AState contracts since 2008Updated Nov 13, 2026
Hmi Mechanical Systems Inc holds 135 contracts worth $65.9M with 7 New York State agencies, most with Office of General Services - Design & Construction; none active today. The first started in 2008.
- Total contract value
- $65.9M
- Current contract amounts
- Spent to date
- $44.2M
- 67% of contract value
- Active contracts
- 0
- None active today
- Contracts on record
- 135
- Since 2008
- Agencies served
- 7
- Most with Office of General Services - Design & Construction
- Years active
- 18
- First contract 2008
Contact & company
Business information and how to reach the company.
Contracts
135 contracts with New York State agencies, active first. Open a row for the full record.
| Details | Contract | Type | Contract no. | Term | |||||
|---|---|---|---|---|---|---|---|---|---|
Repair & replace chiller Finger Lakes Residential Center Tompkins County D47205HConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D47205H | May 30, 2023to Jun 6, 2025 | May 30, 2023 | Jun 6, 2025 | $1,450,482$1,411,359 spent | $1,411,359 | |
Replace fan coil units at the Agritech Raw Products building D012188Construction: Miscellaneous | New York State Statutory College - Cornell University | Construction: MiscellaneousConstruction | D012188 | Mar 17, 2023to Oct 26, 2024 | Mar 17, 2023 | Oct 26, 2024 | $439,808$439,808 spent | $439,808 | |
Job Order Contract JOC plumbing work Area 7 multiple counties D47367PConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D47367P | Feb 24, 2023to Feb 24, 2026 | Feb 24, 2023 | Feb 24, 2026 | $500,000$81,087 spent | $81,087 | |
Job Order Contract plumbing work Area 5 multiple counties D47365PConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D47365P | Feb 14, 2023to Feb 14, 2026 | Feb 14, 2023 | Feb 14, 2026 | $1,500,000$301,368 spent | $301,368 | |
Repair steam leaks at Mid-State Correctional Facility Oneida County DEE912HConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEE912H | Dec 7, 2022to Apr 6, 2023 | Dec 7, 2022 | Apr 6, 2023 | $100,000$7,605 spent | $7,605 | |
Provide Facility Closure Willard Drug Treatment Center Seneca County DQ1826HConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DQ1826H | Nov 18, 2022to Aug 14, 2024 | Nov 18, 2022 | Aug 14, 2024 | $948,000$623,531 spent | $623,531 | |
Provide Facility Closure Willard Drug Treatment Center Seneca County DQ1826PConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DQ1826P | Nov 18, 2022to Aug 14, 2024 | Nov 18, 2022 | Aug 14, 2024 | $810,000$430,604 spent | $430,604 | |
Repair leaking heat line Bldgs 144 145 146 Mohawk CF Oneida County DEE903GConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEE903G | Nov 14, 2022to Apr 28, 2023 | Nov 14, 2022 | Apr 28, 2023 | $300,000$124,037 spent | $124,037 | |
Project m20875-steam condensat T202217Contract not subject to state pre-audit | College of Environmental Science & Forestry | Contract not subject to state pre-auditNot pre-audited | T202217 | Jun 2, 2022to Aug 15, 2022 | Jun 2, 2022 | Aug 15, 2022 | $18,900$18,900 spent | $18,900 | |
Provide bar screen Building 23 Cayuga CF Cayuga County DQ1805PConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DQ1805P | Apr 18, 2022to Jul 5, 2023 | Apr 18, 2022 | Jul 5, 2023 | $24,700$24,651 spent | $24,651 | |
Repair water main break Hughes State Office Bldg Syracuse Onondaga County DEE764GConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEE764G | Feb 1, 2022to Sep 9, 2022 | Feb 1, 2022 | Sep 9, 2022 | $175,000$134,365 spent | $134,365 | |
Job Order Contracting Area 5 counties D47115HConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D47115H | Sep 13, 2021to Feb 1, 2026 | Sep 13, 2021 | Feb 1, 2026 | $750,000$503,051 spent | $503,051 | |
Job Order Contract Area 6 Jefferson Lewis & St Lawrence Counties D47116HConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D47116H | Sep 7, 2021to Mar 6, 2025 | Sep 7, 2021 | Mar 6, 2025 | $750,000$544,264 spent | $544,264 | |
Job Order Contract Area 6 Jefferson Lewis & St Lawrence Counties D47116PConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D47116P | Sep 7, 2021to Sep 7, 2024 | Sep 7, 2021 | Sep 7, 2024 | $500,000$256,102 spent | $256,102 | |
Job order contracting Area 7 Chemung Livingston Monroe Ontario Schuyler Seneca Steuben Wayne Yates D47117HConstruction: Highway | Office of General Services - Design & Construction | Construction: HighwayConstruction | D47117H | Aug 31, 2021to Aug 31, 2024 | Aug 31, 2021 | Aug 31, 2024 | $750,000$114,958 spent | $114,958 | |
Rehabilitation of hot water heating system at Walters Hall D202001Construction: Miscellaneous | College of Environmental Science & Forestry | Construction: MiscellaneousConstruction | D202001 | Mar 9, 2021to Mar 17, 2024 | Mar 9, 2021 | Mar 17, 2024 | $1,916,972$1,916,972 spent | $1,916,972 | |
Provide Classrooms & Office Space Bldg 38 Residential Rehab Unit Cayuga CF Cayuga County D46130HConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D46130H | Apr 27, 2020to Aug 31, 2022 | Apr 27, 2020 | Aug 31, 2022 | $664,000$638,403 spent | $638,403 | |
Provide Classrooms & Office Space Bldg 38 Residential Rehab Unit Cayuga CF Cayuga County D46130PConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D46130P | Apr 27, 2020to Aug 31, 2022 | Apr 27, 2020 | Aug 31, 2022 | $294,110$270,217 spent | $270,217 | |
Provide Driveway & Rehabilitate Parking Lot NYS Academy Of Fire Science Renss. County D45802PConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D45802P | Mar 13, 2020to Mar 28, 2021 | Mar 13, 2020 | Mar 28, 2021 | $146,200$139,000 spent | $139,000 | |
Job Order Contracting Plumbing Area 5 D46165PConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D46165P | Feb 28, 2020to Sep 7, 2023 | Feb 28, 2020 | Sep 7, 2023 | $500,000$227,355 spent | $227,355 |
Repair & replace chiller Finger Lakes Residential Center Tompkins CountyOffice of General Services - Design & ConstructionMay 30, 2023 – Jun 6, 2025$1,450,482
- Description
- Repair & replace chiller Finger Lakes Residential Center Tompkins County
- Contract number
- D47205H
- Type
- Construction: BuildingConstruction
- Term
- May 30, 2023 → Jun 6, 20252 years
- Approved
- May 30, 2023
- Status
- Ended
- Amount
- $1,450,482
- Spent to date
- $1,411,359 · 97% of the amount
Replace fan coil units at the Agritech Raw Products buildingNew York State Statutory College - Cornell UniversityMar 17, 2023 – Oct 26, 2024$439,808
- Description
- Replace fan coil units at the Agritech Raw Products building
- Contract number
- D012188
- Type
- Construction: MiscellaneousConstruction
- Term
- Mar 17, 2023 → Oct 26, 20241.6 years
- Approved
- Mar 7, 2023
- Status
- Ended
- Amount
- $439,808
- Spent to date
- $439,808 · 100% of the amount
Job Order Contract JOC plumbing work Area 7 multiple countiesOffice of General Services - Design & ConstructionFeb 24, 2023 – Feb 24, 2026$500,000
- Description
- Job Order Contract JOC plumbing work Area 7 multiple counties
- Contract number
- D47367P
- Type
- Construction: BuildingConstruction
- Term
- Feb 24, 2023 → Feb 24, 20263 years
- Approved
- Feb 24, 2023
- Status
- Ended
- Amount
- $500,000
- Spent to date
- $81,087 · 16% of the amount
Job Order Contract plumbing work Area 5 multiple countiesOffice of General Services - Design & ConstructionFeb 14, 2023 – Feb 14, 2026$1,500,000
- Description
- Job Order Contract plumbing work Area 5 multiple counties
- Contract number
- D47365P
- Type
- Construction: BuildingConstruction
- Term
- Feb 14, 2023 → Feb 14, 20263 years
- Approved
- Feb 14, 2023
- Status
- Ended
- Amount
- $1,500,000
- Spent to date
- $301,368 · 20% of the amount
Repair steam leaks at Mid-State Correctional Facility Oneida CountyOffice of General Services - Design & ConstructionDec 7, 2022 – Apr 6, 2023$100,000
- Description
- Repair steam leaks at Mid-State Correctional Facility Oneida County
- Contract number
- DEE912H
- Type
- Construction: BuildingConstruction
- Term
- Dec 7, 2022 → Apr 6, 20234 months
- Approved
- Jan 19, 2023
- Status
- Ended
- Amount
- $100,000
- Spent to date
- $7,605 · 8% of the amount
Provide Facility Closure Willard Drug Treatment Center Seneca CountyOffice of General Services - Design & ConstructionNov 18, 2022 – Aug 14, 2024$948,000
- Description
- Provide Facility Closure Willard Drug Treatment Center Seneca County
- Contract number
- DQ1826H
- Type
- Construction: BuildingConstruction
- Term
- Nov 18, 2022 → Aug 14, 20241.8 years
- Approved
- Nov 18, 2022
- Status
- Ended
- Amount
- $948,000
- Spent to date
- $623,531 · 66% of the amount
Provide Facility Closure Willard Drug Treatment Center Seneca CountyOffice of General Services - Design & ConstructionNov 18, 2022 – Aug 14, 2024$810,000
- Description
- Provide Facility Closure Willard Drug Treatment Center Seneca County
- Contract number
- DQ1826P
- Type
- Construction: BuildingConstruction
- Term
- Nov 18, 2022 → Aug 14, 20241.8 years
- Approved
- Nov 18, 2022
- Status
- Ended
- Amount
- $810,000
- Spent to date
- $430,604 · 53% of the amount
Repair leaking heat line Bldgs 144 145 146 Mohawk CF Oneida CountyOffice of General Services - Design & ConstructionNov 14, 2022 – Apr 28, 2023$300,000
- Description
- Repair leaking heat line Bldgs 144 145 146 Mohawk CF Oneida County
- Contract number
- DEE903G
- Type
- Construction: BuildingConstruction
- Term
- Nov 14, 2022 → Apr 28, 20235 months
- Approved
- Mar 6, 2023
- Status
- Ended
- Amount
- $300,000
- Spent to date
- $124,037 · 41% of the amount
Project m20875-steam condensatCollege of Environmental Science & ForestryJun 2, 2022 – Aug 15, 2022$18,900
- Description
- Project m20875-steam condensat
- Contract number
- T202217
- Type
- Contract not subject to state pre-auditNot pre-audited
- Term
- Jun 2, 2022 → Aug 15, 20222 months
- Approved
- Jul 19, 2022
- Status
- Ended
- Amount
- $18,900
- Spent to date
- $18,900 · 100% of the amount
Provide bar screen Building 23 Cayuga CF Cayuga CountyOffice of General Services - Design & ConstructionApr 18, 2022 – Jul 5, 2023$24,700
- Description
- Provide bar screen Building 23 Cayuga CF Cayuga County
- Contract number
- DQ1805P
- Type
- Construction: BuildingConstruction
- Term
- Apr 18, 2022 → Jul 5, 202315 months
- Approved
- Apr 18, 2022
- Status
- Ended
- Amount
- $24,700
- Spent to date
- $24,651 · 100% of the amount
Repair water main break Hughes State Office Bldg Syracuse Onondaga CountyOffice of General Services - Design & ConstructionFeb 1, 2022 – Sep 9, 2022$175,000
- Description
- Repair water main break Hughes State Office Bldg Syracuse Onondaga County
- Contract number
- DEE764G
- Type
- Construction: BuildingConstruction
- Term
- Feb 1, 2022 → Sep 9, 20227 months
- Approved
- Mar 8, 2022
- Status
- Ended
- Amount
- $175,000
- Spent to date
- $134,365 · 77% of the amount
Job Order Contracting Area 5 countiesOffice of General Services - Design & ConstructionSep 13, 2021 – Feb 1, 2026$750,000
- Description
- Job Order Contracting Area 5 counties
- Contract number
- D47115H
- Type
- Construction: BuildingConstruction
- Term
- Sep 13, 2021 → Feb 1, 20264.4 years
- Approved
- Sep 13, 2021
- Status
- Ended
- Amount
- $750,000
- Spent to date
- $503,051 · 67% of the amount
Job Order Contract Area 6 Jefferson Lewis & St Lawrence CountiesOffice of General Services - Design & ConstructionSep 7, 2021 – Mar 6, 2025$750,000
- Description
- Job Order Contract Area 6 Jefferson Lewis & St Lawrence Counties
- Contract number
- D47116H
- Type
- Construction: BuildingConstruction
- Term
- Sep 7, 2021 → Mar 6, 20253.5 years
- Approved
- Sep 7, 2021
- Status
- Ended
- Amount
- $750,000
- Spent to date
- $544,264 · 73% of the amount
Job Order Contract Area 6 Jefferson Lewis & St Lawrence CountiesOffice of General Services - Design & ConstructionSep 7, 2021 – Sep 7, 2024$500,000
- Description
- Job Order Contract Area 6 Jefferson Lewis & St Lawrence Counties
- Contract number
- D47116P
- Type
- Construction: BuildingConstruction
- Term
- Sep 7, 2021 → Sep 7, 20243 years
- Approved
- Sep 7, 2021
- Status
- Ended
- Amount
- $500,000
- Spent to date
- $256,102 · 51% of the amount
Job order contracting Area 7 Chemung Livingston Monroe Ontario Schuyler Seneca Steuben Wayne YatesOffice of General Services - Design & ConstructionAug 31, 2021 – Aug 31, 2024$750,000
- Description
- Job order contracting Area 7 Chemung Livingston Monroe Ontario Schuyler Seneca Steuben Wayne Yates
- Contract number
- D47117H
- Type
- Construction: HighwayConstruction
- Term
- Aug 31, 2021 → Aug 31, 20243 years
- Approved
- Aug 31, 2021
- Status
- Ended
- Amount
- $750,000
- Spent to date
- $114,958 · 15% of the amount
Rehabilitation of hot water heating system at Walters HallCollege of Environmental Science & ForestryMar 9, 2021 – Mar 17, 2024$1,916,972
- Description
- Rehabilitation of hot water heating system at Walters Hall
- Contract number
- D202001
- Type
- Construction: MiscellaneousConstruction
- Term
- Mar 9, 2021 → Mar 17, 20243 years
- Approved
- Mar 5, 2021
- Status
- Ended
- Amount
- $1,916,972
- Spent to date
- $1,916,972 · 100% of the amount
Provide Classrooms & Office Space Bldg 38 Residential Rehab Unit Cayuga CF Cayuga CountyOffice of General Services - Design & ConstructionApr 27, 2020 – Aug 31, 2022$664,000
- Description
- Provide Classrooms & Office Space Bldg 38 Residential Rehab Unit Cayuga CF Cayuga County
- Contract number
- D46130H
- Type
- Construction: BuildingConstruction
- Term
- Apr 27, 2020 → Aug 31, 20222.3 years
- Approved
- Apr 27, 2020
- Status
- Ended
- Amount
- $664,000
- Spent to date
- $638,403 · 96% of the amount
Provide Classrooms & Office Space Bldg 38 Residential Rehab Unit Cayuga CF Cayuga CountyOffice of General Services - Design & ConstructionApr 27, 2020 – Aug 31, 2022$294,110
- Description
- Provide Classrooms & Office Space Bldg 38 Residential Rehab Unit Cayuga CF Cayuga County
- Contract number
- D46130P
- Type
- Construction: BuildingConstruction
- Term
- Apr 27, 2020 → Aug 31, 20222.3 years
- Approved
- Apr 27, 2020
- Status
- Ended
- Amount
- $294,110
- Spent to date
- $270,217 · 92% of the amount
Provide Driveway & Rehabilitate Parking Lot NYS Academy Of Fire Science Renss. CountyOffice of General Services - Design & ConstructionMar 13, 2020 – Mar 28, 2021$146,200
- Description
- Provide Driveway & Rehabilitate Parking Lot NYS Academy Of Fire Science Renss. County
- Contract number
- D45802P
- Type
- Construction: BuildingConstruction
- Term
- Mar 13, 2020 → Mar 28, 202112 months
- Approved
- Mar 13, 2020
- Status
- Ended
- Amount
- $146,200
- Spent to date
- $139,000 · 95% of the amount
Job Order Contracting Plumbing Area 5Office of General Services - Design & ConstructionFeb 28, 2020 – Sep 7, 2023$500,000
- Description
- Job Order Contracting Plumbing Area 5
- Contract number
- D46165P
- Type
- Construction: BuildingConstruction
- Term
- Feb 28, 2020 → Sep 7, 20233.5 years
- Approved
- Feb 28, 2020
- Status
- Ended
- Amount
- $500,000
- Spent to date
- $227,355 · 45% of the amount
Contract-type mix
Share of contract value by type
- Construction129 contracts$64.5M
- Contract not subject to state pre-audit5 contracts$1.3M
- Service: Other / misc. services1 contract$83.0K
Contracts over time
Contracts started per year
View as table
| Year | Contracts |
|---|---|
| 2008: 2 contracts, $3.8M | 2 |
| 2009: 0 contracts, $0.0 | 0 |
| 2010: 12 contracts, $3.6M | 12 |
| 2011: 21 contracts, $9.1M | 21 |
| 2012: 13 contracts, $2.9M | 13 |
| 2013: 5 contracts, $862.4K | 5 |
| 2014: 18 contracts, $8.7M | 18 |
| 2015: 9 contracts, $7.3M | 9 |
| 2016: 8 contracts, $4.3M | 8 |
| 2017: 11 contracts, $6.4M | 11 |
| 2018: 9 contracts, $5.1M | 9 |
| 2019: 6 contracts, $873.5K | 6 |
| 2020: 5 contracts, $2.1M | 5 |
| 2021: 5 contracts, $4.7M | 5 |
| 2022: 7 contracts, $2.4M | 7 |
| 2023: 4 contracts, $3.9M | 4 |
| 2024: 0 contracts, $0.0 | 0 |
| 2025: 0 contracts, $0.0 | 0 |
| 2026: 0 contracts, $0.0 | 0 |
How the Contractor Score adds up
Extensive (A, 87/100): $66M in contracts, works with 7 agencies.
- Contract volume+16.3measured
$66M in current contract value across 135 contracts, more than 95% of scored contractors.
- Recent activity+0.8measured
No active contracts today; the most recent was approved in May 2023.
- Agency breadth+10.9measured
Contracts with 7 different state agencies and facilities.
- Experience+2.2measured
First contract started in February 2008 (18 years of contract history).
- Contract-type mix+7.4measured
5 contract types; the largest group is construction (98% of value). Goods and services contracts are 98% of the total.
- Spending vs. value−0.7measured
On 131 completed contracts with spending recorded, spending is 70% of the contract value. Spending below the full value is common (work can finish under budget) and isn't treated as a problem.
- Federal award history0.0unknown
No federal award history found. Scored as neutral.
- Federal registration0.0unknown
No federal contractor registration found. Scored as neutral.
50 + contributions = 87 (A, Extensive)Starts at 50. Bars: cool adds, warm subtracts.
Agencies served
Contract value with each agency or facility
- Office of General Services - Design & Construction124 contracts$61.6M
- College of Environmental Science & Forestry2 contracts$1.9M
- College at Oswego3 contracts$824.7K
- Office of Parks Recreation & Historic Preservation3 contracts$576.5K
- State University Construction Fund1 contract$474.3K
- New York State Statutory College - Cornell University1 contract$439.8K
- Rochester Psychiatric Center1 contract$83.0K
Similar contractors
- A
John W Danforth Company
Tonawanda, NYConstruction & Renovation
Since 200722 agencies
- Contract value
- $97.0M
- Contracts
- 160
- Active
- 14
- A
Titan Roofing Inc
Construction & Renovation
Since 200816 agencies
- Contract value
- $137.7M
- Contracts
- 128
- Active
- 7
- A
Wilkins Mechanical Inc
Construction & Renovation
Since 200810 agencies
- Contract value
- $67.9M
- Contracts
- 125
- Active
- 0
- A
Postler & Jaeckle Corp
Rochester, NYConstruction & Renovation
Since 200819 agencies
- Contract value
- $56.7M
- Contracts
- 101
- Active
- 12
- A
New Britain Roofing Co Inc
Construction & Renovation
Since 20069 agencies
- Contract value
- $106.6M
- Contracts
- 71
- Active
- 10
- A
Elmer W Davis Inc
Construction & Renovation
Since 20079 agencies
- Contract value
- $33.2M
- Contracts
- 31
- Active
- 2
- More construction & renovation contractors Ranked by contract value
Browse more
- Office of General Services - Design & Construction contractors
- College of Environmental Science & Forestry contractors
- College at Oswego contractors
- Office of Parks Recreation & Historic Preservation contractors
- Construction & Renovation contractors
- Top contractors
- All contractors
Contract figures are public New York State contract records as of Nov 13, 2026: current contract amounts and spending to date as reported. Company details are shown when we can match this contractor to a registered business with confidence.
RFP Detector is an independent service and is not affiliated with any government agency. Scores are informational.