Lechase Construction Services LLC
ARochester, NY State contracts since 2005Updated Nov 13, 2026
Lechase Construction Services LLC holds 142 contracts worth $698.8M with 22 New York State agencies, most with State University Construction Fund; 25 active today. The first started in 2005.
- Total contract value
- $698.8M
- Current contract amounts
- Spent to date
- $458.0M
- 66% of contract value
- Active contracts
- 25
- $196.9M in active value
- Contracts on record
- 142
- Since 2005
- Agencies served
- 22
- Most with State University Construction Fund
- Years active
- 21
- First contract 2005
Contact & company
Business information and how to reach the company.
Phone
Address
- Legal name
- Lechase Construction Services, LLCDoing business as Lechase Construction
- Identifiers
- UEI VJXCTLSEYPE4 · CAGE 0JLN7
- Federal registration
- Active · renews by Apr 2027
- In business since
- 1997
Industry codes (NAICS)
- 236220Commercial and Institutional Building Construction
- 236116New Multifamily Housing Construction (except For-Sale Builders)
- 236210Industrial Building Construction
- 237130Power and Communication Line and Related Structures Construction
- 238110Poured Concrete Foundation and Structure Contractors
- 238120Structural Steel and Precast Concrete Contractors
- 238130Framing Contractors
- 238140Masonry Contractors
- 238190Other Foundation, Structure, and Building Exterior Contractors
- 238350Finish Carpentry Contractors
- 238910Site Preparation Contractors
- 562910Remediation Services
Leadership
Kyle L. Sayers
President
Steve Bills
Tim Schirmer
Contracts
142 contracts with New York State agencies, active first. Open a row for the full record.
| Details | Contract | Type | Contract no. | Term | |||||
|---|---|---|---|---|---|---|---|---|---|
Replace windows at Wing Hall Wing Cornell University Tompkins County D016834Construction: BuildingActive | New York State Statutory College - Cornell University | Construction: BuildingConstruction | D016834 | Jul 30, 2026to Jul 29, 2028 | Jul 30, 2026 | Jul 29, 2028 | $539,000$111,899 spent | $111,899 | |
PA filed contract SUNY Albany Ryckman& Van Rensselaer Halls window replacements & asbestos abatement D000573Contract not subject to state pre-auditActive | Dormitory Authority of the State of New York | Contract not subject to state pre-auditNot pre-audited | D000573 | Jun 23, 2026to Jul 28, 2027 | Jun 23, 2026 | Jul 28, 2027 | $2,579,500$0 spent | $0 | |
Nelson A Rockefeller expansion at SUNY Binghamton in Broome County D200168Construction: BuildingActive | SUNY at Binghamton | Construction: BuildingConstruction | D200168 | May 14, 2026to Aug 4, 2028 | May 14, 2026 | Aug 4, 2028 | $5,195,000$1,452,349 spent | $1,452,349 | |
Front entrance renovation in Allegany County D002501Construction: BuildingActive | College of Technology at Alfred | Construction: BuildingConstruction | D002501 | Apr 23, 2026to Apr 22, 2027 | Apr 23, 2026 | Apr 22, 2027 | $121,500$0 spent | $0 | |
Replace fire pump at Ives Hall in Tompkins County D015764Construction: BuildingActive | New York State Statutory College - Cornell University | Construction: BuildingConstruction | D015764 | Mar 29, 2026to Nov 14, 2027 | Mar 29, 2026 | Nov 14, 2027 | $655,000$419,042 spent | $419,042 | |
Installation of temporary pool covering in Allegany County D002502Construction: BuildingActive | College of Technology at Alfred | Construction: BuildingConstruction | D002502 | Feb 24, 2026to Feb 23, 2027 | Feb 24, 2026 | Feb 23, 2027 | $172,000$158,650 spent | $158,650 | |
Site improvements at Mary Jemison Dining Hall in Livingston County D000263Construction: BuildingActive | College at Geneseo | Construction: BuildingConstruction | D000263 | Feb 2, 2026to Nov 16, 2026 | Feb 2, 2026 | Nov 16, 2026 | $428,973$428,973 spent | $428,973 | |
Tuttle North renovation for weight and team and locker rooms in Monroe County D241523Construction: BuildingActive | College at Brockport | Construction: BuildingConstruction | D241523 | Jan 23, 2026to Aug 13, 2027 | Jan 23, 2026 | Aug 13, 2027 | $6,737,000$1,827,374 spent | $1,827,374 | |
Renovation of Hartwell Hall at SUNY Brockport in Monroe County D007033Construction: BuildingActive | State University Construction Fund | Construction: BuildingConstruction | D007033 | Dec 2, 2025to Dec 1, 2028 | Dec 2, 2025 | Dec 1, 2028 | $8,938,027$2,490,151 spent | $2,490,151 | |
Campus relocation and renovation of swing space at SUNY Morrisville in Madison County D007028Construction: BuildingActive | State University Construction Fund | Construction: BuildingConstruction | D007028 | Oct 29, 2025to Jan 22, 2028 | Oct 29, 2025 | Jan 22, 2028 | $2,147,540$1,956,012 spent | $1,956,012 | |
Demolition and renovation phase II and III in the Science III building in Broome County D200121Construction: BuildingActive | SUNY at Binghamton | Construction: BuildingConstruction | D200121 | Jun 24, 2025to Jul 14, 2027 | Jun 24, 2025 | Jul 14, 2027 | $53,836,429$30,976,910 spent | $30,976,910 | |
Rehabilitation of Rice Hall in Tompkins County D015676Construction: BuildingActive | New York State Statutory College - Cornell University | Construction: BuildingConstruction | D015676 | Jun 22, 2025to Nov 4, 2027 | Jun 22, 2025 | Nov 4, 2027 | $24,073,162$12,490,305 spent | $12,490,305 | |
Renovation of Moore Hall at Buffalo State University in Erie County D006998Construction: BuildingActive | State University Construction Fund | Construction: BuildingConstruction | D006998 | Apr 29, 2025to Sep 16, 2028 | Apr 29, 2025 | Sep 16, 2028 | $20,644,749$14,378,573 spent | $14,378,573 | |
Rehabilitation for accessibility entry to Harder Hall at Alfred University in Allegany County D006997Construction: BuildingActive | State University Construction Fund | Construction: BuildingConstruction | D006997 | Apr 23, 2025to Jun 22, 2027 | Apr 23, 2025 | Jun 22, 2027 | $2,057,957$1,911,872 spent | $1,911,872 | |
Heating plant renovation in H. Carl McCall Building at Alfred University in Allegany County D006984Construction: BuildingActive | State University Construction Fund | Construction: BuildingConstruction | D006984 | Mar 10, 2025to Nov 25, 2027 | Mar 10, 2025 | Nov 25, 2027 | $9,919,177$8,681,691 spent | $8,681,691 | |
PA filed contract OMH Rochester Psychiatric Center Building 60 G2 forensic conversion D229454Contract not subject to state pre-auditActive | Dormitory Authority of the State of New York | Contract not subject to state pre-auditNot pre-audited | D229454 | Mar 4, 2025to Dec 18, 2026 | Mar 4, 2025 | Dec 18, 2026 | $2,097,000$0 spent | $0 | |
Renovation of Sturges Hall at SUNY Geneseo in Livingston county D006970Construction: BuildingActive | State University Construction Fund | Construction: BuildingConstruction | D006970 | Jan 16, 2025to May 14, 2028 | Jan 16, 2025 | May 14, 2028 | $28,439,650$23,310,361 spent | $23,310,361 | |
Roof replacements at Alfred State College in Allegany County D006955Construction: BuildingActive | State University Construction Fund | Construction: BuildingConstruction | D006955 | Oct 3, 2024to Aug 4, 2027 | Oct 3, 2024 | Aug 4, 2027 | $4,739,642$4,394,942 spent | $4,394,942 | |
Construction manager services for Netzer Hall renovations in Oswego County D006962Consultant: Construction related servicesActive | State University Construction Fund | Consultant: Construction related servicesConsultant | D006962 | Oct 1, 2024to Oct 1, 2029 | Oct 1, 2024 | Oct 1, 2029 | $3,150,262$66,814 spent | $66,814 | |
Construction manager for new building project at SUNY Buffalo in Erie county D006926Consultant: Construction related servicesActive | State University Construction Fund | Consultant: Construction related servicesConsultant | D006926 | May 28, 2024to May 28, 2029 | May 28, 2024 | May 28, 2029 | $4,288,694$897,948 spent | $897,948 |
Replace windows at Wing Hall Wing Cornell University Tompkins CountyNew York State Statutory College - Cornell UniversityJul 30, 2026 – Jul 29, 2028Active$539,000
- Description
- Replace windows at Wing Hall Wing Cornell University Tompkins County
- Contract number
- D016834
- Type
- Construction: BuildingConstruction
- Term
- Jul 30, 2026 → Jul 29, 20282 years
- Approved
- Jul 30, 2026
- Status
- Active
- Amount
- $539,000
- Spent to date
- $111,899 · 21% of the amount
PA filed contract SUNY Albany Ryckman& Van Rensselaer Halls window replacements & asbestos abatementDormitory Authority of the State of New YorkJun 23, 2026 – Jul 28, 2027Active$2,579,500
- Description
- PA filed contract SUNY Albany Ryckman& Van Rensselaer Halls window replacements & asbestos abatement
- Contract number
- D000573
- Type
- Contract not subject to state pre-auditNot pre-audited
- Term
- Jun 23, 2026 → Jul 28, 202713 months
- Approved
- Jul 6, 2026
- Status
- Active
- Amount
- $2,579,500
- Spent to date
- $0 · 0% of the amount
Nelson A Rockefeller expansion at SUNY Binghamton in Broome CountySUNY at BinghamtonMay 14, 2026 – Aug 4, 2028Active$5,195,000
- Description
- Nelson A Rockefeller expansion at SUNY Binghamton in Broome County
- Contract number
- D200168
- Type
- Construction: BuildingConstruction
- Agency
- SUNY at Binghamton
- Term
- May 14, 2026 → Aug 4, 20282.3 years
- Approved
- May 14, 2026
- Status
- Active
- Amount
- $5,195,000
- Spent to date
- $1,452,349 · 28% of the amount
Front entrance renovation in Allegany CountyCollege of Technology at AlfredApr 23, 2026 – Apr 22, 2027Active$121,500
- Description
- Front entrance renovation in Allegany County
- Contract number
- D002501
- Type
- Construction: BuildingConstruction
- Term
- Apr 23, 2026 → Apr 22, 202712 months
- Approved
- Apr 23, 2026
- Status
- Active
- Amount
- $121,500
- Spent to date
- $0 · 0% of the amount
Replace fire pump at Ives Hall in Tompkins CountyNew York State Statutory College - Cornell UniversityMar 29, 2026 – Nov 14, 2027Active$655,000
- Description
- Replace fire pump at Ives Hall in Tompkins County
- Contract number
- D015764
- Type
- Construction: BuildingConstruction
- Term
- Mar 29, 2026 → Nov 14, 20271.7 years
- Approved
- Mar 19, 2026
- Status
- Active
- Amount
- $655,000
- Spent to date
- $419,042 · 64% of the amount
Installation of temporary pool covering in Allegany CountyCollege of Technology at AlfredFeb 24, 2026 – Feb 23, 2027Active$172,000
- Description
- Installation of temporary pool covering in Allegany County
- Contract number
- D002502
- Type
- Construction: BuildingConstruction
- Term
- Feb 24, 2026 → Feb 23, 202712 months
- Approved
- Feb 24, 2026
- Status
- Active
- Amount
- $172,000
- Spent to date
- $158,650 · 92% of the amount
Site improvements at Mary Jemison Dining Hall in Livingston CountyCollege at GeneseoFeb 2, 2026 – Nov 16, 2026Active$428,973
- Description
- Site improvements at Mary Jemison Dining Hall in Livingston County
- Contract number
- D000263
- Type
- Construction: BuildingConstruction
- Agency
- College at Geneseo
- Term
- Feb 2, 2026 → Nov 16, 20269 months
- Approved
- Feb 2, 2026
- Status
- Active
- Amount
- $428,973
- Spent to date
- $428,973 · 100% of the amount
Tuttle North renovation for weight and team and locker rooms in Monroe CountyCollege at BrockportJan 23, 2026 – Aug 13, 2027Active$6,737,000
- Description
- Tuttle North renovation for weight and team and locker rooms in Monroe County
- Contract number
- D241523
- Type
- Construction: BuildingConstruction
- Agency
- College at Brockport
- Term
- Jan 23, 2026 → Aug 13, 20271.6 years
- Approved
- Feb 11, 2026
- Status
- Active
- Amount
- $6,737,000
- Spent to date
- $1,827,374 · 27% of the amount
Renovation of Hartwell Hall at SUNY Brockport in Monroe CountyState University Construction FundDec 2, 2025 – Dec 1, 2028Active$8,938,027
- Description
- Renovation of Hartwell Hall at SUNY Brockport in Monroe County
- Contract number
- D007033
- Type
- Construction: BuildingConstruction
- Term
- Dec 2, 2025 → Dec 1, 20283 years
- Approved
- Nov 28, 2025
- Status
- Active
- Amount
- $8,938,027
- Spent to date
- $2,490,151 · 28% of the amount
Campus relocation and renovation of swing space at SUNY Morrisville in Madison CountyState University Construction FundOct 29, 2025 – Jan 22, 2028Active$2,147,540
- Description
- Campus relocation and renovation of swing space at SUNY Morrisville in Madison County
- Contract number
- D007028
- Type
- Construction: BuildingConstruction
- Term
- Oct 29, 2025 → Jan 22, 20282.3 years
- Approved
- Oct 23, 2025
- Status
- Active
- Amount
- $2,147,540
- Spent to date
- $1,956,012 · 91% of the amount
Demolition and renovation phase II and III in the Science III building in Broome CountySUNY at BinghamtonJun 24, 2025 – Jul 14, 2027Active$53,836,429
- Description
- Demolition and renovation phase II and III in the Science III building in Broome County
- Contract number
- D200121
- Type
- Construction: BuildingConstruction
- Agency
- SUNY at Binghamton
- Term
- Jun 24, 2025 → Jul 14, 20272.1 years
- Approved
- Jun 25, 2025
- Status
- Active
- Amount
- $53,836,429
- Spent to date
- $30,976,910 · 58% of the amount
Rehabilitation of Rice Hall in Tompkins CountyNew York State Statutory College - Cornell UniversityJun 22, 2025 – Nov 4, 2027Active$24,073,162
- Description
- Rehabilitation of Rice Hall in Tompkins County
- Contract number
- D015676
- Type
- Construction: BuildingConstruction
- Term
- Jun 22, 2025 → Nov 4, 20272.3 years
- Approved
- Jun 12, 2025
- Status
- Active
- Amount
- $24,073,162
- Spent to date
- $12,490,305 · 52% of the amount
Renovation of Moore Hall at Buffalo State University in Erie CountyState University Construction FundApr 29, 2025 – Sep 16, 2028Active$20,644,749
- Description
- Renovation of Moore Hall at Buffalo State University in Erie County
- Contract number
- D006998
- Type
- Construction: BuildingConstruction
- Term
- Apr 29, 2025 → Sep 16, 20283.4 years
- Approved
- Apr 25, 2025
- Status
- Active
- Amount
- $20,644,749
- Spent to date
- $14,378,573 · 70% of the amount
Rehabilitation for accessibility entry to Harder Hall at Alfred University in Allegany CountyState University Construction FundApr 23, 2025 – Jun 22, 2027Active$2,057,957
- Description
- Rehabilitation for accessibility entry to Harder Hall at Alfred University in Allegany County
- Contract number
- D006997
- Type
- Construction: BuildingConstruction
- Term
- Apr 23, 2025 → Jun 22, 20272.2 years
- Approved
- Apr 21, 2025
- Status
- Active
- Amount
- $2,057,957
- Spent to date
- $1,911,872 · 93% of the amount
Heating plant renovation in H. Carl McCall Building at Alfred University in Allegany CountyState University Construction FundMar 10, 2025 – Nov 25, 2027Active$9,919,177
- Description
- Heating plant renovation in H. Carl McCall Building at Alfred University in Allegany County
- Contract number
- D006984
- Type
- Construction: BuildingConstruction
- Term
- Mar 10, 2025 → Nov 25, 20272.8 years
- Approved
- Mar 5, 2025
- Status
- Active
- Amount
- $9,919,177
- Spent to date
- $8,681,691 · 88% of the amount
PA filed contract OMH Rochester Psychiatric Center Building 60 G2 forensic conversionDormitory Authority of the State of New YorkMar 4, 2025 – Dec 18, 2026Active$2,097,000
- Description
- PA filed contract OMH Rochester Psychiatric Center Building 60 G2 forensic conversion
- Contract number
- D229454
- Type
- Contract not subject to state pre-auditNot pre-audited
- Term
- Mar 4, 2025 → Dec 18, 20261.8 years
- Approved
- Mar 5, 2025
- Status
- Active
- Amount
- $2,097,000
- Spent to date
- $0 · 0% of the amount
Renovation of Sturges Hall at SUNY Geneseo in Livingston countyState University Construction FundJan 16, 2025 – May 14, 2028Active$28,439,650
- Description
- Renovation of Sturges Hall at SUNY Geneseo in Livingston county
- Contract number
- D006970
- Type
- Construction: BuildingConstruction
- Term
- Jan 16, 2025 → May 14, 20283.3 years
- Approved
- Jan 13, 2025
- Status
- Active
- Amount
- $28,439,650
- Spent to date
- $23,310,361 · 82% of the amount
Roof replacements at Alfred State College in Allegany CountyState University Construction FundOct 3, 2024 – Aug 4, 2027Active$4,739,642
- Description
- Roof replacements at Alfred State College in Allegany County
- Contract number
- D006955
- Type
- Construction: BuildingConstruction
- Term
- Oct 3, 2024 → Aug 4, 20272.8 years
- Approved
- Oct 1, 2024
- Status
- Active
- Amount
- $4,739,642
- Spent to date
- $4,394,942 · 93% of the amount
Construction manager services for Netzer Hall renovations in Oswego CountyState University Construction FundOct 1, 2024 – Oct 1, 2029Active$3,150,262
- Description
- Construction manager services for Netzer Hall renovations in Oswego County
- Contract number
- D006962
- Type
- Consultant: Construction related servicesConsultant
- Term
- Oct 1, 2024 → Oct 1, 20295 years
- Approved
- Sep 26, 2024
- Status
- Active
- Amount
- $3,150,262
- Spent to date
- $66,814 · 2% of the amount
Construction manager for new building project at SUNY Buffalo in Erie countyState University Construction FundMay 28, 2024 – May 28, 2029Active$4,288,694
- Description
- Construction manager for new building project at SUNY Buffalo in Erie county
- Contract number
- D006926
- Type
- Consultant: Construction related servicesConsultant
- Term
- May 28, 2024 → May 28, 20295 years
- Approved
- May 24, 2024
- Status
- Active
- Amount
- $4,288,694
- Spent to date
- $897,948 · 21% of the amount
Contract-type mix
Share of contract value by type
- Construction56 contracts$368.0M
- Contract not subject to state pre-audit78 contracts$312.3M
- Consultant: Construction related services7 contracts$18.3M
- Service: Other / misc. services1 contract$150.0K
Contracts over time
Contracts started per year
View as table
| Year | Contracts |
|---|---|
| 2007: 1 contracts, $235.3K | 1 |
| 2008: 1 contracts, $1.2M | 1 |
| 2009: 5 contracts, $3.0M | 5 |
| 2010: 14 contracts, $46.4M | 14 |
| 2011: 10 contracts, $39.8M | 10 |
| 2012: 7 contracts, $37.6M | 7 |
| 2013: 4 contracts, $3.3M | 4 |
| 2014: 13 contracts, $42.8M | 13 |
| 2015: 11 contracts, $37.5M | 11 |
| 2016: 8 contracts, $20.6M | 8 |
| 2017: 5 contracts, $20.4M | 5 |
| 2018: 5 contracts, $2.2M | 5 |
| 2019: 6 contracts, $16.9M | 6 |
| 2020: 6 contracts, $56.1M | 6 |
| 2021: 9 contracts, $93.0M | 9 |
| 2022: 2 contracts, $47.8M | 2 |
| 2023: 3 contracts, $2.9M | 3 |
| 2024: 7 contracts, $41.6M | 7 |
| 2025: 14 contracts, $166.9M | 14 |
| 2026: 9 contracts, $16.7M | 9 |
How the Contractor Score adds up
Extensive (A, 100/100): $699M in contracts, 25 active contracts.
- Contract volume+21.8measured
$699M in current contract value across 142 contracts, more than 99% of scored contractors.
- Recent activity+21.1measured
25 active contracts today; the most recent was approved in July 2026.
- Agency breadth+14.7measured
Contracts with 22 different state agencies and facilities.
- Experience+2.8measured
First contract started in March 2005 (21 years of contract history).
- Contract-type mix+5.6measured
6 contract types; the largest group is construction (53% of value). Goods and services contracts are 55% of the total.
- Spending vs. value0.0measured
On 102 completed contracts with spending recorded, spending is 95% of the contract value. Spending below the full value is common (work can finish under budget) and isn't treated as a problem.
- Federal award history0.0unknown
No federal award history found. Scored as neutral.
- Federal registration+5.2measured
Registered to do business with the federal government (registration active).
50 + contributions = 121.2, capped at 100Starts at 50. Bars: cool adds, warm subtracts.
Agencies served
Contract value with each agency or facility
- State University Construction Fund46 contracts$275.3M
- SUNY at Binghamton10 contracts$144.7M
- Dormitory Authority of the State of New York6 contracts$67.9M
- New York State Statutory College - Cornell University10 contracts$52.0M
- New York State Olympic Regional Development Authority2 contracts$42.6M
- Office of General Services - Design & Construction22 contracts$22.4M
- SUNY at Buffalo2 contracts$17.7M
- Rochester-Genesee Regional Transportation Authority2 contracts$15.9M
- SUNY at Albany3 contracts$13.0M
- Capital District Transportation Authority2 contracts$12.7M
- College at Brockport6 contracts$10.1M
- SUNY - Upstate Medical University12 contracts$8.3M
And 10 more agencies in the contracts table.
Similar contractors
- A
Oconnell Electric Company Inc
Victor, NYConstruction & Renovation
Since 200052 agencies
- Contract value
- $251.8M
- Contracts
- 220
- Active
- 13
- A
Dormitory Authority State of New York
Albany, NYConstruction & Renovation
Since 201721 agencies
- Contract value
- $291.0M
- Contracts
- 158
- Active
- 35
- A
Postler & Jaeckle Corp
Rochester, NYConstruction & Renovation
Since 200819 agencies
- Contract value
- $56.7M
- Contracts
- 101
- Active
- 12
- A
Titan Roofing Inc
Construction & Renovation
Since 200816 agencies
- Contract value
- $137.7M
- Contracts
- 128
- Active
- 7
- A
John W Danforth Company
Tonawanda, NYConstruction & Renovation
Since 200722 agencies
- Contract value
- $97.0M
- Contracts
- 160
- Active
- 14
- A
Fahs Construction Group Inc
Binghamton, NYConstruction & Renovation
Since 200713 agencies
- Contract value
- $994.3M
- Contracts
- 100
- Active
- 12
- More construction & renovation contractors Ranked by contract value
Browse more
- State University Construction Fund contractors
- SUNY at Binghamton contractors
- Dormitory Authority of the State of New York contractors
- New York State Statutory College - Cornell University contractors
- Construction & Renovation contractors
- Top contractors
- All contractors
Contract figures are public New York State contract records as of Nov 13, 2026: current contract amounts and spending to date as reported. Company details are shown when we can match this contractor to a registered business with confidence.