Condor Fire Sprinkler LLC
AState contracts since 2008Updated Nov 13, 2026
Condor Fire Sprinkler LLC holds 19 contracts worth $10.4M with 6 New York State agencies, most with Office of General Services - Design & Construction; 2 active today. The first started in 2008.
- Total contract value
- $10.4M
- Current contract amounts
- Spent to date
- $8.7M
- 83% of contract value
- Active contracts
- 2
- $695.2K in active value
- Contracts on record
- 19
- Since 2008
- Agencies served
- 6
- Most with Office of General Services - Design & Construction
- Years active
- 18
- First contract 2008
Contact & company
Business information and how to reach the company.
Contracts
19 contracts with New York State agencies, active first. Open a row for the full record.
| Details | Contract | Type | Contract no. | Term | |||||
|---|---|---|---|---|---|---|---|---|---|
Back of house rehabilitation fire protection work at SPAC Amphitheater in Saratoga County D006562Construction: BuildingActive | Office of Parks Recreation & Historic Preservation | Construction: BuildingConstruction | D006562 | Sep 4, 2026to Mar 4, 2028 | Sep 4, 2026 | Mar 4, 2028 | $346,455$0 spent | $0 | |
Remove fire suppression systems at various ITS facilities in Albany County DQ1882NConstruction: BuildingActive | Office of General Services - Design & Construction | Construction: BuildingConstruction | DQ1882N | Feb 18, 2026to Jun 9, 2027 | Feb 18, 2026 | Jun 9, 2027 | $348,706$9,405 spent | $9,405 | |
Provide security ceilings bldgs 4 6 7 & 8 Elmira PC Chemung County D45951NConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D45951N | Mar 8, 2022to Mar 6, 2026 | Mar 8, 2022 | Mar 6, 2026 | $347,792$336,490 spent | $336,490 | |
Provide fire sprinkler Bldg 9 & power plant Bldg 1 Elmira PC Chemung County DQ1781NConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DQ1781N | Sep 3, 2021to Jun 28, 2023 | Sep 3, 2021 | Jun 28, 2023 | $622,454$615,949 spent | $615,949 | |
Fire sprinkler system rehab at the horse arena SUNY Morrisville D400466Construction: Miscellaneous | College at Morrisville | Construction: MiscellaneousConstruction | D400466 | Jun 17, 2021to May 15, 2022 | Jun 17, 2021 | May 15, 2022 | $394,562$394,562 spent | $394,562 | |
Replace building insulation in truck garage Oneonta Otsego County D45933PConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D45933P | Jun 2, 2021to Mar 14, 2022 | Jun 2, 2021 | Mar 14, 2022 | $159,900$156,155 spent | $156,155 | |
Provide Water Storage & Fire Suppression Upgrades Dutchess County D45147CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D45147C | Feb 21, 2020to Aug 28, 2021 | Feb 21, 2020 | Aug 28, 2021 | $1,554,213$1,547,742 spent | $1,547,742 | |
Replace Windows Boilers & HVAC Renovations Units 1 Through 4 & Medical Wing Brookwood SC Columbia Co D45259PConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D45259P | May 8, 2019to Nov 13, 2020 | May 8, 2019 | Nov 13, 2020 | $171,700$167,763 spent | $167,763 | |
Repair Fire Standpipe & Damaged Fiinshes Bld 5 Auburn CF Cayuga County DED712NConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DED712N | Jan 12, 2018to May 12, 2018 | Jan 12, 2018 | May 12, 2018 | $300,000$5,036 spent | $5,036 | |
SUCF 36137 Replace Fire Pumps T006212Contract not subject to state pre-audit | State University Construction Fund | Contract not subject to state pre-auditNot pre-audited | T006212 | Feb 15, 2016to Jul 4, 2017 | Feb 15, 2016 | Jul 4, 2017 | $183,300$183,300 spent | $183,300 | |
PA Filed Contract- Albany Capital Center - Fire Protection Systems Complete DBP10FPContract not subject to state pre-audit | Albany Convention Center Authority | Contract not subject to state pre-auditNot pre-audited | DBP10FP | Dec 14, 2015to Jan 30, 2017 | Dec 14, 2015 | Jan 30, 2017 | $686,800$0 spent | $0 | |
Worker Compensation Tenant Renovations, Plumbing, Worker Compensation Office, Schecnectady County D45015PConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D45015P | Mar 5, 2015to Dec 23, 2015 | Mar 5, 2015 | Dec 23, 2015 | $102,285$92,285 spent | $92,285 | |
Improve Fire Protection System @ MacCormick Secure Center - Tompkins Co. (N-fire protection work) D44535NConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D44535N | Mar 14, 2014to Oct 23, 2015 | Mar 14, 2014 | Oct 23, 2015 | $505,800$505,532 spent | $505,532 | |
Replace Fire Pumps & Repair House Tanks @ Empire State Plaza D43003PConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D43003P | Mar 25, 2013to Sep 12, 2021 | Mar 25, 2013 | Sep 12, 2021 | $3,345,629$3,345,102 spent | $3,345,102 | |
Provide fire sprinkler system hostel 5951 central NY ddso D44141PConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D44141P | Mar 10, 2011to Jun 6, 2012 | Mar 10, 2011 | Jun 6, 2012 | $135,100$123,576 spent | $123,576 | |
Provide food laboratory & weights and measures laboratory - sob campus, albany, BLDG 6 D43100NConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D43100N | Oct 28, 2010to Nov 21, 2013 | Oct 28, 2010 | Nov 21, 2013 | $301,839$292,051 spent | $292,051 | |
Modify piping and replace fire pumps NYS capitol D43342NConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D43342N | Dec 15, 2009to Dec 7, 2012 | Dec 15, 2009 | Dec 7, 2012 | $642,451$638,234 spent | $638,234 | |
Server room and office renovation state education building D43489NConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D43489N | Nov 7, 2008to Aug 26, 2011 | Nov 7, 2008 | Aug 26, 2011 | $213,800$213,596 spent | $213,596 | |
Lake george bathhouse exposed dry automatic sprink ler system T009939Contract not subject to state pre-audit | Department of Environmental Conservation | Contract not subject to state pre-auditNot pre-audited | T009939 | Mar 5, 2008to Jul 1, 2012 | Mar 5, 2008 | Jul 1, 2012 | $45,769$45,769 spent | $45,769 |
Back of house rehabilitation fire protection work at SPAC Amphitheater in Saratoga CountyOffice of Parks Recreation & Historic PreservationSep 4, 2026 – Mar 4, 2028Active$346,455
- Description
- Back of house rehabilitation fire protection work at SPAC Amphitheater in Saratoga County
- Contract number
- D006562
- Type
- Construction: BuildingConstruction
- Term
- Sep 4, 2026 → Mar 4, 20281.5 years
- Approved
- Sep 4, 2026
- Status
- Active
- Amount
- $346,455
- Spent to date
- $0 · 0% of the amount
Remove fire suppression systems at various ITS facilities in Albany CountyOffice of General Services - Design & ConstructionFeb 18, 2026 – Jun 9, 2027Active$348,706
- Description
- Remove fire suppression systems at various ITS facilities in Albany County
- Contract number
- DQ1882N
- Type
- Construction: BuildingConstruction
- Term
- Feb 18, 2026 → Jun 9, 202716 months
- Approved
- Feb 18, 2026
- Status
- Active
- Amount
- $348,706
- Spent to date
- $9,405 · 3% of the amount
Provide security ceilings bldgs 4 6 7 & 8 Elmira PC Chemung CountyOffice of General Services - Design & ConstructionMar 8, 2022 – Mar 6, 2026$347,792
- Description
- Provide security ceilings bldgs 4 6 7 & 8 Elmira PC Chemung County
- Contract number
- D45951N
- Type
- Construction: BuildingConstruction
- Term
- Mar 8, 2022 → Mar 6, 20264 years
- Approved
- Mar 8, 2022
- Status
- Ended
- Amount
- $347,792
- Spent to date
- $336,490 · 97% of the amount
Provide fire sprinkler Bldg 9 & power plant Bldg 1 Elmira PC Chemung CountyOffice of General Services - Design & ConstructionSep 3, 2021 – Jun 28, 2023$622,454
- Description
- Provide fire sprinkler Bldg 9 & power plant Bldg 1 Elmira PC Chemung County
- Contract number
- DQ1781N
- Type
- Construction: BuildingConstruction
- Term
- Sep 3, 2021 → Jun 28, 20231.8 years
- Approved
- Sep 3, 2021
- Status
- Ended
- Amount
- $622,454
- Spent to date
- $615,949 · 99% of the amount
Fire sprinkler system rehab at the horse arena SUNY MorrisvilleCollege at MorrisvilleJun 17, 2021 – May 15, 2022$394,562
- Description
- Fire sprinkler system rehab at the horse arena SUNY Morrisville
- Contract number
- D400466
- Type
- Construction: MiscellaneousConstruction
- Agency
- College at Morrisville
- Term
- Jun 17, 2021 → May 15, 202211 months
- Approved
- Jun 17, 2021
- Status
- Ended
- Amount
- $394,562
- Spent to date
- $394,562 · 100% of the amount
Replace building insulation in truck garage Oneonta Otsego CountyOffice of General Services - Design & ConstructionJun 2, 2021 – Mar 14, 2022$159,900
- Description
- Replace building insulation in truck garage Oneonta Otsego County
- Contract number
- D45933P
- Type
- Construction: BuildingConstruction
- Term
- Jun 2, 2021 → Mar 14, 20229 months
- Approved
- Jun 2, 2021
- Status
- Ended
- Amount
- $159,900
- Spent to date
- $156,155 · 98% of the amount
Provide Water Storage & Fire Suppression Upgrades Dutchess CountyOffice of General Services - Design & ConstructionFeb 21, 2020 – Aug 28, 2021$1,554,213
- Description
- Provide Water Storage & Fire Suppression Upgrades Dutchess County
- Contract number
- D45147C
- Type
- Construction: BuildingConstruction
- Term
- Feb 21, 2020 → Aug 28, 20211.5 years
- Approved
- Feb 21, 2020
- Status
- Ended
- Amount
- $1,554,213
- Spent to date
- $1,547,742 · 100% of the amount
Replace Windows Boilers & HVAC Renovations Units 1 Through 4 & Medical Wing Brookwood SC Columbia CoOffice of General Services - Design & ConstructionMay 8, 2019 – Nov 13, 2020$171,700
- Description
- Replace Windows Boilers & HVAC Renovations Units 1 Through 4 & Medical Wing Brookwood SC Columbia Co
- Contract number
- D45259P
- Type
- Construction: BuildingConstruction
- Term
- May 8, 2019 → Nov 13, 20201.5 years
- Approved
- May 8, 2019
- Status
- Ended
- Amount
- $171,700
- Spent to date
- $167,763 · 98% of the amount
Repair Fire Standpipe & Damaged Fiinshes Bld 5 Auburn CF Cayuga CountyOffice of General Services - Design & ConstructionJan 12, 2018 – May 12, 2018$300,000
- Description
- Repair Fire Standpipe & Damaged Fiinshes Bld 5 Auburn CF Cayuga County
- Contract number
- DED712N
- Type
- Construction: BuildingConstruction
- Term
- Jan 12, 2018 → May 12, 20184 months
- Approved
- Mar 2, 2018
- Status
- Ended
- Amount
- $300,000
- Spent to date
- $5,036 · 2% of the amount
SUCF 36137 Replace Fire PumpsState University Construction FundFeb 15, 2016 – Jul 4, 2017$183,300
- Description
- SUCF 36137 Replace Fire Pumps
- Contract number
- T006212
- Type
- Contract not subject to state pre-auditNot pre-audited
- Term
- Feb 15, 2016 → Jul 4, 201717 months
- Approved
- Feb 17, 2016
- Status
- Ended
- Amount
- $183,300
- Spent to date
- $183,300 · 100% of the amount
PA Filed Contract- Albany Capital Center - Fire Protection Systems CompleteAlbany Convention Center AuthorityDec 14, 2015 – Jan 30, 2017$686,800
- Description
- PA Filed Contract- Albany Capital Center - Fire Protection Systems Complete
- Contract number
- DBP10FP
- Type
- Contract not subject to state pre-auditNot pre-audited
- Term
- Dec 14, 2015 → Jan 30, 201714 months
- Approved
- Dec 28, 2015
- Status
- Ended
- Amount
- $686,800
- Spent to date
- $0 · 0% of the amount
Worker Compensation Tenant Renovations, Plumbing, Worker Compensation Office, Schecnectady CountyOffice of General Services - Design & ConstructionMar 5, 2015 – Dec 23, 2015$102,285
- Description
- Worker Compensation Tenant Renovations, Plumbing, Worker Compensation Office, Schecnectady County
- Contract number
- D45015P
- Type
- Construction: BuildingConstruction
- Term
- Mar 5, 2015 → Dec 23, 201510 months
- Approved
- Mar 5, 2015
- Status
- Ended
- Amount
- $102,285
- Spent to date
- $92,285 · 90% of the amount
Improve Fire Protection System @ MacCormick Secure Center - Tompkins Co. (N-fire protection work)Office of General Services - Design & ConstructionMar 14, 2014 – Oct 23, 2015$505,800
- Description
- Improve Fire Protection System @ MacCormick Secure Center - Tompkins Co. (N-fire protection work)
- Contract number
- D44535N
- Type
- Construction: BuildingConstruction
- Term
- Mar 14, 2014 → Oct 23, 20151.6 years
- Approved
- Mar 14, 2014
- Status
- Ended
- Amount
- $505,800
- Spent to date
- $505,532 · 100% of the amount
Replace Fire Pumps & Repair House Tanks @ Empire State PlazaOffice of General Services - Design & ConstructionMar 25, 2013 – Sep 12, 2021$3,345,629
- Description
- Replace Fire Pumps & Repair House Tanks @ Empire State Plaza
- Contract number
- D43003P
- Type
- Construction: BuildingConstruction
- Term
- Mar 25, 2013 → Sep 12, 20218.5 years
- Approved
- Mar 25, 2013
- Status
- Ended
- Amount
- $3,345,629
- Spent to date
- $3,345,102 · 100% of the amount
Provide fire sprinkler system hostel 5951 central NY ddsoOffice of General Services - Design & ConstructionMar 10, 2011 – Jun 6, 2012$135,100
- Description
- Provide fire sprinkler system hostel 5951 central NY ddso
- Contract number
- D44141P
- Type
- Construction: BuildingConstruction
- Term
- Mar 10, 2011 → Jun 6, 201215 months
- Approved
- Dec 16, 2011
- Status
- Ended
- Amount
- $135,100
- Spent to date
- $123,576 · 91% of the amount
Provide food laboratory & weights and measures laboratory - sob campus, albany, BLDG 6Office of General Services - Design & ConstructionOct 28, 2010 – Nov 21, 2013$301,839
- Description
- Provide food laboratory & weights and measures laboratory - sob campus, albany, BLDG 6
- Contract number
- D43100N
- Type
- Construction: BuildingConstruction
- Term
- Oct 28, 2010 → Nov 21, 20133.1 years
- Approved
- Oct 28, 2010
- Status
- Ended
- Amount
- $301,839
- Spent to date
- $292,051 · 97% of the amount
Modify piping and replace fire pumps NYS capitolOffice of General Services - Design & ConstructionDec 15, 2009 – Dec 7, 2012$642,451
- Description
- Modify piping and replace fire pumps NYS capitol
- Contract number
- D43342N
- Type
- Construction: BuildingConstruction
- Term
- Dec 15, 2009 → Dec 7, 20123 years
- Approved
- Dec 15, 2009
- Status
- Ended
- Amount
- $642,451
- Spent to date
- $638,234 · 99% of the amount
Server room and office renovation state education buildingOffice of General Services - Design & ConstructionNov 7, 2008 – Aug 26, 2011$213,800
- Description
- Server room and office renovation state education building
- Contract number
- D43489N
- Type
- Construction: BuildingConstruction
- Term
- Nov 7, 2008 → Aug 26, 20112.8 years
- Approved
- Nov 7, 2008
- Status
- Ended
- Amount
- $213,800
- Spent to date
- $213,596 · 100% of the amount
Lake george bathhouse exposed dry automatic sprink ler systemDepartment of Environmental ConservationMar 5, 2008 – Jul 1, 2012$45,769
- Description
- Lake george bathhouse exposed dry automatic sprink ler system
- Contract number
- T009939
- Type
- Contract not subject to state pre-auditNot pre-audited
- Term
- Mar 5, 2008 → Jul 1, 20124.3 years
- Approved
- May 8, 2008
- Status
- Ended
- Amount
- $45,769
- Spent to date
- $45,769 · 100% of the amount
Contract-type mix
Share of contract value by type
- Construction16 contracts$9.5M
- Contract not subject to state pre-audit3 contracts$915.9K
Contracts over time
Contracts started per year
View as table
| Year | Contracts |
|---|---|
| 2008: 2 contracts, $259.6K | 2 |
| 2009: 1 contracts, $642.5K | 1 |
| 2010: 1 contracts, $301.8K | 1 |
| 2011: 1 contracts, $135.1K | 1 |
| 2012: 0 contracts, $0.0 | 0 |
| 2013: 1 contracts, $3.3M | 1 |
| 2014: 1 contracts, $505.8K | 1 |
| 2015: 2 contracts, $789.1K | 2 |
| 2016: 1 contracts, $183.3K | 1 |
| 2017: 0 contracts, $0.0 | 0 |
| 2018: 1 contracts, $300.0K | 1 |
| 2019: 1 contracts, $171.7K | 1 |
| 2020: 1 contracts, $1.6M | 1 |
| 2021: 3 contracts, $1.2M | 3 |
| 2022: 1 contracts, $347.8K | 1 |
| 2023: 0 contracts, $0.0 | 0 |
| 2024: 0 contracts, $0.0 | 0 |
| 2025: 0 contracts, $0.0 | 0 |
| 2026: 2 contracts, $695.2K | 2 |
How the Contractor Score adds up
Extensive (A, 94/100): 2 active contracts, $10M in contracts.
- Contract volume+10.4measured
$10M in current contract value across 19 contracts, more than 86% of scored contractors.
- Recent activity+14.7measured
2 active contracts today; the most recent was approved in September 2026.
- Agency breadth+10.3measured
Contracts with 6 different state agencies and facilities.
- Experience+2.1measured
First contract started in March 2008 (18 years of contract history).
- Contract-type mix+5.9measured
3 contract types; the largest group is construction (91% of value). Goods and services contracts are 91% of the total.
- Spending vs. value+0.1measured
On 16 completed contracts with spending recorded, spending is 96% of the contract value. Spending below the full value is common (work can finish under budget) and isn't treated as a problem.
- Federal award history0.0unknown
No federal award history found. Scored as neutral.
- Federal registration0.0unknown
No federal contractor registration found. Scored as neutral.
50 + contributions = 94 (A, Extensive)Starts at 50. Bars: cool adds, warm subtracts.
Agencies served
Contract value with each agency or facility
- Office of General Services - Design & Construction14 contracts$8.8M
- Albany Convention Center Authority1 contract$686.8K
- College at Morrisville1 contract$394.6K
- Office of Parks Recreation & Historic Preservation1 contract$346.5K
- State University Construction Fund1 contract$183.3K
- Department of Environmental Conservation1 contract$45.8K
Similar contractors
- A
Upstate Companies I LLC
Mount Upton, NYConstruction & Renovation
Since 201610 agencies
- Contract value
- $156.7M
- Contracts
- 104
- Active
- 22
- A
Oconnell Electric Company Inc
Victor, NYConstruction & Renovation
Since 200052 agencies
- Contract value
- $251.8M
- Contracts
- 220
- Active
- 13
- A
TJ Fiacco Construction LLC
Construction & Renovation
Since 20116 agencies
- Contract value
- $12.8M
- Contracts
- 15
- Active
- 2
- A
United Paving Corp
East Norwich, NYConstruction & Renovation
Since 20185 agencies
- Contract value
- $13.2M
- Contracts
- 11
- Active
- 0
- B
Richard E Alexander Co Inc
Construction & Renovation
Since 20084 agencies
- Contract value
- $13.5M
- Contracts
- 7
- Active
- 0
- A
RB Robinson Contracting Inc
Construction & Renovation
Since 20146 agencies
- Contract value
- $14.4M
- Contracts
- 14
- Active
- 0
- More construction & renovation contractors Ranked by contract value
Browse more
- Office of General Services - Design & Construction contractors
- Albany Convention Center Authority contractors
- College at Morrisville contractors
- Office of Parks Recreation & Historic Preservation contractors
- Construction & Renovation contractors
- Top contractors
- All contractors
Contract figures are public New York State contract records as of Nov 13, 2026: current contract amounts and spending to date as reported. Company details are shown when we can match this contractor to a registered business with confidence.
RFP Detector is an independent service and is not affiliated with any government agency. Scores are informational.