Dimitri Enterprises Inc
BState contracts since 2006Updated Nov 13, 2026
Dimitri Enterprises Inc holds 31 contracts worth $15.5M with 3 New York State agencies, most with Office of General Services - Design & Construction; none active today. The first started in 2006.
- Total contract value
- $15.5M
- Current contract amounts
- Spent to date
- $14.1M
- 91% of contract value
- Active contracts
- 0
- None active today
- Contracts on record
- 31
- Since 2006
- Agencies served
- 3
- Most with Office of General Services - Design & Construction
- Years active
- 20
- First contract 2006
Contact & company
Business information and how to reach the company.
Contracts
31 contracts with New York State agencies, active first. Open a row for the full record.
| Details | Contract | Type | Contract no. | Term | |||||
|---|---|---|---|---|---|---|---|---|---|
REPLACE ROOFS, BUILDINGS 40 &102, creedmoor psych. center, queens village. D44644CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D44644C | Jul 30, 2014to Dec 23, 2015 | Jul 30, 2014 | Dec 23, 2015 | $1,067,319$938,411 spent | $938,411 | |
Replace damaged roof building 60 creedmoor PC DEC443TConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEC443T | Sep 20, 2013to Jan 24, 2014 | Sep 20, 2013 | Jan 24, 2014 | $300,000$278,008 spent | $278,008 | |
Decommission 1668 webster ave vacated building bronx new york DEC368PConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEC368P | Jun 27, 2013to Apr 30, 2014 | Jun 27, 2013 | Apr 30, 2014 | $200,000$28,283 spent | $28,283 | |
Sucf 21233 replace roof T006018Contract not subject to state pre-audit | State University Construction Fund | Contract not subject to state pre-auditNot pre-audited | T006018 | May 6, 2013to Mar 12, 2017 | May 6, 2013 | Mar 12, 2017 | $1,154,307$1,154,307 spent | $1,154,307 | |
Repair drill hall leaking roof brooklyn armory DEC319TConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEC319T | May 3, 2013to Oct 8, 2013 | May 3, 2013 | Oct 8, 2013 | $150,000$32,490 spent | $32,490 | |
Replace defective roofing system building 1 south beach PC DEB829TConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEB829T | Feb 29, 2012to Aug 27, 2012 | Feb 29, 2012 | Aug 27, 2012 | $168,000$154,000 spent | $154,000 | |
Renovation to downstate depot T511014Contract not subject to state pre-audit | SUNY - Health Science Center at Brooklyn | Contract not subject to state pre-auditNot pre-audited | T511014 | Aug 31, 2011to Aug 30, 2012 | Aug 31, 2011 | Aug 30, 2012 | $64,526$64,526 spent | $64,526 | |
Repair failed ac unit for building 40 staten island ddso DEB555HConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEB555H | Jun 2, 2011to Sep 30, 2011 | Jun 2, 2011 | Sep 30, 2011 | $75,000$26,985 spent | $26,985 | |
Sucf 14a98 reroof basic science building SUNY HSC at brooklyn T005805Contract not subject to state pre-audit | State University Construction Fund | Contract not subject to state pre-auditNot pre-audited | T005805 | Mar 30, 2011to Feb 27, 2013 | Mar 30, 2011 | Feb 27, 2013 | $1,448,740$1,448,740 spent | $1,448,740 | |
Provide independent boiler, bldgs 101,108 & 110 manhattan PC D43750CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D43750C | Dec 22, 2010to Feb 26, 2013 | Dec 22, 2010 | Feb 26, 2013 | $98,808$74,982 spent | $74,982 | |
Stop water infiltration on roof creedmoor PC DEB338TConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEB338T | Oct 28, 2010to Oct 27, 2011 | Oct 28, 2010 | Oct 27, 2011 | $150,000$49,853 spent | $49,853 | |
Patch failed roofs BLDG 102 bronx PC DEB331TConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEB331T | Sep 29, 2010to Jul 6, 2011 | Sep 29, 2010 | Jul 6, 2011 | $100,000$14,323 spent | $14,323 | |
Replace valves & upgrade showers lincoln CF D42621CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D42621C | Sep 28, 2010to Jun 29, 2012 | Sep 28, 2010 | Jun 29, 2012 | $187,822$175,294 spent | $175,294 | |
Provide CCTV/audio monitoring system bayview CF D43340PConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D43340P | Aug 3, 2010to Jul 2, 2012 | Aug 3, 2010 | Jul 2, 2012 | $44,000$42,894 spent | $42,894 | |
Provide low pressure power plant manhattan PC D43368CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D43368C | Jul 9, 2010to Jun 3, 2013 | Jul 9, 2010 | Jun 3, 2013 | $3,674,727$3,671,599 spent | $3,671,599 | |
Repair failed rooftop chiller fulton CF DEB255HConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEB255H | Jul 6, 2010to Nov 3, 2010 | Jul 6, 2010 | Nov 3, 2010 | $100,000$10,134 spent | $10,134 | |
Sucf 29364 repl roofs SRV group BLDG 38,39 & 39a SUNY at purchase T005680Contract not subject to state pre-audit | State University Construction Fund | Contract not subject to state pre-auditNot pre-audited | T005680 | Jul 1, 2010to Jun 1, 2012 | Jul 1, 2010 | Jun 1, 2012 | $355,948$355,948 spent | $355,948 | |
Repair failed roof main fort building maritime suc DEB198TConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEB198T | Jun 9, 2010to Sep 21, 2011 | Jun 9, 2010 | Sep 21, 2011 | $158,000$155,738 spent | $155,738 | |
Stop water infiltration & repair interior finishes queensboro CF DEB156TConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEB156T | Apr 29, 2010to Oct 27, 2011 | Apr 29, 2010 | Oct 27, 2011 | $150,000$112,111 spent | $112,111 | |
Remediate excessive air temperature BLDG 4 new york psychiatric institute DEB157HConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEB157H | Mar 25, 2010to Jan 27, 2011 | Mar 25, 2010 | Jan 27, 2011 | $150,000$89,238 spent | $89,238 |
REPLACE ROOFS, BUILDINGS 40 &102, creedmoor psych. center, queens village.Office of General Services - Design & ConstructionJul 30, 2014 – Dec 23, 2015$1,067,319
- Description
- REPLACE ROOFS, BUILDINGS 40 &102, creedmoor psych. center, queens village.
- Contract number
- D44644C
- Type
- Construction: BuildingConstruction
- Term
- Jul 30, 2014 → Dec 23, 201517 months
- Approved
- Jul 30, 2014
- Status
- Ended
- Amount
- $1,067,319
- Spent to date
- $938,411 · 88% of the amount
Replace damaged roof building 60 creedmoor PCOffice of General Services - Design & ConstructionSep 20, 2013 – Jan 24, 2014$300,000
- Description
- Replace damaged roof building 60 creedmoor PC
- Contract number
- DEC443T
- Type
- Construction: BuildingConstruction
- Term
- Sep 20, 2013 → Jan 24, 20144 months
- Approved
- Oct 10, 2013
- Status
- Ended
- Amount
- $300,000
- Spent to date
- $278,008 · 93% of the amount
Decommission 1668 webster ave vacated building bronx new yorkOffice of General Services - Design & ConstructionJun 27, 2013 – Apr 30, 2014$200,000
- Description
- Decommission 1668 webster ave vacated building bronx new york
- Contract number
- DEC368P
- Type
- Construction: BuildingConstruction
- Term
- Jun 27, 2013 → Apr 30, 201410 months
- Approved
- Sep 13, 2013
- Status
- Ended
- Amount
- $200,000
- Spent to date
- $28,283 · 14% of the amount
Sucf 21233 replace roofState University Construction FundMay 6, 2013 – Mar 12, 2017$1,154,307
- Description
- Sucf 21233 replace roof
- Contract number
- T006018
- Type
- Contract not subject to state pre-auditNot pre-audited
- Term
- May 6, 2013 → Mar 12, 20173.8 years
- Approved
- Jul 31, 2013
- Status
- Ended
- Amount
- $1,154,307
- Spent to date
- $1,154,307 · 100% of the amount
Repair drill hall leaking roof brooklyn armoryOffice of General Services - Design & ConstructionMay 3, 2013 – Oct 8, 2013$150,000
- Description
- Repair drill hall leaking roof brooklyn armory
- Contract number
- DEC319T
- Type
- Construction: BuildingConstruction
- Term
- May 3, 2013 → Oct 8, 20135 months
- Approved
- Jun 17, 2013
- Status
- Ended
- Amount
- $150,000
- Spent to date
- $32,490 · 22% of the amount
Replace defective roofing system building 1 south beach PCOffice of General Services - Design & ConstructionFeb 29, 2012 – Aug 27, 2012$168,000
- Description
- Replace defective roofing system building 1 south beach PC
- Contract number
- DEB829T
- Type
- Construction: BuildingConstruction
- Term
- Feb 29, 2012 → Aug 27, 20126 months
- Approved
- Jun 25, 2012
- Status
- Ended
- Amount
- $168,000
- Spent to date
- $154,000 · 92% of the amount
Renovation to downstate depotSUNY - Health Science Center at BrooklynAug 31, 2011 – Aug 30, 2012$64,526
- Description
- Renovation to downstate depot
- Contract number
- T511014
- Type
- Contract not subject to state pre-auditNot pre-audited
- Term
- Aug 31, 2011 → Aug 30, 201212 months
- Approved
- Sep 14, 2011
- Status
- Ended
- Amount
- $64,526
- Spent to date
- $64,526 · 100% of the amount
Repair failed ac unit for building 40 staten island ddsoOffice of General Services - Design & ConstructionJun 2, 2011 – Sep 30, 2011$75,000
- Description
- Repair failed ac unit for building 40 staten island ddso
- Contract number
- DEB555H
- Type
- Construction: BuildingConstruction
- Term
- Jun 2, 2011 → Sep 30, 20114 months
- Approved
- Jul 25, 2011
- Status
- Ended
- Amount
- $75,000
- Spent to date
- $26,985 · 36% of the amount
Sucf 14a98 reroof basic science building SUNY HSC at brooklynState University Construction FundMar 30, 2011 – Feb 27, 2013$1,448,740
- Description
- Sucf 14a98 reroof basic science building SUNY HSC at brooklyn
- Contract number
- T005805
- Type
- Contract not subject to state pre-auditNot pre-audited
- Term
- Mar 30, 2011 → Feb 27, 20131.9 years
- Approved
- May 4, 2011
- Status
- Ended
- Amount
- $1,448,740
- Spent to date
- $1,448,740 · 100% of the amount
Provide independent boiler, bldgs 101,108 & 110 manhattan PCOffice of General Services - Design & ConstructionDec 22, 2010 – Feb 26, 2013$98,808
- Description
- Provide independent boiler, bldgs 101,108 & 110 manhattan PC
- Contract number
- D43750C
- Type
- Construction: BuildingConstruction
- Term
- Dec 22, 2010 → Feb 26, 20132.2 years
- Approved
- Dec 22, 2010
- Status
- Ended
- Amount
- $98,808
- Spent to date
- $74,982 · 76% of the amount
Stop water infiltration on roof creedmoor PCOffice of General Services - Design & ConstructionOct 28, 2010 – Oct 27, 2011$150,000
- Description
- Stop water infiltration on roof creedmoor PC
- Contract number
- DEB338T
- Type
- Construction: BuildingConstruction
- Term
- Oct 28, 2010 → Oct 27, 201112 months
- Approved
- Mar 4, 2011
- Status
- Ended
- Amount
- $150,000
- Spent to date
- $49,853 · 33% of the amount
Patch failed roofs BLDG 102 bronx PCOffice of General Services - Design & ConstructionSep 29, 2010 – Jul 6, 2011$100,000
- Description
- Patch failed roofs BLDG 102 bronx PC
- Contract number
- DEB331T
- Type
- Construction: BuildingConstruction
- Term
- Sep 29, 2010 → Jul 6, 20119 months
- Approved
- Jan 27, 2011
- Status
- Ended
- Amount
- $100,000
- Spent to date
- $14,323 · 14% of the amount
Replace valves & upgrade showers lincoln CFOffice of General Services - Design & ConstructionSep 28, 2010 – Jun 29, 2012$187,822
- Description
- Replace valves & upgrade showers lincoln CF
- Contract number
- D42621C
- Type
- Construction: BuildingConstruction
- Term
- Sep 28, 2010 → Jun 29, 20121.8 years
- Approved
- Mar 8, 2012
- Status
- Ended
- Amount
- $187,822
- Spent to date
- $175,294 · 93% of the amount
Provide CCTV/audio monitoring system bayview CFOffice of General Services - Design & ConstructionAug 3, 2010 – Jul 2, 2012$44,000
- Description
- Provide CCTV/audio monitoring system bayview CF
- Contract number
- D43340P
- Type
- Construction: BuildingConstruction
- Term
- Aug 3, 2010 → Jul 2, 20121.9 years
- Approved
- Aug 3, 2010
- Status
- Ended
- Amount
- $44,000
- Spent to date
- $42,894 · 97% of the amount
Provide low pressure power plant manhattan PCOffice of General Services - Design & ConstructionJul 9, 2010 – Jun 3, 2013$3,674,727
- Description
- Provide low pressure power plant manhattan PC
- Contract number
- D43368C
- Type
- Construction: BuildingConstruction
- Term
- Jul 9, 2010 → Jun 3, 20132.9 years
- Approved
- Jul 9, 2010
- Status
- Ended
- Amount
- $3,674,727
- Spent to date
- $3,671,599 · 100% of the amount
Repair failed rooftop chiller fulton CFOffice of General Services - Design & ConstructionJul 6, 2010 – Nov 3, 2010$100,000
- Description
- Repair failed rooftop chiller fulton CF
- Contract number
- DEB255H
- Type
- Construction: BuildingConstruction
- Term
- Jul 6, 2010 → Nov 3, 20104 months
- Approved
- Aug 11, 2010
- Status
- Ended
- Amount
- $100,000
- Spent to date
- $10,134 · 10% of the amount
Sucf 29364 repl roofs SRV group BLDG 38,39 & 39a SUNY at purchaseState University Construction FundJul 1, 2010 – Jun 1, 2012$355,948
- Description
- Sucf 29364 repl roofs SRV group BLDG 38,39 & 39a SUNY at purchase
- Contract number
- T005680
- Type
- Contract not subject to state pre-auditNot pre-audited
- Term
- Jul 1, 2010 → Jun 1, 20121.9 years
- Approved
- May 4, 2011
- Status
- Ended
- Amount
- $355,948
- Spent to date
- $355,948 · 100% of the amount
Repair failed roof main fort building maritime sucOffice of General Services - Design & ConstructionJun 9, 2010 – Sep 21, 2011$158,000
- Description
- Repair failed roof main fort building maritime suc
- Contract number
- DEB198T
- Type
- Construction: BuildingConstruction
- Term
- Jun 9, 2010 → Sep 21, 201115 months
- Approved
- Apr 6, 2011
- Status
- Ended
- Amount
- $158,000
- Spent to date
- $155,738 · 99% of the amount
Stop water infiltration & repair interior finishes queensboro CFOffice of General Services - Design & ConstructionApr 29, 2010 – Oct 27, 2011$150,000
- Description
- Stop water infiltration & repair interior finishes queensboro CF
- Contract number
- DEB156T
- Type
- Construction: BuildingConstruction
- Term
- Apr 29, 2010 → Oct 27, 20111.5 years
- Approved
- Apr 6, 2011
- Status
- Ended
- Amount
- $150,000
- Spent to date
- $112,111 · 75% of the amount
Remediate excessive air temperature BLDG 4 new york psychiatric instituteOffice of General Services - Design & ConstructionMar 25, 2010 – Jan 27, 2011$150,000
- Description
- Remediate excessive air temperature BLDG 4 new york psychiatric institute
- Contract number
- DEB157H
- Type
- Construction: BuildingConstruction
- Term
- Mar 25, 2010 → Jan 27, 201110 months
- Approved
- Aug 16, 2010
- Status
- Ended
- Amount
- $150,000
- Spent to date
- $89,238 · 59% of the amount
Contract-type mix
Share of contract value by type
- Construction27 contracts$12.4M
- Contract not subject to state pre-audit4 contracts$3.0M
Contracts over time
Contracts started per year
View as table
| Year | Contracts |
|---|---|
| 2007: 1 contracts, $168.2K | 1 |
| 2008: 2 contracts, $2.0M | 2 |
| 2009: 3 contracts, $1.3M | 3 |
| 2010: 15 contracts, $6.5M | 15 |
| 2011: 3 contracts, $1.6M | 3 |
| 2012: 1 contracts, $168.0K | 1 |
| 2013: 4 contracts, $1.8M | 4 |
| 2014: 1 contracts, $1.1M | 1 |
| 2015: 0 contracts, $0.0 | 0 |
| 2016: 0 contracts, $0.0 | 0 |
| 2017: 0 contracts, $0.0 | 0 |
| 2018: 0 contracts, $0.0 | 0 |
| 2019: 0 contracts, $0.0 | 0 |
| 2020: 0 contracts, $0.0 | 0 |
| 2021: 0 contracts, $0.0 | 0 |
| 2022: 0 contracts, $0.0 | 0 |
| 2023: 0 contracts, $0.0 | 0 |
| 2024: 0 contracts, $0.0 | 0 |
| 2025: 0 contracts, $0.0 | 0 |
| 2026: 0 contracts, $0.0 | 0 |
How the Contractor Score adds up
Established (B, 72/100): $15M in contracts, works with 3 agencies; but no contract since 2014.
- Contract volume+11.7measured
$15M in current contract value across 31 contracts, more than 89% of scored contractors.
- Recent activity−4.4measured
No active contracts today; the most recent was approved in July 2014.
- Agency breadth+6.8measured
Contracts with 3 different state agencies and facilities.
- Experience+2.5measured
First contract started in October 2006 (20 years of contract history).
- Contract-type mix+5.4measured
3 contract types; the largest group is construction (80% of value). Goods and services contracts are 80% of the total.
- Spending vs. value0.0measured
On 31 completed contracts with spending recorded, spending is 91% of the contract value. Spending below the full value is common (work can finish under budget) and isn't treated as a problem.
- Federal award history0.0unknown
No federal award history found. Scored as neutral.
- Federal registration0.0unknown
No federal contractor registration found. Scored as neutral.
50 + contributions = 72 (B, Established)Starts at 50. Bars: cool adds, warm subtracts.
Agencies served
Contract value with each agency or facility
Similar contractors
- A
Centennial Elevator Industries Inc
Construction & Renovation
Since 199810 agencies
- Contract value
- $14.7M
- Contracts
- 18
- Active
- 0
- A
Arrow Steel Window Corp
Farmingdale, NYConstruction & Renovation
Since 20075 agencies
- Contract value
- $14.2M
- Contracts
- 7
- Active
- 1
- A
M & J Electrical Contractors Corp
Construction & Renovation
Since 20076 agencies
- Contract value
- $34.7M
- Contracts
- 28
- Active
- 2
- A
Global Electrical Contracting of Westchester Inc
Construction & Renovation
Since 20055 agencies
- Contract value
- $81.3M
- Contracts
- 71
- Active
- 10
- B
Ahura Construction Management Inc
Construction & Renovation
Since 20104 agencies
- Contract value
- $2.8M
- Contracts
- 16
- Active
- 0
- A
Stalco Construction Inc
Islandia, NYConstruction & Renovation
Since 20097 agencies
- Contract value
- $91.0M
- Contracts
- 24
- Active
- 4
- More construction & renovation contractors Ranked by contract value
Browse more
- Office of General Services - Design & Construction contractors
- State University Construction Fund contractors
- SUNY - Health Science Center at Brooklyn contractors
- Construction & Renovation contractors
- Top contractors
- All contractors
Contract figures are public New York State contract records as of Nov 13, 2026: current contract amounts and spending to date as reported. Company details are shown when we can match this contractor to a registered business with confidence.
RFP Detector is an independent service and is not affiliated with any government agency. Scores are informational.