Jos A Sanders & Sons Inc
AState contracts since 2009Updated Nov 13, 2026
Jos A Sanders & Sons Inc holds 32 contracts worth $13.3M with 6 New York State agencies, most with Office of General Services - Design & Construction; 2 active today. The first started in 2009.
- Total contract value
- $13.3M
- Current contract amounts
- Spent to date
- $8.3M
- 62% of contract value
- Active contracts
- 2
- $3.3M in active value
- Contracts on record
- 32
- Since 2009
- Agencies served
- 6
- Most with Office of General Services - Design & Construction
- Years active
- 17
- First contract 2009
Contact & company
Business information and how to reach the company.
Phone
Address
Leadership
Wendy Sanders
President
Contracts
32 contracts with New York State agencies, active first. Open a row for the full record.
| Details | Contract | Type | Contract no. | Term | |||||
|---|---|---|---|---|---|---|---|---|---|
Replace roof New York State Police Olean Western Satellite Crime Lab in Cattaraugus County DEF623TConstruction: BuildingActive | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEF623T | Sep 30, 2026to Jan 28, 2027 | Sep 30, 2026 | Jan 28, 2027 | $300,000$0 spent | $0 | |
Replace roof of Goodyear Dining Hall University at SUNY Buffalo in Erie County D007054Construction: BuildingActive | State University Construction Fund | Construction: BuildingConstruction | D007054 | Apr 8, 2026to Nov 28, 2028 | Apr 8, 2026 | Nov 28, 2028 | $2,982,534$1,103,603 spent | $1,103,603 | |
Repair roof leaks Buffalo Armory Erie County DEF350TConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEF350T | Mar 26, 2025to Jan 31, 2026 | Mar 26, 2025 | Jan 31, 2026 | $300,000$108,727 spent | $108,727 | |
Repair Roof Bldg 87 Groveland CF in Livingston County DEF049TConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEF049T | Aug 18, 2023to Dec 31, 2024 | Aug 18, 2023 | Dec 31, 2024 | $300,000$109,688 spent | $109,688 | |
Repair damaged roof at Buffalo Armory Erie County DEE986TConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEE986T | Apr 28, 2023to Aug 26, 2023 | Apr 28, 2023 | Aug 26, 2023 | $200,000$53,494 spent | $53,494 | |
M03603-minor roof repairs vari T220002Contract not subject to state pre-audit | College at Buffalo | Contract not subject to state pre-auditNot pre-audited | T220002 | Apr 22, 2022to Apr 21, 2023 | Apr 22, 2022 | Apr 21, 2023 | $29,097$29,097 spent | $29,097 | |
Repair roof damage, Blds 19,23,25,26 Albion CF Orleans County DEE800TConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEE800T | Mar 28, 2022to Sep 24, 2022 | Mar 28, 2022 | Sep 24, 2022 | $300,000$110,895 spent | $110,895 | |
Roof repair Bldg 37 Wende CF Erie County DEE440TConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEE440T | Oct 5, 2020to Apr 3, 2021 | Oct 5, 2020 | Apr 3, 2021 | $200,000$92,269 spent | $92,269 | |
Repair wind damaged roof Buffalo Armory Masten Erie County DEE441TConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEE441T | Oct 2, 2020to Nov 15, 2021 | Oct 2, 2020 | Nov 15, 2021 | $300,000$239,149 spent | $239,149 | |
Partial roof replacements cape T500126Contract not subject to state pre-audit | SUNY at Buffalo | Contract not subject to state pre-auditNot pre-audited | T500126 | Jul 29, 2019to May 1, 2020 | Jul 29, 2019 | May 1, 2020 | $764,751$764,751 spent | $764,751 | |
Project # 051013 - marvel thea T000329Contract not subject to state pre-audit | College at Fredonia | Contract not subject to state pre-auditNot pre-audited | T000329 | Mar 5, 2019to Aug 16, 2019 | Mar 5, 2019 | Aug 16, 2019 | $496,609$496,609 spent | $496,609 | |
Repair Roof of Trolly Shop OPR Niagara Region Niagara County DEE050TConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEE050T | Feb 26, 2019to Jun 26, 2019 | Feb 26, 2019 | Jun 26, 2019 | $300,000$72,609 spent | $72,609 | |
Repair Leaking Roof Bldg. 132 Attica CF Wyoming County DED910TConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DED910T | Sep 12, 2018to Mar 11, 2019 | Sep 12, 2018 | Mar 11, 2019 | $300,000$15,972 spent | $15,972 | |
Repair/Replace Damaged Roof Membrane W Seneca DDSO Erie County DED819TConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DED819T | May 9, 2018to Nov 5, 2018 | May 9, 2018 | Nov 5, 2018 | $300,000$75,148 spent | $75,148 | |
Replace Roof State Armory Jamestown Chautauqua County DQ1745CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DQ1745C | Mar 22, 2018to Oct 25, 2019 | Mar 22, 2018 | Oct 25, 2019 | $1,392,463$1,358,300 spent | $1,358,300 | |
Repair Roofs, Buildings 12, 87 & 132 @ Attica CF, Wyoming County, Region 7 DED302TConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DED302T | Sep 21, 2016to Jul 30, 2017 | Sep 21, 2016 | Jul 30, 2017 | $300,000$92,794 spent | $92,794 | |
Quaker museum roof replacement, allegany SP, cattaraugus co D004750Construction: Building | Office of Parks Recreation & Historic Preservation | Construction: BuildingConstruction | D004750 | Jan 8, 2016to May 27, 2016 | Jan 8, 2016 | May 27, 2016 | $209,807$209,807 spent | $209,807 | |
Repair Standing Seam Roofs, Buildings 8, 11, 12, 14, Wyoming CF DEC887TConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEC887T | Mar 16, 2015to Mar 15, 2016 | Mar 16, 2015 | Mar 15, 2016 | $300,000$143,148 spent | $143,148 | |
Investigate & Correct Leaks, Main Entrance, Building 703, South Beach PC DEC846TConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEC846T | Feb 12, 2015to Jun 12, 2015 | Feb 12, 2015 | Jun 12, 2015 | $100,000$6,166 spent | $6,166 | |
Roofing system repair services T000555Contract not subject to state pre-audit | SUNY at Buffalo | Contract not subject to state pre-auditNot pre-audited | T000555 | Jun 2, 2014to Jun 1, 2017 | Jun 2, 2014 | Jun 1, 2017 | $200,000$26,504 spent | $26,504 |
Replace roof New York State Police Olean Western Satellite Crime Lab in Cattaraugus CountyOffice of General Services - Design & ConstructionSep 30, 2026 – Jan 28, 2027Active$300,000
- Description
- Replace roof New York State Police Olean Western Satellite Crime Lab in Cattaraugus County
- Contract number
- DEF623T
- Type
- Construction: BuildingConstruction
- Term
- Sep 30, 2026 → Jan 28, 20274 months
- Approved
- Oct 21, 2026
- Status
- Active
- Amount
- $300,000
- Spent to date
- $0 · 0% of the amount
Replace roof of Goodyear Dining Hall University at SUNY Buffalo in Erie CountyState University Construction FundApr 8, 2026 – Nov 28, 2028Active$2,982,534
- Description
- Replace roof of Goodyear Dining Hall University at SUNY Buffalo in Erie County
- Contract number
- D007054
- Type
- Construction: BuildingConstruction
- Term
- Apr 8, 2026 → Nov 28, 20282.7 years
- Approved
- Apr 4, 2026
- Status
- Active
- Amount
- $2,982,534
- Spent to date
- $1,103,603 · 37% of the amount
Repair roof leaks Buffalo Armory Erie CountyOffice of General Services - Design & ConstructionMar 26, 2025 – Jan 31, 2026$300,000
- Description
- Repair roof leaks Buffalo Armory Erie County
- Contract number
- DEF350T
- Type
- Construction: BuildingConstruction
- Term
- Mar 26, 2025 → Jan 31, 202610 months
- Approved
- Apr 11, 2025
- Status
- Ended
- Amount
- $300,000
- Spent to date
- $108,727 · 36% of the amount
Repair Roof Bldg 87 Groveland CF in Livingston CountyOffice of General Services - Design & ConstructionAug 18, 2023 – Dec 31, 2024$300,000
- Description
- Repair Roof Bldg 87 Groveland CF in Livingston County
- Contract number
- DEF049T
- Type
- Construction: BuildingConstruction
- Term
- Aug 18, 2023 → Dec 31, 202416 months
- Approved
- Sep 18, 2023
- Status
- Ended
- Amount
- $300,000
- Spent to date
- $109,688 · 37% of the amount
Repair damaged roof at Buffalo Armory Erie CountyOffice of General Services - Design & ConstructionApr 28, 2023 – Aug 26, 2023$200,000
- Description
- Repair damaged roof at Buffalo Armory Erie County
- Contract number
- DEE986T
- Type
- Construction: BuildingConstruction
- Term
- Apr 28, 2023 → Aug 26, 20234 months
- Approved
- May 18, 2023
- Status
- Ended
- Amount
- $200,000
- Spent to date
- $53,494 · 27% of the amount
M03603-minor roof repairs variCollege at BuffaloApr 22, 2022 – Apr 21, 2023$29,097
- Description
- M03603-minor roof repairs vari
- Contract number
- T220002
- Type
- Contract not subject to state pre-auditNot pre-audited
- Agency
- College at Buffalo
- Term
- Apr 22, 2022 → Apr 21, 202312 months
- Approved
- Apr 22, 2022
- Status
- Ended
- Amount
- $29,097
- Spent to date
- $29,097 · 100% of the amount
Repair roof damage, Blds 19,23,25,26 Albion CF Orleans CountyOffice of General Services - Design & ConstructionMar 28, 2022 – Sep 24, 2022$300,000
- Description
- Repair roof damage, Blds 19,23,25,26 Albion CF Orleans County
- Contract number
- DEE800T
- Type
- Construction: BuildingConstruction
- Term
- Mar 28, 2022 → Sep 24, 20226 months
- Approved
- Apr 22, 2022
- Status
- Ended
- Amount
- $300,000
- Spent to date
- $110,895 · 37% of the amount
Roof repair Bldg 37 Wende CF Erie CountyOffice of General Services - Design & ConstructionOct 5, 2020 – Apr 3, 2021$200,000
- Description
- Roof repair Bldg 37 Wende CF Erie County
- Contract number
- DEE440T
- Type
- Construction: BuildingConstruction
- Term
- Oct 5, 2020 → Apr 3, 20216 months
- Approved
- Dec 11, 2020
- Status
- Ended
- Amount
- $200,000
- Spent to date
- $92,269 · 46% of the amount
Repair wind damaged roof Buffalo Armory Masten Erie CountyOffice of General Services - Design & ConstructionOct 2, 2020 – Nov 15, 2021$300,000
- Description
- Repair wind damaged roof Buffalo Armory Masten Erie County
- Contract number
- DEE441T
- Type
- Construction: BuildingConstruction
- Term
- Oct 2, 2020 → Nov 15, 202113 months
- Approved
- Dec 9, 2020
- Status
- Ended
- Amount
- $300,000
- Spent to date
- $239,149 · 80% of the amount
Partial roof replacements capeSUNY at BuffaloJul 29, 2019 – May 1, 2020$764,751
- Description
- Partial roof replacements cape
- Contract number
- T500126
- Type
- Contract not subject to state pre-auditNot pre-audited
- Agency
- SUNY at Buffalo
- Term
- Jul 29, 2019 → May 1, 20209 months
- Approved
- Aug 16, 2019
- Status
- Ended
- Amount
- $764,751
- Spent to date
- $764,751 · 100% of the amount
Project # 051013 - marvel theaCollege at FredoniaMar 5, 2019 – Aug 16, 2019$496,609
- Description
- Project # 051013 - marvel thea
- Contract number
- T000329
- Type
- Contract not subject to state pre-auditNot pre-audited
- Agency
- College at Fredonia
- Term
- Mar 5, 2019 → Aug 16, 20195 months
- Approved
- Mar 6, 2019
- Status
- Ended
- Amount
- $496,609
- Spent to date
- $496,609 · 100% of the amount
Repair Roof of Trolly Shop OPR Niagara Region Niagara CountyOffice of General Services - Design & ConstructionFeb 26, 2019 – Jun 26, 2019$300,000
- Description
- Repair Roof of Trolly Shop OPR Niagara Region Niagara County
- Contract number
- DEE050T
- Type
- Construction: BuildingConstruction
- Term
- Feb 26, 2019 → Jun 26, 20194 months
- Approved
- Apr 22, 2019
- Status
- Ended
- Amount
- $300,000
- Spent to date
- $72,609 · 24% of the amount
Repair Leaking Roof Bldg. 132 Attica CF Wyoming CountyOffice of General Services - Design & ConstructionSep 12, 2018 – Mar 11, 2019$300,000
- Description
- Repair Leaking Roof Bldg. 132 Attica CF Wyoming County
- Contract number
- DED910T
- Type
- Construction: BuildingConstruction
- Term
- Sep 12, 2018 → Mar 11, 20196 months
- Approved
- Oct 10, 2018
- Status
- Ended
- Amount
- $300,000
- Spent to date
- $15,972 · 5% of the amount
Repair/Replace Damaged Roof Membrane W Seneca DDSO Erie CountyOffice of General Services - Design & ConstructionMay 9, 2018 – Nov 5, 2018$300,000
- Description
- Repair/Replace Damaged Roof Membrane W Seneca DDSO Erie County
- Contract number
- DED819T
- Type
- Construction: BuildingConstruction
- Term
- May 9, 2018 → Nov 5, 20186 months
- Approved
- Aug 23, 2018
- Status
- Ended
- Amount
- $300,000
- Spent to date
- $75,148 · 25% of the amount
Replace Roof State Armory Jamestown Chautauqua CountyOffice of General Services - Design & ConstructionMar 22, 2018 – Oct 25, 2019$1,392,463
- Description
- Replace Roof State Armory Jamestown Chautauqua County
- Contract number
- DQ1745C
- Type
- Construction: BuildingConstruction
- Term
- Mar 22, 2018 → Oct 25, 20191.6 years
- Approved
- Mar 22, 2018
- Status
- Ended
- Amount
- $1,392,463
- Spent to date
- $1,358,300 · 98% of the amount
Repair Roofs, Buildings 12, 87 & 132 @ Attica CF, Wyoming County, Region 7Office of General Services - Design & ConstructionSep 21, 2016 – Jul 30, 2017$300,000
- Description
- Repair Roofs, Buildings 12, 87 & 132 @ Attica CF, Wyoming County, Region 7
- Contract number
- DED302T
- Type
- Construction: BuildingConstruction
- Term
- Sep 21, 2016 → Jul 30, 201710 months
- Approved
- Oct 7, 2016
- Status
- Ended
- Amount
- $300,000
- Spent to date
- $92,794 · 31% of the amount
Quaker museum roof replacement, allegany SP, cattaraugus coOffice of Parks Recreation & Historic PreservationJan 8, 2016 – May 27, 2016$209,807
- Description
- Quaker museum roof replacement, allegany SP, cattaraugus co
- Contract number
- D004750
- Type
- Construction: BuildingConstruction
- Term
- Jan 8, 2016 → May 27, 20165 months
- Approved
- Jan 8, 2016
- Status
- Ended
- Amount
- $209,807
- Spent to date
- $209,807 · 100% of the amount
Repair Standing Seam Roofs, Buildings 8, 11, 12, 14, Wyoming CFOffice of General Services - Design & ConstructionMar 16, 2015 – Mar 15, 2016$300,000
- Description
- Repair Standing Seam Roofs, Buildings 8, 11, 12, 14, Wyoming CF
- Contract number
- DEC887T
- Type
- Construction: BuildingConstruction
- Term
- Mar 16, 2015 → Mar 15, 201612 months
- Approved
- May 11, 2015
- Status
- Ended
- Amount
- $300,000
- Spent to date
- $143,148 · 48% of the amount
Investigate & Correct Leaks, Main Entrance, Building 703, South Beach PCOffice of General Services - Design & ConstructionFeb 12, 2015 – Jun 12, 2015$100,000
- Description
- Investigate & Correct Leaks, Main Entrance, Building 703, South Beach PC
- Contract number
- DEC846T
- Type
- Construction: BuildingConstruction
- Term
- Feb 12, 2015 → Jun 12, 20154 months
- Approved
- Mar 10, 2015
- Status
- Ended
- Amount
- $100,000
- Spent to date
- $6,166 · 6% of the amount
Roofing system repair servicesSUNY at BuffaloJun 2, 2014 – Jun 1, 2017$200,000
- Description
- Roofing system repair services
- Contract number
- T000555
- Type
- Contract not subject to state pre-auditNot pre-audited
- Agency
- SUNY at Buffalo
- Term
- Jun 2, 2014 → Jun 1, 20173 years
- Approved
- Jun 12, 2014
- Status
- Ended
- Amount
- $200,000
- Spent to date
- $26,504 · 13% of the amount
Contract-type mix
Share of contract value by type
- Construction: Building28 contracts$11.8M
- Contract not subject to state pre-audit4 contracts$1.5M
Contracts over time
Contracts started per year
View as table
| Year | Contracts |
|---|---|
| 2009: 1 contracts, $1.2M | 1 |
| 2010: 3 contracts, $833.7K | 3 |
| 2011: 4 contracts, $663.0K | 4 |
| 2012: 3 contracts, $714.0K | 3 |
| 2013: 1 contracts, $336.9K | 1 |
| 2014: 1 contracts, $200.0K | 1 |
| 2015: 2 contracts, $400.0K | 2 |
| 2016: 2 contracts, $509.8K | 2 |
| 2017: 0 contracts, $0.0 | 0 |
| 2018: 3 contracts, $2.0M | 3 |
| 2019: 3 contracts, $1.6M | 3 |
| 2020: 2 contracts, $500.0K | 2 |
| 2021: 0 contracts, $0.0 | 0 |
| 2022: 2 contracts, $329.1K | 2 |
| 2023: 2 contracts, $500.0K | 2 |
| 2024: 0 contracts, $0.0 | 0 |
| 2025: 1 contracts, $300.0K | 1 |
| 2026: 2 contracts, $3.3M | 2 |
How the Contractor Score adds up
Extensive (A, 92/100): 2 active contracts, $13M in contracts.
- Contract volume+11.2measured
$13M in current contract value across 32 contracts, more than 88% of scored contractors.
- Recent activity+14.9measured
2 active contracts today; the most recent was approved in October 2026.
- Agency breadth+10.3measured
Contracts with 6 different state agencies and facilities.
- Experience+1.7measured
First contract started in July 2009 (17 years of contract history).
- Contract-type mix+4.6measured
2 contract types; the largest group is construction (89% of value). Goods and services contracts are 89% of the total.
- Spending vs. value−0.6measured
On 30 completed contracts with spending recorded, spending is 72% of the contract value. Spending below the full value is common (work can finish under budget) and isn't treated as a problem.
- Federal award history0.0unknown
No federal award history found. Scored as neutral.
- Federal registration0.0unknown
No federal contractor registration found. Scored as neutral.
50 + contributions = 92 (A, Extensive)Starts at 50. Bars: cool adds, warm subtracts.
Agencies served
Contract value with each agency or facility
Similar contractors
- A
MLP Plumbing & Mechanical Inc
Construction & Renovation
Since 20086 agencies
- Contract value
- $25.8M
- Contracts
- 55
- Active
- 6
- A
John W Danforth Company
Tonawanda, NYConstruction & Renovation
Since 200722 agencies
- Contract value
- $97.0M
- Contracts
- 160
- Active
- 14
- A
Mark Cerrone Inc
Niagara Falls, NYConstruction & Renovation
Since 20099 agencies
- Contract value
- $193.8M
- Contracts
- 39
- Active
- 1
- A
Oconnell Electric Company Inc
Victor, NYConstruction & Renovation
Since 200052 agencies
- Contract value
- $251.8M
- Contracts
- 220
- Active
- 13
- A
Cir Electrical Construction Corporation
Grand Island, NYConstruction & Renovation
Since 20097 agencies
- Contract value
- $14.2M
- Contracts
- 30
- Active
- 2
- B
RB Mac Construction Co Inc
Construction & Renovation
Since 20105 agencies
- Contract value
- $16.1M
- Contracts
- 9
- Active
- 0
- More construction & renovation contractors Ranked by contract value
Browse more
- Office of General Services - Design & Construction contractors
- State University Construction Fund contractors
- SUNY at Buffalo contractors
- Office of Parks Recreation & Historic Preservation contractors
- Construction & Renovation contractors
- Top contractors
- All contractors
Contract figures are public New York State contract records as of Nov 13, 2026: current contract amounts and spending to date as reported. Company details are shown when we can match this contractor to a registered business with confidence.
RFP Detector is an independent service and is not affiliated with any government agency. Scores are informational.