LH Laplante Company Inc
AState contracts since 2009Updated Nov 13, 2026
LH Laplante Company Inc holds 68 contracts worth $43.4M with 6 New York State agencies, most with Office of General Services - Design & Construction; 4 active today. The first started in 2009.
- Total contract value
- $43.4M
- Current contract amounts
- Spent to date
- $34.4M
- 79% of contract value
- Active contracts
- 4
- $4.1M in active value
- Contracts on record
- 68
- Since 2009
- Agencies served
- 6
- Most with Office of General Services - Design & Construction
- Years active
- 17
- First contract 2009
Contact & company
Business information and how to reach the company.
Contracts
68 contracts with New York State agencies, active first. Open a row for the full record.
| Details | Contract | Type | Contract no. | Term | |||||
|---|---|---|---|---|---|---|---|---|---|
High Temperature Hot Water Priorities 1 & 4 at SUNY Plattsburg in Clinton County D000941Construction: BuildingActive | College at Plattsburgh | Construction: BuildingConstruction | D000941 | Sep 15, 2026to Aug 9, 2027 | Sep 15, 2026 | Aug 9, 2027 | $2,727,272$0 spent | $0 | |
Adirondack Fish Hatchery Brook Trout Expansion Pole Barn Town of Santa Clara in Franklin County D0000017Construction: BuildingActive | Department of Environmental Conservation | Construction: BuildingConstruction | D0000017 | Jun 23, 2026to Mar 31, 2027 | Jun 23, 2026 | Mar 31, 2027 | $59,500$0 spent | $0 | |
Repair steam lines at Clinton Correctional Facility in Clinton County DEF556HConstruction: BuildingActive | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEF556H | May 5, 2026to May 31, 2027 | May 5, 2026 | May 31, 2027 | $300,000$0 spent | $0 | |
Restore heating system Clinton Correctional Facility Clinton County DEF448HConstruction: BuildingActive | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEF448H | Oct 29, 2025to Mar 30, 2027 | Oct 29, 2025 | Mar 30, 2027 | $1,000,000$514,978 spent | $514,978 | |
Repair steam leaks Adirondack Correctional Facility Ray Brook Essex County DEF498HConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEF498H | Jan 29, 2026to May 29, 2026 | Jan 29, 2026 | May 29, 2026 | $150,000$57,212 spent | $57,212 | |
Repair water line leaks a nd restore damage Clinton Correctional Facility Clinton County DEF482PConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEF482P | Dec 11, 2025to Apr 10, 2026 | Dec 11, 2025 | Apr 10, 2026 | $300,000$29,870 spent | $29,870 | |
Infirmary HVAC replacement in Clinton County D000893Construction: Building | College at Plattsburgh | Construction: BuildingConstruction | D000893 | Nov 14, 2025to Jan 9, 2026 | Nov 14, 2025 | Jan 9, 2026 | $595,000$0 spent | $0 | |
Emergency hot water pipe repair in Clinton County D000917Construction: Miscellaneous | College at Plattsburgh | Construction: MiscellaneousConstruction | D000917 | Sep 23, 2025to Oct 6, 2025 | Sep 23, 2025 | Oct 6, 2025 | $104,759$104,759 spent | $104,759 | |
Repair freezer failure Adirondack Correctional Facility Essex County DEF408HConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEF408H | Jun 30, 2025to Mar 31, 2026 | Jun 30, 2025 | Mar 31, 2026 | $150,000$51,593 spent | $51,593 | |
Repair steam leak Building 1 Adirondack Correctional facility Essex County DEF371HConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEF371H | May 12, 2025to Oct 23, 2025 | May 12, 2025 | Oct 23, 2025 | $75,000$20,155 spent | $20,155 | |
Replace boiler at Valcour Comfort Station DOT Region 7 in Clinton County D47647HConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D47647H | May 5, 2025to May 31, 2026 | May 5, 2025 | May 31, 2026 | $483,500$466,692 spent | $466,692 | |
Replace hot water storage tank in Building 8 at Washington Correctional Facility in Washington Co DQ1890PConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DQ1890P | Mar 5, 2025to Jan 5, 2026 | Mar 5, 2025 | Jan 5, 2026 | $270,000$246,600 spent | $246,600 | |
Repair hot water line Altona Correctional Facility Clinton County DEF327HConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEF327H | Feb 10, 2025to Nov 7, 2025 | Feb 10, 2025 | Nov 7, 2025 | $250,000$85,192 spent | $85,192 | |
Repair HTHW Plattsburgh State University College Clinton County DEF275HConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEF275H | Oct 28, 2024to Feb 25, 2025 | Oct 28, 2024 | Feb 25, 2025 | $100,000$60,346 spent | $60,346 | |
Removal and replacement of hud T000864Contract not subject to state pre-audit | College at Plattsburgh | Contract not subject to state pre-auditNot pre-audited | T000864 | Sep 20, 2024to Dec 31, 2024 | Sep 20, 2024 | Dec 31, 2024 | $39,150$39,150 spent | $39,150 | |
Repair condensate lines Clinton Correctional Facility Clinton County DEF245PConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEF245P | Aug 28, 2024to Dec 26, 2024 | Aug 28, 2024 | Dec 26, 2024 | $150,000$56,982 spent | $56,982 | |
HVAC work for rehabilitate Building 140 Washington Correctional Annex in Washington Co. D47513HConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D47513H | Aug 27, 2024to May 1, 2026 | Aug 27, 2024 | May 1, 2026 | $550,100$534,121 spent | $534,121 | |
Plumbing work for rehabilitate Building 140 Washington Correctional Annex in Washington Co. D47513PConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D47513P | Aug 27, 2024to May 1, 2026 | Aug 27, 2024 | May 1, 2026 | $322,000$264,601 spent | $264,601 | |
Reconfigure circulation pumps & domestic hot water heater at Upstate CF in Franklin County DQ1867HConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DQ1867H | Jul 29, 2024to Nov 12, 2026 | Jul 29, 2024 | Nov 12, 2026 | $939,992$792,792 spent | $792,792 | |
Repair domestic water heater in Mechanical room of the gym at Clinton CF in Clinton County DEF159PConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEF159P | Mar 3, 2024to Jul 1, 2024 | Mar 3, 2024 | Jul 1, 2024 | $200,000$19,838 spent | $19,838 |
High Temperature Hot Water Priorities 1 & 4 at SUNY Plattsburg in Clinton CountyCollege at PlattsburghSep 15, 2026 – Aug 9, 2027Active$2,727,272
- Description
- High Temperature Hot Water Priorities 1 & 4 at SUNY Plattsburg in Clinton County
- Contract number
- D000941
- Type
- Construction: BuildingConstruction
- Agency
- College at Plattsburgh
- Term
- Sep 15, 2026 → Aug 9, 202711 months
- Approved
- Sep 15, 2026
- Status
- Active
- Amount
- $2,727,272
- Spent to date
- $0 · 0% of the amount
Adirondack Fish Hatchery Brook Trout Expansion Pole Barn Town of Santa Clara in Franklin CountyDepartment of Environmental ConservationJun 23, 2026 – Mar 31, 2027Active$59,500
- Description
- Adirondack Fish Hatchery Brook Trout Expansion Pole Barn Town of Santa Clara in Franklin County
- Contract number
- D0000017
- Type
- Construction: BuildingConstruction
- Term
- Jun 23, 2026 → Mar 31, 20279 months
- Approved
- Jun 23, 2026
- Status
- Active
- Amount
- $59,500
- Spent to date
- $0 · 0% of the amount
Repair steam lines at Clinton Correctional Facility in Clinton CountyOffice of General Services - Design & ConstructionMay 5, 2026 – May 31, 2027Active$300,000
- Description
- Repair steam lines at Clinton Correctional Facility in Clinton County
- Contract number
- DEF556H
- Type
- Construction: BuildingConstruction
- Term
- May 5, 2026 → May 31, 202713 months
- Approved
- May 22, 2026
- Status
- Active
- Amount
- $300,000
- Spent to date
- $0 · 0% of the amount
Restore heating system Clinton Correctional Facility Clinton CountyOffice of General Services - Design & ConstructionOct 29, 2025 – Mar 30, 2027Active$1,000,000
- Description
- Restore heating system Clinton Correctional Facility Clinton County
- Contract number
- DEF448H
- Type
- Construction: BuildingConstruction
- Term
- Oct 29, 2025 → Mar 30, 202717 months
- Approved
- Nov 18, 2025
- Status
- Active
- Amount
- $1,000,000
- Spent to date
- $514,978 · 51% of the amount
Repair steam leaks Adirondack Correctional Facility Ray Brook Essex CountyOffice of General Services - Design & ConstructionJan 29, 2026 – May 29, 2026$150,000
- Description
- Repair steam leaks Adirondack Correctional Facility Ray Brook Essex County
- Contract number
- DEF498H
- Type
- Construction: BuildingConstruction
- Term
- Jan 29, 2026 → May 29, 20264 months
- Approved
- Mar 23, 2026
- Status
- Ended
- Amount
- $150,000
- Spent to date
- $57,212 · 38% of the amount
Repair water line leaks a nd restore damage Clinton Correctional Facility Clinton CountyOffice of General Services - Design & ConstructionDec 11, 2025 – Apr 10, 2026$300,000
- Description
- Repair water line leaks a nd restore damage Clinton Correctional Facility Clinton County
- Contract number
- DEF482P
- Type
- Construction: BuildingConstruction
- Term
- Dec 11, 2025 → Apr 10, 20264 months
- Approved
- Jan 8, 2026
- Status
- Ended
- Amount
- $300,000
- Spent to date
- $29,870 · 10% of the amount
Infirmary HVAC replacement in Clinton CountyCollege at PlattsburghNov 14, 2025 – Jan 9, 2026$595,000
- Description
- Infirmary HVAC replacement in Clinton County
- Contract number
- D000893
- Type
- Construction: BuildingConstruction
- Agency
- College at Plattsburgh
- Term
- Nov 14, 2025 → Jan 9, 20262 months
- Approved
- Nov 14, 2025
- Status
- Ended
- Amount
- $595,000
- Spent to date
- $0 · 0% of the amount
Emergency hot water pipe repair in Clinton CountyCollege at PlattsburghSep 23, 2025 – Oct 6, 2025$104,759
- Description
- Emergency hot water pipe repair in Clinton County
- Contract number
- D000917
- Type
- Construction: MiscellaneousConstruction
- Agency
- College at Plattsburgh
- Term
- Sep 23, 2025 → Oct 6, 2025
- Approved
- Apr 8, 2026
- Status
- Ended
- Amount
- $104,759
- Spent to date
- $104,759 · 100% of the amount
Repair freezer failure Adirondack Correctional Facility Essex CountyOffice of General Services - Design & ConstructionJun 30, 2025 – Mar 31, 2026$150,000
- Description
- Repair freezer failure Adirondack Correctional Facility Essex County
- Contract number
- DEF408H
- Type
- Construction: BuildingConstruction
- Term
- Jun 30, 2025 → Mar 31, 20269 months
- Approved
- Sep 8, 2025
- Status
- Ended
- Amount
- $150,000
- Spent to date
- $51,593 · 34% of the amount
Repair steam leak Building 1 Adirondack Correctional facility Essex CountyOffice of General Services - Design & ConstructionMay 12, 2025 – Oct 23, 2025$75,000
- Description
- Repair steam leak Building 1 Adirondack Correctional facility Essex County
- Contract number
- DEF371H
- Type
- Construction: BuildingConstruction
- Term
- May 12, 2025 → Oct 23, 20255 months
- Approved
- Jun 13, 2025
- Status
- Ended
- Amount
- $75,000
- Spent to date
- $20,155 · 27% of the amount
Replace boiler at Valcour Comfort Station DOT Region 7 in Clinton CountyOffice of General Services - Design & ConstructionMay 5, 2025 – May 31, 2026$483,500
- Description
- Replace boiler at Valcour Comfort Station DOT Region 7 in Clinton County
- Contract number
- D47647H
- Type
- Construction: BuildingConstruction
- Term
- May 5, 2025 → May 31, 202613 months
- Approved
- May 5, 2025
- Status
- Ended
- Amount
- $483,500
- Spent to date
- $466,692 · 97% of the amount
Replace hot water storage tank in Building 8 at Washington Correctional Facility in Washington CoOffice of General Services - Design & ConstructionMar 5, 2025 – Jan 5, 2026$270,000
- Description
- Replace hot water storage tank in Building 8 at Washington Correctional Facility in Washington Co
- Contract number
- DQ1890P
- Type
- Construction: BuildingConstruction
- Term
- Mar 5, 2025 → Jan 5, 202610 months
- Approved
- Mar 5, 2025
- Status
- Ended
- Amount
- $270,000
- Spent to date
- $246,600 · 91% of the amount
Repair hot water line Altona Correctional Facility Clinton CountyOffice of General Services - Design & ConstructionFeb 10, 2025 – Nov 7, 2025$250,000
- Description
- Repair hot water line Altona Correctional Facility Clinton County
- Contract number
- DEF327H
- Type
- Construction: BuildingConstruction
- Term
- Feb 10, 2025 → Nov 7, 20259 months
- Approved
- Mar 14, 2025
- Status
- Ended
- Amount
- $250,000
- Spent to date
- $85,192 · 34% of the amount
Repair HTHW Plattsburgh State University College Clinton CountyOffice of General Services - Design & ConstructionOct 28, 2024 – Feb 25, 2025$100,000
- Description
- Repair HTHW Plattsburgh State University College Clinton County
- Contract number
- DEF275H
- Type
- Construction: BuildingConstruction
- Term
- Oct 28, 2024 → Feb 25, 20254 months
- Approved
- Dec 23, 2024
- Status
- Ended
- Amount
- $100,000
- Spent to date
- $60,346 · 60% of the amount
Removal and replacement of hudCollege at PlattsburghSep 20, 2024 – Dec 31, 2024$39,150
- Description
- Removal and replacement of hud
- Contract number
- T000864
- Type
- Contract not subject to state pre-auditNot pre-audited
- Agency
- College at Plattsburgh
- Term
- Sep 20, 2024 → Dec 31, 20243 months
- Approved
- Sep 23, 2024
- Status
- Ended
- Amount
- $39,150
- Spent to date
- $39,150 · 100% of the amount
Repair condensate lines Clinton Correctional Facility Clinton CountyOffice of General Services - Design & ConstructionAug 28, 2024 – Dec 26, 2024$150,000
- Description
- Repair condensate lines Clinton Correctional Facility Clinton County
- Contract number
- DEF245P
- Type
- Construction: BuildingConstruction
- Term
- Aug 28, 2024 → Dec 26, 20244 months
- Approved
- Sep 27, 2024
- Status
- Ended
- Amount
- $150,000
- Spent to date
- $56,982 · 38% of the amount
HVAC work for rehabilitate Building 140 Washington Correctional Annex in Washington Co.Office of General Services - Design & ConstructionAug 27, 2024 – May 1, 2026$550,100
- Description
- HVAC work for rehabilitate Building 140 Washington Correctional Annex in Washington Co.
- Contract number
- D47513H
- Type
- Construction: BuildingConstruction
- Term
- Aug 27, 2024 → May 1, 20261.7 years
- Approved
- Aug 27, 2024
- Status
- Ended
- Amount
- $550,100
- Spent to date
- $534,121 · 97% of the amount
Plumbing work for rehabilitate Building 140 Washington Correctional Annex in Washington Co.Office of General Services - Design & ConstructionAug 27, 2024 – May 1, 2026$322,000
- Description
- Plumbing work for rehabilitate Building 140 Washington Correctional Annex in Washington Co.
- Contract number
- D47513P
- Type
- Construction: BuildingConstruction
- Term
- Aug 27, 2024 → May 1, 20261.7 years
- Approved
- Aug 27, 2024
- Status
- Ended
- Amount
- $322,000
- Spent to date
- $264,601 · 82% of the amount
Reconfigure circulation pumps & domestic hot water heater at Upstate CF in Franklin CountyOffice of General Services - Design & ConstructionJul 29, 2024 – Nov 12, 2026$939,992
- Description
- Reconfigure circulation pumps & domestic hot water heater at Upstate CF in Franklin County
- Contract number
- DQ1867H
- Type
- Construction: BuildingConstruction
- Term
- Jul 29, 2024 → Nov 12, 20262.3 years
- Approved
- Jul 29, 2024
- Status
- Ended
- Amount
- $939,992
- Spent to date
- $792,792 · 84% of the amount
Repair domestic water heater in Mechanical room of the gym at Clinton CF in Clinton CountyOffice of General Services - Design & ConstructionMar 3, 2024 – Jul 1, 2024$200,000
- Description
- Repair domestic water heater in Mechanical room of the gym at Clinton CF in Clinton County
- Contract number
- DEF159P
- Type
- Construction: BuildingConstruction
- Term
- Mar 3, 2024 → Jul 1, 20244 months
- Approved
- Apr 10, 2024
- Status
- Ended
- Amount
- $200,000
- Spent to date
- $19,838 · 10% of the amount
Contract-type mix
Share of contract value by type
- Construction67 contracts$43.4M
- Contract not subject to state pre-audit1 contract$39.2K
Contracts over time
Contracts started per year
View as table
| Year | Contracts |
|---|---|
| 2009: 3 contracts, $1.1M | 3 |
| 2010: 0 contracts, $0.0 | 0 |
| 2011: 1 contracts, $75.9K | 1 |
| 2012: 3 contracts, $525.6K | 3 |
| 2013: 5 contracts, $1.5M | 5 |
| 2014: 1 contracts, $162.5K | 1 |
| 2015: 2 contracts, $457.3K | 2 |
| 2016: 5 contracts, $2.0M | 5 |
| 2017: 2 contracts, $250.0K | 2 |
| 2018: 5 contracts, $3.1M | 5 |
| 2019: 2 contracts, $7.2M | 2 |
| 2020: 5 contracts, $1.0M | 5 |
| 2021: 5 contracts, $1.5M | 5 |
| 2022: 1 contracts, $3.3M | 1 |
| 2023: 5 contracts, $11.5M | 5 |
| 2024: 10 contracts, $3.2M | 10 |
| 2025: 9 contracts, $3.2M | 9 |
| 2026: 4 contracts, $3.2M | 4 |
How the Contractor Score adds up
Extensive (A, 100/100): 4 active contracts, $43M in contracts.
- Contract volume+15.0measured
$43M in current contract value across 68 contracts, more than 94% of scored contractors.
- Recent activity+16.8measured
4 active contracts today; the most recent was approved in September 2026.
- Agency breadth+10.3measured
Contracts with 6 different state agencies and facilities.
- Experience+1.8measured
First contract started in March 2009 (17 years of contract history).
- Contract-type mix+7.0measured
4 contract types; the largest group is construction (100% of value). Goods and services contracts are 100% of the total.
- Spending vs. value0.0measured
On 60 completed contracts with spending recorded, spending is 91% of the contract value. Spending below the full value is common (work can finish under budget) and isn't treated as a problem.
- Federal award history0.0unknown
No federal award history found. Scored as neutral.
- Federal registration0.0unknown
No federal contractor registration found. Scored as neutral.
50 + contributions = 100.9, capped at 100Starts at 50. Bars: cool adds, warm subtracts.
Agencies served
Contract value with each agency or facility
- Office of General Services - Design & Construction57 contracts$34.6M
- College at Plattsburgh4 contracts$3.5M
- State University Construction Fund1 contract$3.3M
- Department of Transportation2 contracts$1.6M
- Department of Environmental Conservation2 contracts$238.5K
- Office of Parks Recreation & Historic Preservation2 contracts$233.8K
Similar contractors
- A
Weydman Electric Inc
Tonawanda, NYConstruction & Renovation
Since 200810 agencies
- Contract value
- $34.4M
- Contracts
- 44
- Active
- 7
- A
Luck Brothers Inc
Construction & Renovation
Since 20068 agencies
- Contract value
- $248.1M
- Contracts
- 78
- Active
- 5
- A
Murnane Building Contractors
Plattsburgh, NYConstruction & Renovation
Since 200515 agencies
- Contract value
- $519.9M
- Contracts
- 120
- Active
- 9
- A
Dow Electric Inc
Malone, NYConstruction & Renovation
Since 200810 agencies
- Contract value
- $71.1M
- Contracts
- 116
- Active
- 5
- A
Je Sheehan Contracting Corp
Potsdam, NYConstruction & Renovation
Since 20098 agencies
- Contract value
- $20.4M
- Contracts
- 25
- Active
- 3
- A
Titan Roofing Inc
Construction & Renovation
Since 200816 agencies
- Contract value
- $137.7M
- Contracts
- 128
- Active
- 7
- More construction & renovation contractors Ranked by contract value
Browse more
- Office of General Services - Design & Construction contractors
- College at Plattsburgh contractors
- State University Construction Fund contractors
- Department of Transportation contractors
- Construction & Renovation contractors
- Top contractors
- All contractors
Contract figures are public New York State contract records as of Nov 13, 2026: current contract amounts and spending to date as reported. Company details are shown when we can match this contractor to a registered business with confidence.
RFP Detector is an independent service and is not affiliated with any government agency. Scores are informational.