FC & C Construction Ent Inc
BState contracts since 2008Updated Nov 13, 2026
FC & C Construction Ent Inc holds 20 contracts worth $7.9M with 2 New York State agencies, most with Office of General Services - Design & Construction; none active today. The first started in 2008.
- Total contract value
- $7.9M
- Current contract amounts
- Spent to date
- $7.2M
- 91% of contract value
- Active contracts
- 0
- None active today
- Contracts on record
- 20
- Since 2008
- Agencies served
- 2
- Most with Office of General Services - Design & Construction
- Years active
- 18
- First contract 2008
Contact & company
Business information and how to reach the company.
Contracts
20 contracts with New York State agencies, active first. Open a row for the full record.
| Details | Contract | Type | Contract no. | Term | |||||
|---|---|---|---|---|---|---|---|---|---|
Provide security screens Building 15 Green Haven CF Dutchess County DQ1829CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DQ1829C | Apr 13, 2023to Mar 14, 2024 | Apr 13, 2023 | Mar 14, 2024 | $363,400$283,732 spent | $283,732 | |
Door replacement services at Highland Residential Center building 29 C029701Service: Building services | Office of Children & Family Services | Service: Building servicesService | C029701 | Jan 1, 2023to Apr 30, 2024 | Jan 1, 2023 | Apr 30, 2024 | $294,780$294,780 spent | $294,780 | |
Clean Restore Repair Fire Damage Eastern CF Ulster County DEE065CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEE065C | Mar 29, 2019to Sep 25, 2019 | Mar 29, 2019 | Sep 25, 2019 | $300,000$62,700 spent | $62,700 | |
Replace gym floor, Redhook Residential Center, Dutchess County DQ1736CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DQ1736C | Apr 30, 2018to Mar 13, 2019 | Apr 30, 2018 | Mar 13, 2019 | $352,813$333,466 spent | $333,466 | |
Replace screens/observation cells, Bldg. 21-2, Fishkill CF, Dutchess County D45275CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D45275C | Apr 30, 2018to Jan 2, 2020 | Apr 30, 2018 | Jan 2, 2020 | $142,536$139,772 spent | $139,772 | |
Install Steel Plates/Cell Block Repair, Sing Sing, CF Westchester County DED778CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DED778C | Mar 20, 2018to Oct 4, 2018 | Mar 20, 2018 | Oct 4, 2018 | $300,000$189,096 spent | $189,096 | |
Renovate SHU and lobby elevators, Green Haven CF. D44969CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D44969C | Nov 4, 2016to Dec 13, 2019 | Nov 4, 2016 | Dec 13, 2019 | $462,617$455,723 spent | $455,723 | |
Rehab Kitchen and Dining Areas, Goshen RC (General Construction) D44775CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D44775C | Jun 21, 2016to Dec 30, 2018 | Jun 21, 2016 | Dec 30, 2018 | $928,200$928,015 spent | $928,015 | |
Correct Leaking Bathroom Floor, Bldg 718 Rockland PC Middletown Campus, Orange County DED061CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DED061C | Nov 9, 2015to Mar 8, 2016 | Nov 9, 2015 | Mar 8, 2016 | $75,000$49,499 spent | $49,499 | |
Repair/Replace Deteriorated Bathroom Floors-Construction, Otisville CF DEC965CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEC965C | Jul 2, 2015to Nov 29, 2015 | Jul 2, 2015 | Nov 29, 2015 | $300,000$214,967 spent | $214,967 | |
Assignment of Surety Takeover-Replace Underground Heat and Water Lines at Ulster CF D45258CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D45258C | Feb 20, 2015to Sep 24, 2018 | Feb 20, 2015 | Sep 24, 2018 | $72,261$72,261 spent | $72,261 | |
Repair/Replace doors facility wide Ulster CF D43835CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D43835C | Jan 20, 2015to Jan 9, 2017 | Jan 20, 2015 | Jan 9, 2017 | $538,610$537,625 spent | $537,625 | |
Repair life safety risks RCTP dorm day room & dining room sing sing CF DEC528CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEC528C | Jan 8, 2014to Sep 30, 2014 | Jan 8, 2014 | Sep 30, 2014 | $300,000$297,738 spent | $297,738 | |
Provide Bathroom Facility, Ball Field, Building No. 122 @ Woodbourne CF D44165CConstruction: Miscellaneous | Office of General Services - Design & Construction | Construction: MiscellaneousConstruction | D44165C | Apr 19, 2013to Aug 30, 2014 | Apr 19, 2013 | Aug 30, 2014 | $629,900$600,170 spent | $600,170 | |
Investigate and stabilize exterior masonry building 12 wallkill correctional facility DEC130CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEC130C | Nov 15, 2012to Oct 17, 2013 | Nov 15, 2012 | Oct 17, 2013 | $300,000$295,183 spent | $295,183 | |
Repair leaking roofs on family reunion buildings bedford hills CF DEB713CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEB713C | Oct 28, 2011to Feb 25, 2012 | Oct 28, 2011 | Feb 25, 2012 | $125,600$113,600 spent | $113,600 | |
Repair water infiltration powerhouse BLDG 50 rockland PC DEB420CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEB420C | Dec 9, 2010to Apr 8, 2011 | Dec 9, 2010 | Apr 8, 2011 | $75,000$45,792 spent | $45,792 | |
Provide respiratory isolation rooms in building 5 downstate CF D43712CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D43712C | Feb 19, 2010to Jun 14, 2012 | Feb 19, 2010 | Jun 14, 2012 | $610,800$571,833 spent | $571,833 | |
Replace various doors, bldgs 26, 105-115, 118 and 121-124 otisville CF DM2750CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DM2750C | Sep 3, 2009to Oct 28, 2011 | Sep 3, 2009 | Oct 28, 2011 | $1,003,999$1,003,999 spent | $1,003,999 | |
Rehab loading docks buildingsg #32 and 8 fishkill CF, dutchess county DM2778CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DM2778C | Oct 2, 2008to Jan 26, 2011 | Oct 2, 2008 | Jan 26, 2011 | $737,248$735,115 spent | $735,115 |
Provide security screens Building 15 Green Haven CF Dutchess CountyOffice of General Services - Design & ConstructionApr 13, 2023 – Mar 14, 2024$363,400
- Description
- Provide security screens Building 15 Green Haven CF Dutchess County
- Contract number
- DQ1829C
- Type
- Construction: BuildingConstruction
- Term
- Apr 13, 2023 → Mar 14, 202411 months
- Approved
- Apr 13, 2023
- Status
- Ended
- Amount
- $363,400
- Spent to date
- $283,732 · 78% of the amount
Door replacement services at Highland Residential Center building 29Office of Children & Family ServicesJan 1, 2023 – Apr 30, 2024$294,780
- Description
- Door replacement services at Highland Residential Center building 29
- Contract number
- C029701
- Type
- Service: Building servicesService
- Term
- Jan 1, 2023 → Apr 30, 202416 months
- Approved
- Feb 7, 2023
- Status
- Ended
- Amount
- $294,780
- Spent to date
- $294,780 · 100% of the amount
Clean Restore Repair Fire Damage Eastern CF Ulster CountyOffice of General Services - Design & ConstructionMar 29, 2019 – Sep 25, 2019$300,000
- Description
- Clean Restore Repair Fire Damage Eastern CF Ulster County
- Contract number
- DEE065C
- Type
- Construction: BuildingConstruction
- Term
- Mar 29, 2019 → Sep 25, 20196 months
- Approved
- May 30, 2019
- Status
- Ended
- Amount
- $300,000
- Spent to date
- $62,700 · 21% of the amount
Replace gym floor, Redhook Residential Center, Dutchess CountyOffice of General Services - Design & ConstructionApr 30, 2018 – Mar 13, 2019$352,813
- Description
- Replace gym floor, Redhook Residential Center, Dutchess County
- Contract number
- DQ1736C
- Type
- Construction: BuildingConstruction
- Term
- Apr 30, 2018 → Mar 13, 201910 months
- Approved
- Apr 30, 2018
- Status
- Ended
- Amount
- $352,813
- Spent to date
- $333,466 · 95% of the amount
Replace screens/observation cells, Bldg. 21-2, Fishkill CF, Dutchess CountyOffice of General Services - Design & ConstructionApr 30, 2018 – Jan 2, 2020$142,536
- Description
- Replace screens/observation cells, Bldg. 21-2, Fishkill CF, Dutchess County
- Contract number
- D45275C
- Type
- Construction: BuildingConstruction
- Term
- Apr 30, 2018 → Jan 2, 20201.7 years
- Approved
- Apr 30, 2018
- Status
- Ended
- Amount
- $142,536
- Spent to date
- $139,772 · 98% of the amount
Install Steel Plates/Cell Block Repair, Sing Sing, CF Westchester CountyOffice of General Services - Design & ConstructionMar 20, 2018 – Oct 4, 2018$300,000
- Description
- Install Steel Plates/Cell Block Repair, Sing Sing, CF Westchester County
- Contract number
- DED778C
- Type
- Construction: BuildingConstruction
- Term
- Mar 20, 2018 → Oct 4, 20187 months
- Approved
- Jun 4, 2018
- Status
- Ended
- Amount
- $300,000
- Spent to date
- $189,096 · 63% of the amount
Renovate SHU and lobby elevators, Green Haven CF.Office of General Services - Design & ConstructionNov 4, 2016 – Dec 13, 2019$462,617
- Description
- Renovate SHU and lobby elevators, Green Haven CF.
- Contract number
- D44969C
- Type
- Construction: BuildingConstruction
- Term
- Nov 4, 2016 → Dec 13, 20193.1 years
- Approved
- Nov 4, 2016
- Status
- Ended
- Amount
- $462,617
- Spent to date
- $455,723 · 99% of the amount
Rehab Kitchen and Dining Areas, Goshen RC (General Construction)Office of General Services - Design & ConstructionJun 21, 2016 – Dec 30, 2018$928,200
- Description
- Rehab Kitchen and Dining Areas, Goshen RC (General Construction)
- Contract number
- D44775C
- Type
- Construction: BuildingConstruction
- Term
- Jun 21, 2016 → Dec 30, 20182.5 years
- Approved
- Jun 21, 2016
- Status
- Ended
- Amount
- $928,200
- Spent to date
- $928,015 · 100% of the amount
Correct Leaking Bathroom Floor, Bldg 718 Rockland PC Middletown Campus, Orange CountyOffice of General Services - Design & ConstructionNov 9, 2015 – Mar 8, 2016$75,000
- Description
- Correct Leaking Bathroom Floor, Bldg 718 Rockland PC Middletown Campus, Orange County
- Contract number
- DED061C
- Type
- Construction: BuildingConstruction
- Term
- Nov 9, 2015 → Mar 8, 20164 months
- Approved
- Dec 24, 2015
- Status
- Ended
- Amount
- $75,000
- Spent to date
- $49,499 · 66% of the amount
Repair/Replace Deteriorated Bathroom Floors-Construction, Otisville CFOffice of General Services - Design & ConstructionJul 2, 2015 – Nov 29, 2015$300,000
- Description
- Repair/Replace Deteriorated Bathroom Floors-Construction, Otisville CF
- Contract number
- DEC965C
- Type
- Construction: BuildingConstruction
- Term
- Jul 2, 2015 → Nov 29, 20155 months
- Approved
- Aug 19, 2015
- Status
- Ended
- Amount
- $300,000
- Spent to date
- $214,967 · 72% of the amount
Assignment of Surety Takeover-Replace Underground Heat and Water Lines at Ulster CFOffice of General Services - Design & ConstructionFeb 20, 2015 – Sep 24, 2018$72,261
- Description
- Assignment of Surety Takeover-Replace Underground Heat and Water Lines at Ulster CF
- Contract number
- D45258C
- Type
- Construction: BuildingConstruction
- Term
- Feb 20, 2015 → Sep 24, 20183.6 years
- Approved
- Apr 24, 2015
- Status
- Ended
- Amount
- $72,261
- Spent to date
- $72,261 · 100% of the amount
Repair/Replace doors facility wide Ulster CFOffice of General Services - Design & ConstructionJan 20, 2015 – Jan 9, 2017$538,610
- Description
- Repair/Replace doors facility wide Ulster CF
- Contract number
- D43835C
- Type
- Construction: BuildingConstruction
- Term
- Jan 20, 2015 → Jan 9, 20172 years
- Approved
- Jan 20, 2015
- Status
- Ended
- Amount
- $538,610
- Spent to date
- $537,625 · 100% of the amount
Repair life safety risks RCTP dorm day room & dining room sing sing CFOffice of General Services - Design & ConstructionJan 8, 2014 – Sep 30, 2014$300,000
- Description
- Repair life safety risks RCTP dorm day room & dining room sing sing CF
- Contract number
- DEC528C
- Type
- Construction: BuildingConstruction
- Term
- Jan 8, 2014 → Sep 30, 20149 months
- Approved
- Feb 4, 2014
- Status
- Ended
- Amount
- $300,000
- Spent to date
- $297,738 · 99% of the amount
Provide Bathroom Facility, Ball Field, Building No. 122 @ Woodbourne CFOffice of General Services - Design & ConstructionApr 19, 2013 – Aug 30, 2014$629,900
- Description
- Provide Bathroom Facility, Ball Field, Building No. 122 @ Woodbourne CF
- Contract number
- D44165C
- Type
- Construction: MiscellaneousConstruction
- Term
- Apr 19, 2013 → Aug 30, 201416 months
- Approved
- Apr 19, 2013
- Status
- Ended
- Amount
- $629,900
- Spent to date
- $600,170 · 95% of the amount
Investigate and stabilize exterior masonry building 12 wallkill correctional facilityOffice of General Services - Design & ConstructionNov 15, 2012 – Oct 17, 2013$300,000
- Description
- Investigate and stabilize exterior masonry building 12 wallkill correctional facility
- Contract number
- DEC130C
- Type
- Construction: BuildingConstruction
- Term
- Nov 15, 2012 → Oct 17, 201311 months
- Approved
- Jan 2, 2013
- Status
- Ended
- Amount
- $300,000
- Spent to date
- $295,183 · 98% of the amount
Repair leaking roofs on family reunion buildings bedford hills CFOffice of General Services - Design & ConstructionOct 28, 2011 – Feb 25, 2012$125,600
- Description
- Repair leaking roofs on family reunion buildings bedford hills CF
- Contract number
- DEB713C
- Type
- Construction: BuildingConstruction
- Term
- Oct 28, 2011 → Feb 25, 20124 months
- Approved
- Dec 9, 2011
- Status
- Ended
- Amount
- $125,600
- Spent to date
- $113,600 · 90% of the amount
Repair water infiltration powerhouse BLDG 50 rockland PCOffice of General Services - Design & ConstructionDec 9, 2010 – Apr 8, 2011$75,000
- Description
- Repair water infiltration powerhouse BLDG 50 rockland PC
- Contract number
- DEB420C
- Type
- Construction: BuildingConstruction
- Term
- Dec 9, 2010 → Apr 8, 20114 months
- Approved
- Jan 18, 2011
- Status
- Ended
- Amount
- $75,000
- Spent to date
- $45,792 · 61% of the amount
Provide respiratory isolation rooms in building 5 downstate CFOffice of General Services - Design & ConstructionFeb 19, 2010 – Jun 14, 2012$610,800
- Description
- Provide respiratory isolation rooms in building 5 downstate CF
- Contract number
- D43712C
- Type
- Construction: BuildingConstruction
- Term
- Feb 19, 2010 → Jun 14, 20122.3 years
- Approved
- Feb 19, 2010
- Status
- Ended
- Amount
- $610,800
- Spent to date
- $571,833 · 94% of the amount
Replace various doors, bldgs 26, 105-115, 118 and 121-124 otisville CFOffice of General Services - Design & ConstructionSep 3, 2009 – Oct 28, 2011$1,003,999
- Description
- Replace various doors, bldgs 26, 105-115, 118 and 121-124 otisville CF
- Contract number
- DM2750C
- Type
- Construction: BuildingConstruction
- Term
- Sep 3, 2009 → Oct 28, 20112.2 years
- Approved
- Aug 11, 2011
- Status
- Ended
- Amount
- $1,003,999
- Spent to date
- $1,003,999 · 100% of the amount
Rehab loading docks buildingsg #32 and 8 fishkill CF, dutchess countyOffice of General Services - Design & ConstructionOct 2, 2008 – Jan 26, 2011$737,248
- Description
- Rehab loading docks buildingsg #32 and 8 fishkill CF, dutchess county
- Contract number
- DM2778C
- Type
- Construction: BuildingConstruction
- Term
- Oct 2, 2008 → Jan 26, 20112.3 years
- Approved
- Sep 9, 2010
- Status
- Ended
- Amount
- $737,248
- Spent to date
- $735,115 · 100% of the amount
Contract-type mix
Share of contract value by type
- Construction19 contracts$7.6M
- Service: Building services1 contract$294.8K
Contracts over time
Contracts started per year
View as table
| Year | Contracts |
|---|---|
| 2008: 1 contracts, $737.2K | 1 |
| 2009: 1 contracts, $1.0M | 1 |
| 2010: 2 contracts, $685.8K | 2 |
| 2011: 1 contracts, $125.6K | 1 |
| 2012: 1 contracts, $300.0K | 1 |
| 2013: 1 contracts, $629.9K | 1 |
| 2014: 1 contracts, $300.0K | 1 |
| 2015: 4 contracts, $985.9K | 4 |
| 2016: 2 contracts, $1.4M | 2 |
| 2017: 0 contracts, $0.0 | 0 |
| 2018: 3 contracts, $795.3K | 3 |
| 2019: 1 contracts, $300.0K | 1 |
| 2020: 0 contracts, $0.0 | 0 |
| 2021: 0 contracts, $0.0 | 0 |
| 2022: 0 contracts, $0.0 | 0 |
| 2023: 2 contracts, $658.2K | 2 |
| 2024: 0 contracts, $0.0 | 0 |
| 2025: 0 contracts, $0.0 | 0 |
| 2026: 0 contracts, $0.0 | 0 |
How the Contractor Score adds up
Established (B, 73/100): $7.9M in contracts, mix of 3 contract types.
- Contract volume+9.5measured
$7.9M in current contract value across 20 contracts, more than 84% of scored contractors.
- Recent activity+0.7measured
No active contracts today; the most recent was approved in April 2023.
- Agency breadth+4.3measured
Contracts with 2 different state agencies and facilities.
- Experience+1.9measured
First contract started in October 2008 (18 years of contract history).
- Contract-type mix+6.4measured
3 contract types; the largest group is construction (96% of value). Goods and services contracts are 100% of the total.
- Spending vs. value0.0measured
On 20 completed contracts with spending recorded, spending is 91% of the contract value. Spending below the full value is common (work can finish under budget) and isn't treated as a problem.
- Federal award history0.0unknown
No federal award history found. Scored as neutral.
- Federal registration0.0unknown
No federal contractor registration found. Scored as neutral.
50 + contributions = 73 (B, Established)Starts at 50. Bars: cool adds, warm subtracts.
Agencies served
Contract value with each agency or facility
Similar contractors
- A
Crosby-Brownlie Inc
Construction & Renovation
Since 20096 agencies
- Contract value
- $13.2M
- Contracts
- 34
- Active
- 1
- A
Colonie Mechanical Contractors Inc
Colonie, NYConstruction & Renovation
Since 20074 agencies
- Contract value
- $2.4M
- Contracts
- 16
- Active
- 1
- A
Environmental & Fueling Systems LLC
Troy, NYConstruction & Renovation
Since 20094 agencies
- Contract value
- $106.2M
- Contracts
- 55
- Active
- 4
- B
Industrial Power & Lighting Corp
Construction & Renovation
Since 20094 agencies
- Contract value
- $7.9M
- Contracts
- 27
- Active
- 0
- B
Blackmon Farrell Electric Inc
Construction & Renovation
Since 20052 agencies
- Contract value
- $7.9M
- Contracts
- 5
- Active
- 0
- C
Vamco Sheet Metal Inc
Construction & Renovation
Since 20051 agency
- Contract value
- $8.0M
- Contracts
- 2
- Active
- 0
- More construction & renovation contractors Ranked by contract value
Browse more
- Office of General Services - Design & Construction contractors
- Office of Children & Family Services contractors
- Construction & Renovation contractors
- Top contractors
- All contractors
Contract figures are public New York State contract records as of Nov 13, 2026: current contract amounts and spending to date as reported. Company details are shown when we can match this contractor to a registered business with confidence.
RFP Detector is an independent service and is not affiliated with any government agency. Scores are informational.