J D Taylor Construction Corp
BState contracts since 2010Updated Nov 13, 2026
J D Taylor Construction Corp holds 21 contracts worth $15.4M with 4 New York State agencies, most with College at Cortland; none active today. The first started in 2010.
- Total contract value
- $15.4M
- Current contract amounts
- Spent to date
- $7.1M
- 46% of contract value
- Active contracts
- 0
- None active today
- Contracts on record
- 21
- Since 2010
- Agencies served
- 4
- Most with College at Cortland
- Years active
- 16
- First contract 2010
Contact & company
Business information and how to reach the company.
Contracts
21 contracts with New York State agencies, active first. Open a row for the full record.
| Details | Contract | Type | Contract no. | Term | |||||
|---|---|---|---|---|---|---|---|---|---|
Construction term contract ca T000764Contract not subject to state pre-audit | College at Cortland | Contract not subject to state pre-auditNot pre-audited | T000764 | Mar 1, 2020to Feb 28, 2022 | Mar 1, 2020 | Feb 28, 2022 | $1,000,000$0 spent | $0 | |
Construction term contract ge T000775Contract not subject to state pre-audit | College at Cortland | Contract not subject to state pre-auditNot pre-audited | T000775 | Mar 1, 2020to Feb 28, 2022 | Mar 1, 2020 | Feb 28, 2022 | $1,000,000$18,443 spent | $18,443 | |
Construction term contract co T000767Contract not subject to state pre-audit | College at Cortland | Contract not subject to state pre-auditNot pre-audited | T000767 | Mar 1, 2020to Feb 28, 2022 | Mar 1, 2020 | Feb 28, 2022 | $1,000,000$0 spent | $0 | |
Higgins hall elevator rehabili T000723Contract not subject to state pre-audit | College at Cortland | Contract not subject to state pre-auditNot pre-audited | T000723 | Jan 18, 2018to Jul 31, 2019 | Jan 18, 2018 | Jul 31, 2019 | $442,565$442,565 spent | $442,565 | |
Rehabilitation of chemical sto T201607Contract not subject to state pre-audit | College of Environmental Science & Forestry | Contract not subject to state pre-auditNot pre-audited | T201607 | Jul 1, 2017to Jun 30, 2019 | Jul 1, 2017 | Jun 30, 2019 | $257,865$249,865 spent | $249,865 | |
Clark hall elevator replacemen T000711Contract not subject to state pre-audit | College at Cortland | Contract not subject to state pre-auditNot pre-audited | T000711 | Jun 22, 2017to Mar 31, 2018 | Jun 22, 2017 | Mar 31, 2018 | $553,540$0 spent | $0 | |
Clark hall elevator replacemen T000702Contract not subject to state pre-audit | College at Cortland | Contract not subject to state pre-auditNot pre-audited | T000702 | Apr 28, 2017to May 2, 2019 | Apr 28, 2017 | May 2, 2019 | $524,714$524,714 spent | $524,714 | |
Replace doors and windows, various locations, Onondaga County D45421CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D45421C | Mar 29, 2017to Dec 24, 2017 | Mar 29, 2017 | Dec 24, 2017 | $458,000$457,926 spent | $457,926 | |
Heiberg forest classroom reno T201504Contract not subject to state pre-audit | College of Environmental Science & Forestry | Contract not subject to state pre-auditNot pre-audited | T201504 | Jun 1, 2016to Sep 1, 2017 | Jun 1, 2016 | Sep 1, 2017 | $377,832$377,832 spent | $377,832 | |
Construction term contract- ge T000660Contract not subject to state pre-audit | College at Cortland | Contract not subject to state pre-auditNot pre-audited | T000660 | Mar 1, 2016to Feb 28, 2020 | Mar 1, 2016 | Feb 28, 2020 | $1,000,000$956,457 spent | $956,457 | |
Construction term contract- ge T000662Contract not subject to state pre-audit | College at Cortland | Contract not subject to state pre-auditNot pre-audited | T000662 | Mar 1, 2016to Feb 28, 2020 | Mar 1, 2016 | Feb 28, 2020 | $1,000,000$64,968 spent | $64,968 | |
Construction term contract- ca T000647Contract not subject to state pre-audit | College at Cortland | Contract not subject to state pre-auditNot pre-audited | T000647 | Mar 1, 2016to Feb 28, 2020 | Mar 1, 2016 | Feb 28, 2020 | $1,000,000$92,735 spent | $92,735 | |
GC main campus T201330Contract not subject to state pre-audit | College of Environmental Science & Forestry | Contract not subject to state pre-auditNot pre-audited | T201330 | Nov 14, 2013to Nov 14, 2017 | Nov 14, 2013 | Nov 14, 2017 | $1,000,000$698,218 spent | $698,218 | |
Neubig hall loading dock modif T000611Contract not subject to state pre-audit | College at Cortland | Contract not subject to state pre-auditNot pre-audited | T000611 | May 7, 2012to Dec 31, 2012 | May 7, 2012 | Dec 31, 2012 | $727,476$727,476 spent | $727,476 | |
Term contract - general contra T000590Contract not subject to state pre-audit | College at Cortland | Contract not subject to state pre-auditNot pre-audited | T000590 | Mar 1, 2012to Feb 28, 2016 | Mar 1, 2012 | Feb 28, 2016 | $1,300,000$1,254,065 spent | $1,254,065 | |
Term contract door and door ha T000582Contract not subject to state pre-audit | College at Cortland | Contract not subject to state pre-auditNot pre-audited | T000582 | Mar 1, 2012to Feb 28, 2016 | Mar 1, 2012 | Feb 28, 2016 | $1,000,000$0 spent | $0 | |
Term contract concrete/masonry T000578Contract not subject to state pre-audit | College at Cortland | Contract not subject to state pre-auditNot pre-audited | T000578 | Mar 1, 2012to Feb 28, 2016 | Mar 1, 2012 | Feb 28, 2016 | $1,000,000$326,209 spent | $326,209 | |
Term contract carpentry T000576Contract not subject to state pre-audit | College at Cortland | Contract not subject to state pre-auditNot pre-audited | T000576 | Mar 1, 2012to Feb 28, 2016 | Mar 1, 2012 | Feb 28, 2016 | $1,000,000$142,190 spent | $142,190 | |
Corey elevator upgrade project T000634Contract not subject to state pre-audit | College at Cortland | Contract not subject to state pre-auditNot pre-audited | T000634 | Mar 1, 2012to Mar 1, 2015 | Mar 1, 2012 | Mar 1, 2015 | $392,600$392,600 spent | $392,600 | |
Repair damaged concrete wall DOT reg 3 BLDG dewitt, onondaga county DQ1480CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DQ1480C | Oct 28, 2011to Oct 14, 2012 | Oct 28, 2011 | Oct 14, 2012 | $123,497$117,483 spent | $117,483 |
Construction term contract caCollege at CortlandMar 1, 2020 – Feb 28, 2022$1,000,000
- Description
- Construction term contract ca
- Contract number
- T000764
- Type
- Contract not subject to state pre-auditNot pre-audited
- Agency
- College at Cortland
- Term
- Mar 1, 2020 → Feb 28, 20222 years
- Approved
- Mar 3, 2020
- Status
- Ended
- Amount
- $1,000,000
- Spent to date
- $0 · 0% of the amount
Construction term contract geCollege at CortlandMar 1, 2020 – Feb 28, 2022$1,000,000
- Description
- Construction term contract ge
- Contract number
- T000775
- Type
- Contract not subject to state pre-auditNot pre-audited
- Agency
- College at Cortland
- Term
- Mar 1, 2020 → Feb 28, 20222 years
- Approved
- Mar 3, 2020
- Status
- Ended
- Amount
- $1,000,000
- Spent to date
- $18,443 · 2% of the amount
Construction term contract coCollege at CortlandMar 1, 2020 – Feb 28, 2022$1,000,000
- Description
- Construction term contract co
- Contract number
- T000767
- Type
- Contract not subject to state pre-auditNot pre-audited
- Agency
- College at Cortland
- Term
- Mar 1, 2020 → Feb 28, 20222 years
- Approved
- Mar 3, 2020
- Status
- Ended
- Amount
- $1,000,000
- Spent to date
- $0 · 0% of the amount
Higgins hall elevator rehabiliCollege at CortlandJan 18, 2018 – Jul 31, 2019$442,565
- Description
- Higgins hall elevator rehabili
- Contract number
- T000723
- Type
- Contract not subject to state pre-auditNot pre-audited
- Agency
- College at Cortland
- Term
- Jan 18, 2018 → Jul 31, 20191.5 years
- Approved
- Mar 3, 2018
- Status
- Ended
- Amount
- $442,565
- Spent to date
- $442,565 · 100% of the amount
Rehabilitation of chemical stoCollege of Environmental Science & ForestryJul 1, 2017 – Jun 30, 2019$257,865
- Description
- Rehabilitation of chemical sto
- Contract number
- T201607
- Type
- Contract not subject to state pre-auditNot pre-audited
- Term
- Jul 1, 2017 → Jun 30, 20192 years
- Approved
- Sep 1, 2017
- Status
- Ended
- Amount
- $257,865
- Spent to date
- $249,865 · 97% of the amount
Clark hall elevator replacemenCollege at CortlandJun 22, 2017 – Mar 31, 2018$553,540
- Description
- Clark hall elevator replacemen
- Contract number
- T000711
- Type
- Contract not subject to state pre-auditNot pre-audited
- Agency
- College at Cortland
- Term
- Jun 22, 2017 → Mar 31, 20189 months
- Approved
- Jul 12, 2017
- Status
- Ended
- Amount
- $553,540
- Spent to date
- $0 · 0% of the amount
Clark hall elevator replacemenCollege at CortlandApr 28, 2017 – May 2, 2019$524,714
- Description
- Clark hall elevator replacemen
- Contract number
- T000702
- Type
- Contract not subject to state pre-auditNot pre-audited
- Agency
- College at Cortland
- Term
- Apr 28, 2017 → May 2, 20192 years
- Approved
- Jul 20, 2017
- Status
- Ended
- Amount
- $524,714
- Spent to date
- $524,714 · 100% of the amount
Replace doors and windows, various locations, Onondaga CountyOffice of General Services - Design & ConstructionMar 29, 2017 – Dec 24, 2017$458,000
- Description
- Replace doors and windows, various locations, Onondaga County
- Contract number
- D45421C
- Type
- Construction: BuildingConstruction
- Term
- Mar 29, 2017 → Dec 24, 20179 months
- Approved
- Mar 29, 2017
- Status
- Ended
- Amount
- $458,000
- Spent to date
- $457,926 · 100% of the amount
Heiberg forest classroom renoCollege of Environmental Science & ForestryJun 1, 2016 – Sep 1, 2017$377,832
- Description
- Heiberg forest classroom reno
- Contract number
- T201504
- Type
- Contract not subject to state pre-auditNot pre-audited
- Term
- Jun 1, 2016 → Sep 1, 201715 months
- Approved
- Jul 19, 2016
- Status
- Ended
- Amount
- $377,832
- Spent to date
- $377,832 · 100% of the amount
Construction term contract- geCollege at CortlandMar 1, 2016 – Feb 28, 2020$1,000,000
- Description
- Construction term contract- ge
- Contract number
- T000660
- Type
- Contract not subject to state pre-auditNot pre-audited
- Agency
- College at Cortland
- Term
- Mar 1, 2016 → Feb 28, 20204 years
- Approved
- Mar 5, 2016
- Status
- Ended
- Amount
- $1,000,000
- Spent to date
- $956,457 · 96% of the amount
Construction term contract- geCollege at CortlandMar 1, 2016 – Feb 28, 2020$1,000,000
- Description
- Construction term contract- ge
- Contract number
- T000662
- Type
- Contract not subject to state pre-auditNot pre-audited
- Agency
- College at Cortland
- Term
- Mar 1, 2016 → Feb 28, 20204 years
- Approved
- Mar 5, 2016
- Status
- Ended
- Amount
- $1,000,000
- Spent to date
- $64,968 · 6% of the amount
Construction term contract- caCollege at CortlandMar 1, 2016 – Feb 28, 2020$1,000,000
- Description
- Construction term contract- ca
- Contract number
- T000647
- Type
- Contract not subject to state pre-auditNot pre-audited
- Agency
- College at Cortland
- Term
- Mar 1, 2016 → Feb 28, 20204 years
- Approved
- Mar 4, 2016
- Status
- Ended
- Amount
- $1,000,000
- Spent to date
- $92,735 · 9% of the amount
GC main campusCollege of Environmental Science & ForestryNov 14, 2013 – Nov 14, 2017$1,000,000
- Description
- GC main campus
- Contract number
- T201330
- Type
- Contract not subject to state pre-auditNot pre-audited
- Term
- Nov 14, 2013 → Nov 14, 20174 years
- Approved
- Feb 25, 2014
- Status
- Ended
- Amount
- $1,000,000
- Spent to date
- $698,218 · 70% of the amount
Neubig hall loading dock modifCollege at CortlandMay 7, 2012 – Dec 31, 2012$727,476
- Description
- Neubig hall loading dock modif
- Contract number
- T000611
- Type
- Contract not subject to state pre-auditNot pre-audited
- Agency
- College at Cortland
- Term
- May 7, 2012 → Dec 31, 20128 months
- Approved
- Jul 25, 2012
- Status
- Ended
- Amount
- $727,476
- Spent to date
- $727,476 · 100% of the amount
Term contract - general contraCollege at CortlandMar 1, 2012 – Feb 28, 2016$1,300,000
- Description
- Term contract - general contra
- Contract number
- T000590
- Type
- Contract not subject to state pre-auditNot pre-audited
- Agency
- College at Cortland
- Term
- Mar 1, 2012 → Feb 28, 20164 years
- Approved
- May 19, 2012
- Status
- Ended
- Amount
- $1,300,000
- Spent to date
- $1,254,065 · 96% of the amount
Term contract door and door haCollege at CortlandMar 1, 2012 – Feb 28, 2016$1,000,000
- Description
- Term contract door and door ha
- Contract number
- T000582
- Type
- Contract not subject to state pre-auditNot pre-audited
- Agency
- College at Cortland
- Term
- Mar 1, 2012 → Feb 28, 20164 years
- Approved
- Feb 10, 2015
- Status
- Ended
- Amount
- $1,000,000
- Spent to date
- $0 · 0% of the amount
Term contract concrete/masonryCollege at CortlandMar 1, 2012 – Feb 28, 2016$1,000,000
- Description
- Term contract concrete/masonry
- Contract number
- T000578
- Type
- Contract not subject to state pre-auditNot pre-audited
- Agency
- College at Cortland
- Term
- Mar 1, 2012 → Feb 28, 20164 years
- Approved
- Dec 16, 2014
- Status
- Ended
- Amount
- $1,000,000
- Spent to date
- $326,209 · 33% of the amount
Term contract carpentryCollege at CortlandMar 1, 2012 – Feb 28, 2016$1,000,000
- Description
- Term contract carpentry
- Contract number
- T000576
- Type
- Contract not subject to state pre-auditNot pre-audited
- Agency
- College at Cortland
- Term
- Mar 1, 2012 → Feb 28, 20164 years
- Approved
- Sep 26, 2014
- Status
- Ended
- Amount
- $1,000,000
- Spent to date
- $142,190 · 14% of the amount
Corey elevator upgrade projectCollege at CortlandMar 1, 2012 – Mar 1, 2015$392,600
- Description
- Corey elevator upgrade project
- Contract number
- T000634
- Type
- Contract not subject to state pre-auditNot pre-audited
- Agency
- College at Cortland
- Term
- Mar 1, 2012 → Mar 1, 20153 years
- Approved
- Aug 28, 2014
- Status
- Ended
- Amount
- $392,600
- Spent to date
- $392,600 · 100% of the amount
Repair damaged concrete wall DOT reg 3 BLDG dewitt, onondaga countyOffice of General Services - Design & ConstructionOct 28, 2011 – Oct 14, 2012$123,497
- Description
- Repair damaged concrete wall DOT reg 3 BLDG dewitt, onondaga county
- Contract number
- DQ1480C
- Type
- Construction: BuildingConstruction
- Term
- Oct 28, 2011 → Oct 14, 201212 months
- Approved
- Oct 28, 2011
- Status
- Ended
- Amount
- $123,497
- Spent to date
- $117,483 · 95% of the amount
Contract-type mix
Share of contract value by type
- Contract not subject to state pre-audit19 contracts$14.8M
- Construction: Building2 contracts$581.5K
Contracts over time
Contracts started per year
View as table
| Year | Contracts |
|---|---|
| 2010: 1 contracts, $224.6K | 1 |
| 2011: 1 contracts, $123.5K | 1 |
| 2012: 6 contracts, $5.4M | 6 |
| 2013: 1 contracts, $1.0M | 1 |
| 2014: 0 contracts, $0.0 | 0 |
| 2015: 0 contracts, $0.0 | 0 |
| 2016: 4 contracts, $3.4M | 4 |
| 2017: 4 contracts, $1.8M | 4 |
| 2018: 1 contracts, $442.6K | 1 |
| 2019: 0 contracts, $0.0 | 0 |
| 2020: 3 contracts, $3.0M | 3 |
| 2021: 0 contracts, $0.0 | 0 |
| 2022: 0 contracts, $0.0 | 0 |
| 2023: 0 contracts, $0.0 | 0 |
| 2024: 0 contracts, $0.0 | 0 |
| 2025: 0 contracts, $0.0 | 0 |
| 2026: 0 contracts, $0.0 | 0 |
How the Contractor Score adds up
Established (B, 69/100): $15M in contracts, works with 4 agencies.
- Contract volume+11.7measured
$15M in current contract value across 21 contracts, more than 88% of scored contractors.
- Recent activity−2.0measured
No active contracts today; the most recent was approved in March 2020.
- Agency breadth+8.3measured
Contracts with 4 different state agencies and facilities.
- Experience+1.3measured
First contract started in October 2010 (16 years of contract history).
- Contract-type mix+0.2measured
2 contract types; the largest group is contracts exempt from state pre-audit (96% of value). Goods and services contracts are 4% of the total.
- Spending vs. value−0.9measured
On 17 completed contracts with spending recorded, spending is 60% of the contract value. Spending below the full value is common (work can finish under budget) and isn't treated as a problem.
- Federal award history0.0unknown
No federal award history found. Scored as neutral.
- Federal registration0.0unknown
No federal contractor registration found. Scored as neutral.
50 + contributions = 69 (B, Established)Starts at 50. Bars: cool adds, warm subtracts.
Agencies served
Contract value with each agency or facility
Similar contractors
- A
Bellows Const Spec LLC
Construction & Renovation
Since 20096 agencies
- Contract value
- $19.9M
- Contracts
- 32
- Active
- 5
- A
Diamond Roofing LLC
Construction & Renovation
Since 20097 agencies
- Contract value
- $20.0M
- Contracts
- 36
- Active
- 2
- A
Patricia Electric Inc
Syracuse, NYConstruction & Renovation
Since 20088 agencies
- Contract value
- $35.2M
- Contracts
- 29
- Active
- 2
- A
G M Crisalli & Associates Inc
Syracuse, NYConstruction & Renovation
Since 20136 agencies
- Contract value
- $41.3M
- Contracts
- 18
- Active
- 3
- A
Wilkins Mechanical Inc
Construction & Renovation
Since 200810 agencies
- Contract value
- $67.9M
- Contracts
- 125
- Active
- 0
- A
Titan Roofing Inc
Construction & Renovation
Since 200816 agencies
- Contract value
- $137.7M
- Contracts
- 128
- Active
- 7
- More construction & renovation contractors Ranked by contract value
Browse more
- College at Cortland contractors
- College of Environmental Science & Forestry contractors
- Office of General Services - Design & Construction contractors
- SUNY - Upstate Medical University contractors
- Construction & Renovation contractors
- Top contractors
- All contractors
Contract figures are public New York State contract records as of Nov 13, 2026: current contract amounts and spending to date as reported. Company details are shown when we can match this contractor to a registered business with confidence.
RFP Detector is an independent service and is not affiliated with any government agency. Scores are informational.