Ecco III Enterprises Inc
AYonkers, NY State contracts since 2005Updated Nov 13, 2026
Ecco III Enterprises Inc holds 41 contracts worth $1.8B with 4 New York State agencies, most with Department of Transportation; 6 active today. The first started in 2005.
- Total contract value
- $1.8B
- Current contract amounts
- Spent to date
- $962.9M
- 53% of contract value
- Active contracts
- 6
- $569.8M in active value
- Contracts on record
- 41
- Since 2005
- Agencies served
- 4
- Most with Department of Transportation
- Years active
- 21
- First contract 2005
Contact & company
Business information and how to reach the company.
Phone
Address
- Legal name
- E.c.c.o. III Enterprises, Inc.Doing business as Ecco III Enterprises Inc
- Identifiers
- UEI Y5EKBT46E3J7 · CAGE 0KRM1
- Federal registration
- Active · renews by Oct 2027
- In business since
- 1971
Industry codes (NAICS)
- 237310Highway, Street, and Bridge Construction
- 236210Industrial Building Construction
- 237110Water and Sewer Line and Related Structures Construction
- 237990Other Heavy and Civil Engineering Construction
- 238110Poured Concrete Foundation and Structure Contractors
- 238120Structural Steel and Precast Concrete Contractors
- 238190Other Foundation, Structure, and Building Exterior Contractors
- 238290Other Building Equipment Contractors
- 238910Site Preparation Contractors
Leadership
Raymond Gizzi
President
Bill Cromeek, PE
Vice President, Design-Build
Ciro Poccia, PE
Assistant Vice President, Operations - Highway
John Gizzi
Owner
Paul Cocks
Vice President, Operations - Highway
Paul Doscher
Vice President, Operations - Railroad
Richard Gizzi Sr.
Former President/Founder
Richard Lombardi
Vice President, Operations - Mechanical, Shop and Labor Relations
Robert Pucila
Chief Financial Officer/Treasurer
Robert Zottoli
Chief Estimator
Domenic Pasqua
Eeo Officer
Josephine McCaffrey
Corporate Risk Manager
Contracts
41 contracts with New York State agencies, active first. Open a row for the full record.
| Details | Contract | Type | Contract no. | Term | |||||
|---|---|---|---|---|---|---|---|---|---|
PA Filed Contract for Design Build Services for ADA upgrades and station renewals MTA Pelham Line DA46040Contract not subject to state pre-auditActive | MTA Construction and Development Company | Contract not subject to state pre-auditNot pre-audited | DA46040 | Aug 31, 2026to Jul 31, 2029 | Aug 31, 2026 | Jul 31, 2029 | $170,389,000$0 spent | $0 | |
Where and when structures repair for various locations in Columbia Dutchess Orange & Ulster Counties D265822Construction: Standby contractsActive | Department of Transportation | Construction: Standby contractsConstruction | D265822 | Aug 14, 2026to Sep 14, 2028 | Aug 14, 2026 | Sep 14, 2028 | $3,150,626$0 spent | $0 | |
Bridge replacements Ramp G of I 84 over Interstates 84 & 684 Town of Southeast in Putnam County D265693Construction: HighwayActive | Department of Transportation | Construction: HighwayConstruction | D265693 | Mar 27, 2026to Dec 31, 2028 | Mar 27, 2026 | Dec 31, 2028 | $24,492,000$2,026,005 spent | $2,026,005 | |
Highway & bridge reconstruction NY Route 17 exit 12 Region 8 Town of Wallkill Orange County D265297Construction: BuildingActive | Department of Transportation | Construction: BuildingConstruction | D265297 | Feb 24, 2025to Dec 20, 2026 | Feb 24, 2025 | Dec 20, 2026 | $68,882,371$37,366,190 spent | $37,366,190 | |
Structures Where and When region wide Columbia Dutchess Orange Putnam & Westchester Counties D265281Construction: Standby contractsActive | Department of Transportation | Construction: Standby contractsConstruction | D265281 | Aug 30, 2024to Dec 17, 2026 | Aug 30, 2024 | Dec 17, 2026 | $16,710,251$14,356,810 spent | $14,356,810 | |
PA Filed Contract for ADA upgrades & circulation improvements at Broadway Junction Complex DA37130Contract not subject to state pre-auditActive | MTA Construction and Development Company | Contract not subject to state pre-auditNot pre-audited | DA37130 | Dec 30, 2023to Sep 4, 2027 | Dec 30, 2023 | Sep 4, 2027 | $286,131,000$0 spent | $0 | |
Highway Reconstruction Rte 6 Annsville Circle for flood mitigation Cortland Westchester County D265217Construction: Highway | Department of Transportation | Construction: HighwayConstruction | D265217 | May 31, 2024to Feb 5, 2026 | May 31, 2024 | Feb 5, 2026 | $26,070,527$23,180,230 spent | $23,180,230 | |
Stipend agreement for proposal prep for D900057 Grand Central Parkway bridge rehab Queens County D041280Service: Other / misc. services | Department of Transportation | Service: Other / misc. servicesService | D041280 | Jan 20, 2023to Jun 2, 2024 | Jan 20, 2023 | Jun 2, 2024 | $295,000$295,000 spent | $295,000 | |
PA Filed Contract design build services replace Fulton Avenue & South Street bridges New York Co D168632Contract not subject to state pre-audit | MTA Construction and Development Company | Contract not subject to state pre-auditNot pre-audited | D168632 | Jan 3, 2023to Feb 17, 2025 | Jan 3, 2023 | Feb 17, 2025 | $37,978,000$0 spent | $0 | |
Highway where & when region wide various municipalities Region 8 counties D264862Construction: Standby contracts | Department of Transportation | Construction: Standby contractsConstruction | D264862 | Dec 20, 2022to Oct 30, 2024 | Dec 20, 2022 | Oct 30, 2024 | $16,103,874$16,103,874 spent | $16,103,874 | |
Structures Where and When general and emergency response region wide Region 8 D264850Construction: Standby contracts | Department of Transportation | Construction: Standby contractsConstruction | D264850 | Sep 14, 2022to Dec 27, 2024 | Sep 14, 2022 | Dec 27, 2024 | $15,269,130$15,269,130 spent | $15,269,130 | |
Replace Bridge138th Street over Major Deegan Expressway Bronx County D264507Construction: Highway | Department of Transportation | Construction: HighwayConstruction | D264507 | Sep 2, 2021to Oct 14, 2026 | Sep 2, 2021 | Oct 14, 2026 | $68,505,133$60,261,220 spent | $60,261,220 | |
Replace Bronx River Pkwy bridge/Metro-North Railroad Woodlawn/Wakefield section Bronx County D264422Construction: Highway | Department of Transportation | Construction: HighwayConstruction | D264422 | Jul 6, 2021to Jun 9, 2025 | Jul 6, 2021 | Jun 9, 2025 | $69,004,268$69,003,659 spent | $69,003,659 | |
Structures where & when general and emergency bridge repair 2021-2022 Region 8 D264323Construction: Standby contracts | Department of Transportation | Construction: Standby contractsConstruction | D264323 | Nov 9, 2020to Dec 30, 2022 | Nov 9, 2020 | Dec 30, 2022 | $4,687,114$4,687,114 spent | $4,687,114 | |
Highway Where & When Project Various Locations Region 8 D264307Construction: Highway | Department of Transportation | Construction: HighwayConstruction | D264307 | Oct 19, 2020to Jun 30, 2023 | Oct 19, 2020 | Jun 30, 2023 | $5,608,476$5,608,476 spent | $5,608,476 | |
Bridge Replacement Ravensdale over Saw Mill River Parkway Hastings on Hudson Westchester County D264094Construction: Highway | Department of Transportation | Construction: HighwayConstruction | D264094 | Mar 2, 2020to Sep 2, 2022 | Mar 2, 2020 | Sep 2, 2022 | $18,543,520$18,543,520 spent | $18,543,520 | |
Stipend Agreement for Proposal Prep/Submission D900049 Lower Westchester Bridge Bundle D038028Service: Other / misc. services | Department of Transportation | Service: Other / misc. servicesService | D038028 | Sep 16, 2019to Feb 11, 2020 | Sep 16, 2019 | Feb 11, 2020 | $299,000$299,000 spent | $299,000 | |
Structures Where & When Region 8 D263817Construction: Standby contracts | Department of Transportation | Construction: Standby contractsConstruction | D263817 | Jan 18, 2019to Feb 26, 2021 | Jan 18, 2019 | Feb 26, 2021 | $3,089,137$3,089,137 spent | $3,089,137 | |
Reconstruct I-95 New England Thruway Replace & Rehab Bridges TANE 18-7 Westchester County D214568Construction: Building | New York State Thruway Authority | Construction: BuildingConstruction | D214568 | Aug 6, 2018to Oct 15, 2022 | Aug 6, 2018 | Oct 15, 2022 | $139,353,576$0 spent | $0 | |
Lower Hudson Transit Link NY-59 Pedestrian Safety Improvements Rockland County D263687Construction: Highway | Department of Transportation | Construction: HighwayConstruction | D263687 | Jul 12, 2018to Nov 25, 2020 | Jul 12, 2018 | Nov 25, 2020 | $11,407,637$11,407,637 spent | $11,407,637 |
PA Filed Contract for Design Build Services for ADA upgrades and station renewals MTA Pelham LineMTA Construction and Development CompanyAug 31, 2026 – Jul 31, 2029Active$170,389,000
- Description
- PA Filed Contract for Design Build Services for ADA upgrades and station renewals MTA Pelham Line
- Contract number
- DA46040
- Type
- Contract not subject to state pre-auditNot pre-audited
- Term
- Aug 31, 2026 → Jul 31, 20292.9 years
- Approved
- Oct 2, 2026
- Status
- Active
- Amount
- $170,389,000
- Spent to date
- $0 · 0% of the amount
Where and when structures repair for various locations in Columbia Dutchess Orange & Ulster CountiesDepartment of TransportationAug 14, 2026 – Sep 14, 2028Active$3,150,626
- Description
- Where and when structures repair for various locations in Columbia Dutchess Orange & Ulster Counties
- Contract number
- D265822
- Type
- Construction: Standby contractsConstruction
- Term
- Aug 14, 2026 → Sep 14, 20282.1 years
- Approved
- Aug 14, 2026
- Status
- Active
- Amount
- $3,150,626
- Spent to date
- $0 · 0% of the amount
Bridge replacements Ramp G of I 84 over Interstates 84 & 684 Town of Southeast in Putnam CountyDepartment of TransportationMar 27, 2026 – Dec 31, 2028Active$24,492,000
- Description
- Bridge replacements Ramp G of I 84 over Interstates 84 & 684 Town of Southeast in Putnam County
- Contract number
- D265693
- Type
- Construction: HighwayConstruction
- Term
- Mar 27, 2026 → Dec 31, 20282.8 years
- Approved
- Mar 27, 2026
- Status
- Active
- Amount
- $24,492,000
- Spent to date
- $2,026,005 · 8% of the amount
Highway & bridge reconstruction NY Route 17 exit 12 Region 8 Town of Wallkill Orange CountyDepartment of TransportationFeb 24, 2025 – Dec 20, 2026Active$68,882,371
- Description
- Highway & bridge reconstruction NY Route 17 exit 12 Region 8 Town of Wallkill Orange County
- Contract number
- D265297
- Type
- Construction: BuildingConstruction
- Term
- Feb 24, 2025 → Dec 20, 20261.8 years
- Approved
- Feb 24, 2025
- Status
- Active
- Amount
- $68,882,371
- Spent to date
- $37,366,190 · 54% of the amount
Structures Where and When region wide Columbia Dutchess Orange Putnam & Westchester CountiesDepartment of TransportationAug 30, 2024 – Dec 17, 2026Active$16,710,251
- Description
- Structures Where and When region wide Columbia Dutchess Orange Putnam & Westchester Counties
- Contract number
- D265281
- Type
- Construction: Standby contractsConstruction
- Term
- Aug 30, 2024 → Dec 17, 20262.3 years
- Approved
- Aug 30, 2024
- Status
- Active
- Amount
- $16,710,251
- Spent to date
- $14,356,810 · 86% of the amount
PA Filed Contract for ADA upgrades & circulation improvements at Broadway Junction ComplexMTA Construction and Development CompanyDec 30, 2023 – Sep 4, 2027Active$286,131,000
- Description
- PA Filed Contract for ADA upgrades & circulation improvements at Broadway Junction Complex
- Contract number
- DA37130
- Type
- Contract not subject to state pre-auditNot pre-audited
- Term
- Dec 30, 2023 → Sep 4, 20273.7 years
- Approved
- Feb 5, 2024
- Status
- Active
- Amount
- $286,131,000
- Spent to date
- $0 · 0% of the amount
Highway Reconstruction Rte 6 Annsville Circle for flood mitigation Cortland Westchester CountyDepartment of TransportationMay 31, 2024 – Feb 5, 2026$26,070,527
- Description
- Highway Reconstruction Rte 6 Annsville Circle for flood mitigation Cortland Westchester County
- Contract number
- D265217
- Type
- Construction: HighwayConstruction
- Term
- May 31, 2024 → Feb 5, 20261.7 years
- Approved
- May 31, 2024
- Status
- Ended
- Amount
- $26,070,527
- Spent to date
- $23,180,230 · 89% of the amount
Stipend agreement for proposal prep for D900057 Grand Central Parkway bridge rehab Queens CountyDepartment of TransportationJan 20, 2023 – Jun 2, 2024$295,000
- Description
- Stipend agreement for proposal prep for D900057 Grand Central Parkway bridge rehab Queens County
- Contract number
- D041280
- Type
- Service: Other / misc. servicesService
- Term
- Jan 20, 2023 → Jun 2, 202416 months
- Approved
- Nov 2, 2023
- Status
- Ended
- Amount
- $295,000
- Spent to date
- $295,000 · 100% of the amount
PA Filed Contract design build services replace Fulton Avenue & South Street bridges New York CoMTA Construction and Development CompanyJan 3, 2023 – Feb 17, 2025$37,978,000
- Description
- PA Filed Contract design build services replace Fulton Avenue & South Street bridges New York Co
- Contract number
- D168632
- Type
- Contract not subject to state pre-auditNot pre-audited
- Term
- Jan 3, 2023 → Feb 17, 20252.1 years
- Approved
- Jul 29, 2024
- Status
- Ended
- Amount
- $37,978,000
- Spent to date
- $0 · 0% of the amount
Highway where & when region wide various municipalities Region 8 countiesDepartment of TransportationDec 20, 2022 – Oct 30, 2024$16,103,874
- Description
- Highway where & when region wide various municipalities Region 8 counties
- Contract number
- D264862
- Type
- Construction: Standby contractsConstruction
- Term
- Dec 20, 2022 → Oct 30, 20241.8 years
- Approved
- Dec 20, 2022
- Status
- Ended
- Amount
- $16,103,874
- Spent to date
- $16,103,874 · 100% of the amount
Structures Where and When general and emergency response region wide Region 8Department of TransportationSep 14, 2022 – Dec 27, 2024$15,269,130
- Description
- Structures Where and When general and emergency response region wide Region 8
- Contract number
- D264850
- Type
- Construction: Standby contractsConstruction
- Term
- Sep 14, 2022 → Dec 27, 20242.3 years
- Approved
- Sep 14, 2022
- Status
- Ended
- Amount
- $15,269,130
- Spent to date
- $15,269,130 · 100% of the amount
Replace Bridge138th Street over Major Deegan Expressway Bronx CountyDepartment of TransportationSep 2, 2021 – Oct 14, 2026$68,505,133
- Description
- Replace Bridge138th Street over Major Deegan Expressway Bronx County
- Contract number
- D264507
- Type
- Construction: HighwayConstruction
- Term
- Sep 2, 2021 → Oct 14, 20265.1 years
- Approved
- Sep 2, 2021
- Status
- Ended
- Amount
- $68,505,133
- Spent to date
- $60,261,220 · 88% of the amount
Replace Bronx River Pkwy bridge/Metro-North Railroad Woodlawn/Wakefield section Bronx CountyDepartment of TransportationJul 6, 2021 – Jun 9, 2025$69,004,268
- Description
- Replace Bronx River Pkwy bridge/Metro-North Railroad Woodlawn/Wakefield section Bronx County
- Contract number
- D264422
- Type
- Construction: HighwayConstruction
- Term
- Jul 6, 2021 → Jun 9, 20253.9 years
- Approved
- Jul 6, 2021
- Status
- Ended
- Amount
- $69,004,268
- Spent to date
- $69,003,659 · 100% of the amount
Structures where & when general and emergency bridge repair 2021-2022 Region 8Department of TransportationNov 9, 2020 – Dec 30, 2022$4,687,114
- Description
- Structures where & when general and emergency bridge repair 2021-2022 Region 8
- Contract number
- D264323
- Type
- Construction: Standby contractsConstruction
- Term
- Nov 9, 2020 → Dec 30, 20222.2 years
- Approved
- Nov 9, 2020
- Status
- Ended
- Amount
- $4,687,114
- Spent to date
- $4,687,114 · 100% of the amount
Highway Where & When Project Various Locations Region 8Department of TransportationOct 19, 2020 – Jun 30, 2023$5,608,476
- Description
- Highway Where & When Project Various Locations Region 8
- Contract number
- D264307
- Type
- Construction: HighwayConstruction
- Term
- Oct 19, 2020 → Jun 30, 20232.7 years
- Approved
- Oct 19, 2020
- Status
- Ended
- Amount
- $5,608,476
- Spent to date
- $5,608,476 · 100% of the amount
Bridge Replacement Ravensdale over Saw Mill River Parkway Hastings on Hudson Westchester CountyDepartment of TransportationMar 2, 2020 – Sep 2, 2022$18,543,520
- Description
- Bridge Replacement Ravensdale over Saw Mill River Parkway Hastings on Hudson Westchester County
- Contract number
- D264094
- Type
- Construction: HighwayConstruction
- Term
- Mar 2, 2020 → Sep 2, 20222.5 years
- Approved
- Mar 2, 2020
- Status
- Ended
- Amount
- $18,543,520
- Spent to date
- $18,543,520 · 100% of the amount
Stipend Agreement for Proposal Prep/Submission D900049 Lower Westchester Bridge BundleDepartment of TransportationSep 16, 2019 – Feb 11, 2020$299,000
- Description
- Stipend Agreement for Proposal Prep/Submission D900049 Lower Westchester Bridge Bundle
- Contract number
- D038028
- Type
- Service: Other / misc. servicesService
- Term
- Sep 16, 2019 → Feb 11, 20205 months
- Approved
- Aug 17, 2020
- Status
- Ended
- Amount
- $299,000
- Spent to date
- $299,000 · 100% of the amount
Structures Where & When Region 8Department of TransportationJan 18, 2019 – Feb 26, 2021$3,089,137
- Description
- Structures Where & When Region 8
- Contract number
- D263817
- Type
- Construction: Standby contractsConstruction
- Term
- Jan 18, 2019 → Feb 26, 20212.1 years
- Approved
- Jan 18, 2019
- Status
- Ended
- Amount
- $3,089,137
- Spent to date
- $3,089,137 · 100% of the amount
Reconstruct I-95 New England Thruway Replace & Rehab Bridges TANE 18-7 Westchester CountyNew York State Thruway AuthorityAug 6, 2018 – Oct 15, 2022$139,353,576
- Description
- Reconstruct I-95 New England Thruway Replace & Rehab Bridges TANE 18-7 Westchester County
- Contract number
- D214568
- Type
- Construction: BuildingConstruction
- Term
- Aug 6, 2018 → Oct 15, 20224.2 years
- Approved
- Aug 6, 2018
- Status
- Ended
- Amount
- $139,353,576
- Spent to date
- $0 · 0% of the amount
Lower Hudson Transit Link NY-59 Pedestrian Safety Improvements Rockland CountyDepartment of TransportationJul 12, 2018 – Nov 25, 2020$11,407,637
- Description
- Lower Hudson Transit Link NY-59 Pedestrian Safety Improvements Rockland County
- Contract number
- D263687
- Type
- Construction: HighwayConstruction
- Term
- Jul 12, 2018 → Nov 25, 20202.3 years
- Approved
- Jul 12, 2018
- Status
- Ended
- Amount
- $11,407,637
- Spent to date
- $11,407,637 · 100% of the amount
Contract-type mix
Share of contract value by type
- Construction32 contracts$1.2B
- Contract not subject to state pre-audit4 contracts$614.4M
- Service: Other / misc. services5 contracts$954.0K
Contracts over time
Contracts started per year
View as table
| Year | Contracts |
|---|---|
| 2007: 1 contracts, $14.3M | 1 |
| 2008: 1 contracts, $36.6M | 1 |
| 2009: 1 contracts, $16.3M | 1 |
| 2010: 2 contracts, $221.0M | 2 |
| 2011: 0 contracts, $0.0 | 0 |
| 2012: 1 contracts, $21.4M | 1 |
| 2013: 1 contracts, $12.0M | 1 |
| 2014: 3 contracts, $26.4M | 3 |
| 2015: 2 contracts, $102.9M | 2 |
| 2016: 2 contracts, $48.9M | 2 |
| 2017: 5 contracts, $244.1M | 5 |
| 2018: 3 contracts, $210.6M | 3 |
| 2019: 2 contracts, $3.4M | 2 |
| 2020: 3 contracts, $28.8M | 3 |
| 2021: 2 contracts, $137.5M | 2 |
| 2022: 2 contracts, $31.4M | 2 |
| 2023: 3 contracts, $324.4M | 3 |
| 2024: 2 contracts, $42.8M | 2 |
| 2025: 1 contracts, $68.9M | 1 |
| 2026: 3 contracts, $198.0M | 3 |
How the Contractor Score adds up
Extensive (A, 100/100): $1.8B in contracts, 6 active contracts.
- Contract volume+21.8measured
$1.8B in current contract value across 41 contracts, among the largest 1% of scored contractors.
- Recent activity+18.0measured
6 active contracts today; the most recent was approved in October 2026.
- Agency breadth+8.3measured
Contracts with 4 different state agencies and facilities.
- Experience+2.7measured
First contract started in August 2005 (21 years of contract history).
- Contract-type mix+5.8measured
5 contract types; the largest group is construction (66% of value). Goods and services contracts are 66% of the total.
- Spending vs. value+0.1measured
On 31 completed contracts with spending recorded, spending is 98% of the contract value. Spending below the full value is common (work can finish under budget) and isn't treated as a problem.
- Federal award history0.0unknown
No federal award history found. Scored as neutral.
- Federal registration+5.2measured
Registered to do business with the federal government (registration active).
50 + contributions = 111.9, capped at 100Starts at 50. Bars: cool adds, warm subtracts.
Agencies served
Contract value with each agency or facility
Similar contractors
- A
Tutor Perini Corporation
Construction & Renovation
Since 20005 agencies
- Contract value
- $2.1B
- Contracts
- 11
- Active
- 0
- A
Tully Construction Co Inc
Corona, NYConstruction & Renovation
Since 20054 agencies
- Contract value
- $2.4B
- Contracts
- 34
- Active
- 5
- A
Ahern Painting Contractors Inc
Port Washington, NYConstruction & Renovation
Since 20084 agencies
- Contract value
- $381.0M
- Contracts
- 15
- Active
- 4
- A
Halmar International LLC
Nanuet, NYConstruction & Renovation
Since 20114 agencies
- Contract value
- $2.1B
- Contracts
- 25
- Active
- 2
- A
LK Comstock & Company LLC
Farmingdale, NYConstruction & Renovation
Since 19844 agencies
- Contract value
- $2.6B
- Contracts
- 24
- Active
- 4
- A
El Sol Contracting Es II Enterprises JV
Maspeth, NYConstruction & Renovation
Since 20153 agencies
- Contract value
- $1.2B
- Contracts
- 31
- Active
- 4
- More construction & renovation contractors Ranked by contract value
Browse more
- Department of Transportation contractors
- MTA Construction and Development Company contractors
- New York State Thruway Authority contractors
- New York City Transit Authority contractors
- Construction & Renovation contractors
- Top contractors
- All contractors
Contract figures are public New York State contract records as of Nov 13, 2026: current contract amounts and spending to date as reported. Company details are shown when we can match this contractor to a registered business with confidence.