Holt Architects PC
AState contracts since 2003Updated Nov 13, 2026
Holt Architects PC holds 40 contracts worth $26.4M with 13 New York State agencies, most with State University Construction Fund; 3 active today. The first started in 2003.
- Total contract value
- $26.4M
- Current contract amounts
- Spent to date
- $18.0M
- 68% of contract value
- Active contracts
- 3
- $9.3M in active value
- Contracts on record
- 40
- Since 2003
- Agencies served
- 13
- Most with State University Construction Fund
- Years active
- 23
- First contract 2003
Contact & company
Business information and how to reach the company.
Phone
Leadership
A. Quay Thompson
Principal | President
Cate Blakemore
Principal Associate | Dir. of Code Compliance
Chris Apker
Chief Financial Officer
David Taube
President Emeritus
Kelly Maher
Principal
Paul Levesque II
Principal
Richard Wagner
Principal Associate
Steve Hugo
Principal
Allison Short
Office Manager
Charlie Ackerman
Associate | Director of CA
Charlie Sidle
Asst. Dir. Marketing & Business Dev.
Graham Gillespie
Senior Advisor
Contracts
40 contracts with New York State agencies, active first. Open a row for the full record.
| Details | Contract | Type | Contract no. | Term | |||||
|---|---|---|---|---|---|---|---|---|---|
Term agreement architectural services SUNY Cortland Cortland County D000965Consultant: Architect, engineering and appraisal related servicesActive | College at Cortland | Consultant: Architect, engineering and appraisal related servicesConsultant | D000965 | Mar 19, 2025to Mar 18, 2028 | Mar 19, 2025 | Mar 18, 2028 | $700,000$221,874 spent | $221,874 | |
SUCF151124 Renovate DLAR 4th T006609Contract not subject to state pre-auditActive | State University Construction Fund | Contract not subject to state pre-auditNot pre-audited | T006609 | Apr 26, 2021to Jun 30, 2029 | Apr 26, 2021 | Jun 30, 2029 | $3,648,192$2,618,614 spent | $2,618,614 | |
SUCF 80807 Architectural Serv T006584Contract not subject to state pre-auditActive | State University Construction Fund | Contract not subject to state pre-auditNot pre-audited | T006584 | Sep 14, 2020to Mar 5, 2027 | Sep 14, 2020 | Mar 5, 2027 | $5,000,000$290,841 spent | $290,841 | |
Consultant agreement design services Weiskotten Hall SUNY Upstate Medical University D550394Consultant: Architect, engineering and appraisal related services | SUNY - Upstate Medical University | Consultant: Architect, engineering and appraisal related servicesConsultant | D550394 | Mar 18, 2025to Sep 9, 2026 | Mar 18, 2025 | Sep 9, 2026 | $188,682$150,767 spent | $150,767 | |
Design consultant project 1486 T550382Contract not subject to state pre-audit | SUNY - Upstate Medical University | Contract not subject to state pre-auditNot pre-audited | T550382 | Aug 29, 2024to Oct 16, 2025 | Aug 29, 2024 | Oct 16, 2025 | $88,806$88,586 spent | $88,586 | |
Backdrop term agreement architectural design & study services SUNY Cortland D000906Consultant: Architect, engineering and appraisal related services | College at Cortland | Consultant: Architect, engineering and appraisal related servicesConsultant | D000906 | Nov 13, 2023to Nov 12, 2026 | Nov 13, 2023 | Nov 12, 2026 | $700,000$636,353 spent | $636,353 | |
Project 151154 / 1418 uh 6w en T550344Contract not subject to state pre-audit | SUNY - Upstate Medical University | Contract not subject to state pre-auditNot pre-audited | T550344 | Nov 8, 2022to May 21, 2024 | Nov 8, 2022 | May 21, 2024 | $104,741$102,622 spent | $102,622 | |
Project 151152 / 1150 communit T550341Contract not subject to state pre-audit | SUNY - Upstate Medical University | Contract not subject to state pre-auditNot pre-audited | T550341 | Sep 28, 2022to Aug 30, 2023 | Sep 28, 2022 | Aug 30, 2023 | $140,288$140,288 spent | $140,288 | |
Project 151129 / 1352 uh 6w ca T550334Contract not subject to state pre-audit | SUNY - Upstate Medical University | Contract not subject to state pre-auditNot pre-audited | T550334 | Jun 27, 2022to Oct 30, 2024 | Jun 27, 2022 | Oct 30, 2024 | $71,329$71,329 spent | $71,329 | |
Locker room modifications- mer T000228Contract not subject to state pre-audit | College at Geneseo | Contract not subject to state pre-auditNot pre-audited | T000228 | Jul 21, 2021to Aug 1, 2022 | Jul 21, 2021 | Aug 1, 2022 | $7,500$7,500 spent | $7,500 | |
Term consulting 2021 per propo T400467Contract not subject to state pre-audit | College at Morrisville | Contract not subject to state pre-auditNot pre-audited | T400467 | Mar 26, 2021to Mar 25, 2024 | Mar 26, 2021 | Mar 25, 2024 | $700,000$466,366 spent | $466,366 | |
Project 151106 / 1242 ucc CT r T550304Contract not subject to state pre-audit | SUNY - Upstate Medical University | Contract not subject to state pre-auditNot pre-audited | T550304 | Jan 15, 2021to Oct 31, 2022 | Jan 15, 2021 | Oct 31, 2022 | $50,833$49,909 spent | $49,909 | |
151067 / 1112.7 Uh fluoro room T550295Contract not subject to state pre-audit | SUNY - Upstate Medical University | Contract not subject to state pre-auditNot pre-audited | T550295 | Nov 10, 2020to May 31, 2022 | Nov 10, 2020 | May 31, 2022 | $46,866$45,262 spent | $45,262 | |
Design seymour union ballroom T191801Contract not subject to state pre-audit | College at Brockport | Contract not subject to state pre-auditNot pre-audited | T191801 | May 21, 2020to Dec 31, 2023 | May 21, 2020 | Dec 31, 2023 | $281,178$269,614 spent | $269,614 | |
Design for m09557 - replace do T110008Contract not subject to state pre-audit | College at Oneonta | Contract not subject to state pre-auditNot pre-audited | T110008 | Apr 27, 2020to Feb 28, 2022 | Apr 27, 2020 | Feb 28, 2022 | $41,196$41,196 spent | $41,196 | |
151030/1058 Ver 2 hyperbaric a T550281Contract not subject to state pre-audit | SUNY - Upstate Medical University | Contract not subject to state pre-auditNot pre-audited | T550281 | Jan 13, 2020to Jan 30, 2025 | Jan 13, 2020 | Jan 30, 2025 | $390,032$390,032 spent | $390,032 | |
Park center athletic training T000762Contract not subject to state pre-audit | College at Cortland | Contract not subject to state pre-auditNot pre-audited | T000762 | Dec 20, 2019to Sep 1, 2022 | Dec 20, 2019 | Sep 1, 2022 | $98,624$98,624 spent | $98,624 | |
Consultant contract proj #1510 T550260Contract not subject to state pre-audit | SUNY - Upstate Medical University | Contract not subject to state pre-auditNot pre-audited | T550260 | Feb 1, 2019to Jan 30, 2022 | Feb 1, 2019 | Jan 30, 2022 | $243,554$243,554 spent | $243,554 | |
Consultant contract proj#15108 T550262Contract not subject to state pre-audit | SUNY - Upstate Medical University | Contract not subject to state pre-auditNot pre-audited | T550262 | Jan 30, 2019to Jul 30, 2021 | Jan 30, 2019 | Jul 30, 2021 | $228,306$228,306 spent | $228,306 | |
SUCF111017 Renovate Memorial T006376Contract not subject to state pre-audit | State University Construction Fund | Contract not subject to state pre-auditNot pre-audited | T006376 | Jan 19, 2018to Jul 1, 2025 | Jan 19, 2018 | Jul 1, 2025 | $2,817,184$2,817,184 spent | $2,817,184 |
Term agreement architectural services SUNY Cortland Cortland CountyCollege at CortlandMar 19, 2025 – Mar 18, 2028Active$700,000
- Description
- Term agreement architectural services SUNY Cortland Cortland County
- Contract number
- D000965
- Type
- Consultant: Architect, engineering and appraisal related servicesConsultant
- Agency
- College at Cortland
- Term
- Mar 19, 2025 → Mar 18, 20283 years
- Approved
- May 15, 2025
- Status
- Active
- Amount
- $700,000
- Spent to date
- $221,874 · 32% of the amount
SUCF151124 Renovate DLAR 4thState University Construction FundApr 26, 2021 – Jun 30, 2029Active$3,648,192
- Description
- SUCF151124 Renovate DLAR 4th
- Contract number
- T006609
- Type
- Contract not subject to state pre-auditNot pre-audited
- Term
- Apr 26, 2021 → Jun 30, 20298.2 years
- Approved
- May 3, 2021
- Status
- Active
- Amount
- $3,648,192
- Spent to date
- $2,618,614 · 72% of the amount
SUCF 80807 Architectural ServState University Construction FundSep 14, 2020 – Mar 5, 2027Active$5,000,000
- Description
- SUCF 80807 Architectural Serv
- Contract number
- T006584
- Type
- Contract not subject to state pre-auditNot pre-audited
- Term
- Sep 14, 2020 → Mar 5, 20276.5 years
- Approved
- Sep 22, 2020
- Status
- Active
- Amount
- $5,000,000
- Spent to date
- $290,841 · 6% of the amount
Consultant agreement design services Weiskotten Hall SUNY Upstate Medical UniversitySUNY - Upstate Medical UniversityMar 18, 2025 – Sep 9, 2026$188,682
- Description
- Consultant agreement design services Weiskotten Hall SUNY Upstate Medical University
- Contract number
- D550394
- Type
- Consultant: Architect, engineering and appraisal related servicesConsultant
- Term
- Mar 18, 2025 → Sep 9, 20261.5 years
- Approved
- Mar 18, 2025
- Status
- Ended
- Amount
- $188,682
- Spent to date
- $150,767 · 80% of the amount
Design consultant project 1486SUNY - Upstate Medical UniversityAug 29, 2024 – Oct 16, 2025$88,806
- Description
- Design consultant project 1486
- Contract number
- T550382
- Type
- Contract not subject to state pre-auditNot pre-audited
- Term
- Aug 29, 2024 → Oct 16, 202514 months
- Approved
- Aug 28, 2024
- Status
- Ended
- Amount
- $88,806
- Spent to date
- $88,586 · 100% of the amount
Backdrop term agreement architectural design & study services SUNY CortlandCollege at CortlandNov 13, 2023 – Nov 12, 2026$700,000
- Description
- Backdrop term agreement architectural design & study services SUNY Cortland
- Contract number
- D000906
- Type
- Consultant: Architect, engineering and appraisal related servicesConsultant
- Agency
- College at Cortland
- Term
- Nov 13, 2023 → Nov 12, 20263 years
- Approved
- Mar 1, 2024
- Status
- Ended
- Amount
- $700,000
- Spent to date
- $636,353 · 91% of the amount
Project 151154 / 1418 uh 6w enSUNY - Upstate Medical UniversityNov 8, 2022 – May 21, 2024$104,741
- Description
- Project 151154 / 1418 uh 6w en
- Contract number
- T550344
- Type
- Contract not subject to state pre-auditNot pre-audited
- Term
- Nov 8, 2022 → May 21, 20241.5 years
- Approved
- Nov 14, 2022
- Status
- Ended
- Amount
- $104,741
- Spent to date
- $102,622 · 98% of the amount
Project 151152 / 1150 communitSUNY - Upstate Medical UniversitySep 28, 2022 – Aug 30, 2023$140,288
- Description
- Project 151152 / 1150 communit
- Contract number
- T550341
- Type
- Contract not subject to state pre-auditNot pre-audited
- Term
- Sep 28, 2022 → Aug 30, 202311 months
- Approved
- Oct 3, 2022
- Status
- Ended
- Amount
- $140,288
- Spent to date
- $140,288 · 100% of the amount
Project 151129 / 1352 uh 6w caSUNY - Upstate Medical UniversityJun 27, 2022 – Oct 30, 2024$71,329
- Description
- Project 151129 / 1352 uh 6w ca
- Contract number
- T550334
- Type
- Contract not subject to state pre-auditNot pre-audited
- Term
- Jun 27, 2022 → Oct 30, 20242.3 years
- Approved
- Jul 5, 2022
- Status
- Ended
- Amount
- $71,329
- Spent to date
- $71,329 · 100% of the amount
Locker room modifications- merCollege at GeneseoJul 21, 2021 – Aug 1, 2022$7,500
- Description
- Locker room modifications- mer
- Contract number
- T000228
- Type
- Contract not subject to state pre-auditNot pre-audited
- Agency
- College at Geneseo
- Term
- Jul 21, 2021 → Aug 1, 202212 months
- Approved
- Jul 26, 2021
- Status
- Ended
- Amount
- $7,500
- Spent to date
- $7,500 · 100% of the amount
Term consulting 2021 per propoCollege at MorrisvilleMar 26, 2021 – Mar 25, 2024$700,000
- Description
- Term consulting 2021 per propo
- Contract number
- T400467
- Type
- Contract not subject to state pre-auditNot pre-audited
- Agency
- College at Morrisville
- Term
- Mar 26, 2021 → Mar 25, 20243 years
- Approved
- Jun 3, 2021
- Status
- Ended
- Amount
- $700,000
- Spent to date
- $466,366 · 67% of the amount
Project 151106 / 1242 ucc CT rSUNY - Upstate Medical UniversityJan 15, 2021 – Oct 31, 2022$50,833
- Description
- Project 151106 / 1242 ucc CT r
- Contract number
- T550304
- Type
- Contract not subject to state pre-auditNot pre-audited
- Term
- Jan 15, 2021 → Oct 31, 20221.8 years
- Approved
- Jan 19, 2021
- Status
- Ended
- Amount
- $50,833
- Spent to date
- $49,909 · 98% of the amount
151067 / 1112.7 Uh fluoro roomSUNY - Upstate Medical UniversityNov 10, 2020 – May 31, 2022$46,866
- Description
- 151067 / 1112.7 Uh fluoro room
- Contract number
- T550295
- Type
- Contract not subject to state pre-auditNot pre-audited
- Term
- Nov 10, 2020 → May 31, 20221.6 years
- Approved
- Nov 10, 2020
- Status
- Ended
- Amount
- $46,866
- Spent to date
- $45,262 · 97% of the amount
Design seymour union ballroomCollege at BrockportMay 21, 2020 – Dec 31, 2023$281,178
- Description
- Design seymour union ballroom
- Contract number
- T191801
- Type
- Contract not subject to state pre-auditNot pre-audited
- Agency
- College at Brockport
- Term
- May 21, 2020 → Dec 31, 20233.6 years
- Approved
- Jun 2, 2020
- Status
- Ended
- Amount
- $281,178
- Spent to date
- $269,614 · 96% of the amount
Design for m09557 - replace doCollege at OneontaApr 27, 2020 – Feb 28, 2022$41,196
- Description
- Design for m09557 - replace do
- Contract number
- T110008
- Type
- Contract not subject to state pre-auditNot pre-audited
- Agency
- College at Oneonta
- Term
- Apr 27, 2020 → Feb 28, 20221.8 years
- Approved
- Apr 22, 2020
- Status
- Ended
- Amount
- $41,196
- Spent to date
- $41,196 · 100% of the amount
151030/1058 Ver 2 hyperbaric aSUNY - Upstate Medical UniversityJan 13, 2020 – Jan 30, 2025$390,032
- Description
- 151030/1058 Ver 2 hyperbaric a
- Contract number
- T550281
- Type
- Contract not subject to state pre-auditNot pre-audited
- Term
- Jan 13, 2020 → Jan 30, 20255.1 years
- Approved
- Jan 14, 2020
- Status
- Ended
- Amount
- $390,032
- Spent to date
- $390,032 · 100% of the amount
Park center athletic trainingCollege at CortlandDec 20, 2019 – Sep 1, 2022$98,624
- Description
- Park center athletic training
- Contract number
- T000762
- Type
- Contract not subject to state pre-auditNot pre-audited
- Agency
- College at Cortland
- Term
- Dec 20, 2019 → Sep 1, 20222.7 years
- Approved
- Jan 24, 2020
- Status
- Ended
- Amount
- $98,624
- Spent to date
- $98,624 · 100% of the amount
Consultant contract proj #1510SUNY - Upstate Medical UniversityFeb 1, 2019 – Jan 30, 2022$243,554
- Description
- Consultant contract proj #1510
- Contract number
- T550260
- Type
- Contract not subject to state pre-auditNot pre-audited
- Term
- Feb 1, 2019 → Jan 30, 20223 years
- Approved
- Feb 5, 2019
- Status
- Ended
- Amount
- $243,554
- Spent to date
- $243,554 · 100% of the amount
Consultant contract proj#15108SUNY - Upstate Medical UniversityJan 30, 2019 – Jul 30, 2021$228,306
- Description
- Consultant contract proj#15108
- Contract number
- T550262
- Type
- Contract not subject to state pre-auditNot pre-audited
- Term
- Jan 30, 2019 → Jul 30, 20212.5 years
- Approved
- Jan 31, 2019
- Status
- Ended
- Amount
- $228,306
- Spent to date
- $228,306 · 100% of the amount
SUCF111017 Renovate MemorialState University Construction FundJan 19, 2018 – Jul 1, 2025$2,817,184
- Description
- SUCF111017 Renovate Memorial
- Contract number
- T006376
- Type
- Contract not subject to state pre-auditNot pre-audited
- Term
- Jan 19, 2018 → Jul 1, 20257.4 years
- Approved
- Jan 25, 2018
- Status
- Ended
- Amount
- $2,817,184
- Spent to date
- $2,817,184 · 100% of the amount
Contract-type mix
Share of contract value by type
- Contract not subject to state pre-audit36 contracts$23.5M
- Consultant: Architect, engineering and appraisal related services4 contracts$2.9M
Contracts over time
Contracts started per year
View as table
| Year | Contracts |
|---|---|
| 2007: 1 contracts, $1.3M | 1 |
| 2008: 1 contracts, $641.1K | 1 |
| 2009: 1 contracts, $950.9K | 1 |
| 2010: 1 contracts, $2.4M | 1 |
| 2011: 2 contracts, $1.3M | 2 |
| 2012: 2 contracts, $543.3K | 2 |
| 2013: 0 contracts, $0.0 | 0 |
| 2014: 0 contracts, $0.0 | 0 |
| 2015: 2 contracts, $900.1K | 2 |
| 2016: 6 contracts, $2.4M | 6 |
| 2017: 1 contracts, $444.8K | 1 |
| 2018: 1 contracts, $2.8M | 1 |
| 2019: 3 contracts, $570.5K | 3 |
| 2020: 5 contracts, $5.8M | 5 |
| 2021: 4 contracts, $4.4M | 4 |
| 2022: 3 contracts, $316.4K | 3 |
| 2023: 1 contracts, $700.0K | 1 |
| 2024: 1 contracts, $88.8K | 1 |
| 2025: 2 contracts, $888.7K | 2 |
| 2026: 0 contracts, $0.0 | 0 |
How the Contractor Score adds up
Extensive (A, 94/100): 3 active contracts, $26M in contracts.
- Contract volume+13.4measured
$26M in current contract value across 40 contracts, more than 92% of scored contractors.
- Recent activity+13.9measured
3 active contracts today; the most recent was approved in May 2025.
- Agency breadth+13.3measured
Contracts with 13 different state agencies and facilities.
- Experience+3.0measured
First contract started in April 2003 (23 years of contract history).
- Contract-type mix+0.6measured
2 contract types; the largest group is contracts exempt from state pre-audit (89% of value). Goods and services contracts are 11% of the total.
- Spending vs. value−0.2measured
On 37 completed contracts with spending recorded, spending is 87% of the contract value. Spending below the full value is common (work can finish under budget) and isn't treated as a problem.
- Federal award history0.0unknown
No federal award history found. Scored as neutral.
- Federal registration0.0unknown
No federal contractor registration found. Scored as neutral.
50 + contributions = 94 (A, Extensive)Starts at 50. Bars: cool adds, warm subtracts.
Agencies served
Contract value with each agency or facility
- State University Construction Fund9 contracts$13.5M
- College at Cortland5 contracts$4.3M
- SUNY - Upstate Medical University14 contracts$2.5M
- Office of General Services - Design & Construction1 contract$1.3M
- College of Ceramics at Alfred University2 contracts$1.3M
- College at Buffalo1 contract$802.5K
- College of Environmental Science & Forestry1 contract$700.0K
- College at Morrisville1 contract$700.0K
- New York State Statutory College - Cornell University1 contract$565.3K
- College at Brockport1 contract$281.2K
- College at Oswego1 contract$268.0K
- College at Oneonta2 contracts$92.9K
And 1 more agencies in the contracts table.
Similar contractors
- A
C & S Engineers Inc
Syracuse, NYEngineering & Architecture
Since 199930 agencies
- Contract value
- $222.0M
- Contracts
- 138
- Active
- 35
- A
Architectural Resources DPC
Engineering & Architecture
Since 200518 agencies
- Contract value
- $132.5M
- Contracts
- 86
- Active
- 43
- A
Labella Associates DPC
Rochester, NYEngineering & Architecture
Since 199425 agencies
- Contract value
- $346.8M
- Contracts
- 134
- Active
- 51
- A
M E Engineering PC
Engineering & Architecture
Since 200316 agencies
- Contract value
- $61.9M
- Contracts
- 88
- Active
- 7
- A
Bell & Spina Architects - Engineers PC
Engineering & Architecture
Since 200814 agencies
- Contract value
- $74.9M
- Contracts
- 54
- Active
- 19
- A
Ramboll Americas Engineering Solutions Inc
Syracuse, NYEngineering & Architecture
Since 200417 agencies
- Contract value
- $179.8M
- Contracts
- 78
- Active
- 19
- More engineering & architecture contractors Ranked by contract value
Browse more
- State University Construction Fund contractors
- College at Cortland contractors
- SUNY - Upstate Medical University contractors
- Office of General Services - Design & Construction contractors
- Engineering & Architecture contractors
- Top contractors
- All contractors
Contract figures are public New York State contract records as of Nov 13, 2026: current contract amounts and spending to date as reported. Company details are shown when we can match this contractor to a registered business with confidence.
RFP Detector is an independent service and is not affiliated with any government agency. Scores are informational.