May 31, 2022$339,000
- Description
- Weiskotten Hall automatic door operators SUNY Upstate Onondaga County
- Contract number
- D550315
- Type
- Construction: BuildingConstruction
- Term
- Aug 13, 2021 → May 31, 202210 months
- Approved
- Aug 13, 2021
- Status
- Ended
- Amount
- $339,000
- Spent to date
- $335,983 · 99% of the amount
151095/1214 University hospitaSUNY - Upstate Medical UniversityMar 1, 2021 – Dec 30, 2021$938,739
- Description
- 151095/1214 University hospita
- Contract number
- T550303
- Type
- Contract not subject to state pre-auditNot pre-audited
- Term
- Mar 1, 2021 → Dec 30, 202110 months
- Approved
- Mar 2, 2021
- Status
- Ended
- Amount
- $938,739
- Spent to date
- $938,739 · 100% of the amount
Replace AC Air Handing Units & Controls Bldgs 3 & 101 Mid State CF Oneida CountyOffice of General Services - Design & ConstructionNov 19, 2019 – Jun 30, 2022$1,221,212
- Description
- Replace AC Air Handing Units & Controls Bldgs 3 & 101 Mid State CF Oneida County
- Contract number
- D45178C
- Type
- Construction: BuildingConstruction
- Term
- Nov 19, 2019 → Jun 30, 20222.6 years
- Approved
- Nov 19, 2019
- Status
- Ended
- Amount
- $1,221,212
- Spent to date
- $1,221,212 · 100% of the amount
Construction agreement proj #1SUNY - Upstate Medical UniversitySep 19, 2019 – Apr 13, 2020$1,321,744
- Description
- Construction agreement proj #1
- Contract number
- T550276
- Type
- Contract not subject to state pre-auditNot pre-audited
- Term
- Sep 19, 2019 → Apr 13, 20207 months
- Approved
- Sep 20, 2019
- Status
- Ended
- Amount
- $1,321,744
- Spent to date
- $1,321,744 · 100% of the amount
Replace Steam & Condensate Piping to Bld 163 Willard Drug Treatment Center Willard Seneca CountyOffice of General Services - Design & ConstructionMay 2, 2019 – Nov 25, 2019$355,631
- Description
- Replace Steam & Condensate Piping to Bld 163 Willard Drug Treatment Center Willard Seneca County
- Contract number
- DM3117H
- Type
- Construction: BuildingConstruction
- Term
- May 2, 2019 → Nov 25, 20197 months
- Approved
- May 2, 2019
- Status
- Ended
- Amount
- $355,631
- Spent to date
- $335,463 · 94% of the amount
Construction contract proj #11SUNY - Upstate Medical UniversityFeb 1, 2019 – May 2, 2019$137,401
- Description
- Construction contract proj #11
- Contract number
- T550263
- Type
- Contract not subject to state pre-auditNot pre-audited
- Term
- Feb 1, 2019 → May 2, 20193 months
- Approved
- Feb 5, 2019
- Status
- Ended
- Amount
- $137,401
- Spent to date
- $137,401 · 100% of the amount
Rehab non-contact visit space, admin bldg 1 Auburn CF, Cayuga CountyOffice of General Services - Design & ConstructionMay 20, 2016 – Jun 15, 2019$910,621
- Description
- Rehab non-contact visit space, admin bldg 1 Auburn CF, Cayuga County
- Contract number
- D44933C
- Type
- Construction: BuildingConstruction
- Term
- May 20, 2016 → Jun 15, 20193.1 years
- Approved
- May 20, 2016
- Status
- Ended
- Amount
- $910,621
- Spent to date
- $863,298 · 95% of the amount
Project 916 incinerator renovaSUNY - Upstate Medical UniversityAug 27, 2012 – Jun 30, 2013$262,280
- Description
- Project 916 incinerator renova
- Contract number
- T550077
- Type
- Contract not subject to state pre-auditNot pre-audited
- Term
- Aug 27, 2012 → Jun 30, 201310 months
- Approved
- Oct 31, 2012
- Status
- Ended
- Amount
- $262,280
- Spent to date
- $262,280 · 100% of the amount
Science i labor & material for mechanical ductwork piping exhaust fans and fan coilSUNY at BinghamtonSep 3, 2010 – Jun 1, 2011$141,756
- Description
- Science i labor & material for mechanical ductwork piping exhaust fans and fan coil
- Contract number
- T300050
- Type
- Contract not subject to state pre-auditNot pre-audited
- Agency
- SUNY at Binghamton
- Term
- Sep 3, 2010 → Jun 1, 20119 months
- Approved
- Oct 12, 2011
- Status
- Ended
- Amount
- $141,756
- Spent to date
- $141,756 · 100% of the amount
Repair deteriorating powerhouse stacks mohawk CFOffice of General Services - Design & ConstructionJan 26, 2010 – Feb 26, 2011$209,864
- Description
- Repair deteriorating powerhouse stacks mohawk CF
- Contract number
- DEB021C
- Type
- Construction: BuildingConstruction
- Term
- Jan 26, 2010 → Feb 26, 201113 months
- Approved
- Aug 16, 2010
- Status
- Ended
- Amount
- $209,864
- Spent to date
- $195,671 · 93% of the amount
Project # 809SUNY - Upstate Medical UniversityJul 1, 2009 – Mar 15, 2010$149,680
- Description
- Project # 809
- Contract number
- T502681
- Type
- Contract not subject to state pre-auditNot pre-audited
- Term
- Jul 1, 2009 → Mar 15, 20108 months
- Approved
- Mar 18, 2010
- Status
- Ended
- Amount
- $149,680
- Spent to date
- $146,532 · 98% of the amount
Replace doors and frames var bldgs cape vincent CFOffice of General Services - Design & ConstructionApr 22, 2009 – Sep 28, 2011$209,640
- Description
- Replace doors and frames var bldgs cape vincent CF
- Contract number
- DQ1126C
- Type
- Construction: BuildingConstruction
- Term
- Apr 22, 2009 → Sep 28, 20112.4 years
- Approved
- Mar 11, 2011
- Status
- Ended
- Amount
- $209,640
- Spent to date
- $199,347 · 95% of the amount
Prov. flooring & trench, messhall kettle area, BLDG. 150 mohawk CFOffice of General Services - Design & ConstructionSep 15, 2008 – Jan 26, 2011$397,513
- Description
- Prov. flooring & trench, messhall kettle area, BLDG. 150 mohawk CF
- Contract number
- D43463C
- Type
- Construction: BuildingConstruction
- Term
- Sep 15, 2008 → Jan 26, 20112.3 years
- Approved
- Aug 5, 2010
- Status
- Ended
- Amount
- $397,513
- Spent to date
- $392,719 · 99% of the amount
Contract-type mix
Share of contract value by type
- Contract not subject to state pre-audit7 contracts$33.0M
- Construction11 contracts$8.4M
Contracts over time
Contracts started per year
View as table
| Year | Contracts |
|---|---|
| 2008: 1 contracts, $397.5K | 1 |
| 2009: 2 contracts, $359.3K | 2 |
| 2010: 2 contracts, $351.6K | 2 |
| 2011: 0 contracts, $0.0 | 0 |
| 2012: 1 contracts, $262.3K | 1 |
| 2013: 0 contracts, $0.0 | 0 |
| 2014: 0 contracts, $0.0 | 0 |
| 2015: 0 contracts, $0.0 | 0 |
| 2016: 1 contracts, $910.6K | 1 |
| 2017: 0 contracts, $0.0 | 0 |
| 2018: 0 contracts, $0.0 | 0 |
| 2019: 4 contracts, $3.0M | 4 |
| 2020: 0 contracts, $0.0 | 0 |
| 2021: 4 contracts, $4.6M | 4 |
| 2022: 2 contracts, $1.5M | 2 |
| 2023: 0 contracts, $0.0 | 0 |
| 2024: 1 contracts, $30.0M | 1 |
| 2025: 0 contracts, $0.0 | 0 |
| 2026: 0 contracts, $0.0 | 0 |
How the Contractor Score adds up
Extensive (A, 95/100): $41M in contracts, works with 7 agencies.
- Contract volume+14.8measured
$41M in current contract value across 18 contracts, more than 94% of scored contractors.
- Recent activity+9.9measured
1 active contract today; the most recent was approved in November 2024.
- Agency breadth+10.9measured
Contracts with 7 different state agencies and facilities.
- Experience+2.0measured
First contract started in September 2008 (18 years of contract history).
- Contract-type mix+2.2measured
3 contract types; the largest group is contracts exempt from state pre-audit (80% of value). Goods and services contracts are 20% of the total.
- Spending vs. value0.0measured
On 17 completed contracts with spending recorded, spending is 91% of the contract value. Spending below the full value is common (work can finish under budget) and isn't treated as a problem.
- Federal award history0.0unknown
No federal award history found. Scored as neutral.
- Federal registration+5.2measured
Registered to do business with the federal government (registration active).
50 + contributions = 95 (A, Extensive)Starts at 50. Bars: cool adds, warm subtracts.
Agencies served
Contract value with each agency or facility
- Dormitory Authority of the State of New York1 contract$30.0M
- SUNY - Upstate Medical University7 contracts$3.5M
- Office of General Services - Design & Construction6 contracts$3.3M
- College at Morrisville1 contract$2.5M
- College at Cortland1 contract$1.1M
- State University Construction Fund1 contract$788.8K
- SUNY at Binghamton1 contract$141.8K
Similar contractors
- A
J & K Plumbing and Heating Co Inc
Construction & Renovation
Since 200810 agencies
- Contract value
- $93.8M
- Contracts
- 77
- Active
- 4
- A
Fahs Construction Group Inc
Binghamton, NYConstruction & Renovation
Since 200713 agencies
- Contract value
- $994.3M
- Contracts
- 100
- Active
- 12
- A
Postler & Jaeckle Corp
Rochester, NYConstruction & Renovation
Since 200819 agencies
- Contract value
- $56.7M
- Contracts
- 101
- Active
- 12
- A
Wilkins Mechanical Inc
Construction & Renovation
Since 200810 agencies
- Contract value
- $67.9M
- Contracts
- 125
- Active
- 0
- A
Matco Electric Corporation
Vestal, NYConstruction & Renovation
Since 200942 agencies
- Contract value
- $85.8M
- Contracts
- 118
- Active
- 16
- A
Oconnell Electric Company Inc
Victor, NYConstruction & Renovation
Since 200052 agencies
- Contract value
- $251.8M
- Contracts
- 220
- Active
- 13
- More construction & renovation contractors Ranked by contract value
Browse more
- Dormitory Authority of the State of New York contractors
- SUNY - Upstate Medical University contractors
- Office of General Services - Design & Construction contractors
- College at Morrisville contractors
- Construction & Renovation contractors
- Top contractors
- All contractors
Contract figures are public New York State contract records as of Nov 13, 2026: current contract amounts and spending to date as reported. Company details are shown when we can match this contractor to a registered business with confidence.
RFP Detector is an independent service and is not affiliated with any government agency. Scores are informational.