Nairy Mechanical LLC
AState contracts since 2010Updated Nov 13, 2026
Nairy Mechanical LLC holds 32 contracts worth $16.8M with 3 New York State agencies, most with Office of General Services - Design & Construction; 4 active today. The first started in 2010.
- Total contract value
- $16.8M
- Current contract amounts
- Spent to date
- $13.5M
- 80% of contract value
- Active contracts
- 4
- $1.1M in active value
- Contracts on record
- 32
- Since 2010
- Agencies served
- 3
- Most with Office of General Services - Design & Construction
- Years active
- 16
- First contract 2010
Contact & company
Business information and how to reach the company.
Phone
Address
Leadership
Ray Holtz
President, Owner
Douglas Dixon
Project Manager
Katie Graves
Office Manager
Sarah Ansini
Project Administrator
Sheri Charko
Project Manager
Contracts
32 contracts with New York State agencies, active first. Open a row for the full record.
| Details | Contract | Type | Contract no. | Term | |||||
|---|---|---|---|---|---|---|---|---|---|
Repair sewer pumps Groveland Correctional Facility Livingston County DEF618PConstruction: BuildingActive | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEF618P | Sep 10, 2026to Mar 9, 2027 | Sep 10, 2026 | Mar 9, 2027 | $300,000$0 spent | $0 | |
Repair floor drain Attica Correctional Facility Wyoming County DEF615PConstruction: BuildingActive | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEF615P | Aug 27, 2026to Feb 23, 2027 | Aug 27, 2026 | Feb 23, 2027 | $150,000$26,630 spent | $26,630 | |
Repair or replace Bar Screen System at Wyoming Correctional Facility in Wyoming County DEF544PConstruction: BuildingActive | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEF544P | Apr 6, 2026to Apr 1, 2027 | Apr 6, 2026 | Apr 1, 2027 | $300,000$83,647 spent | $83,647 | |
Repair cell backs Wende Correctional Facility Erie County DEF461PConstruction: BuildingActive | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEF461P | Nov 14, 2025to Jan 8, 2027 | Nov 14, 2025 | Jan 8, 2027 | $300,000$150,208 spent | $150,208 | |
Repair leachate pump system at Rush Landfill in Monroe County DEF561PConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEF561P | May 13, 2026to Nov 9, 2026 | May 13, 2026 | Nov 9, 2026 | $300,000$31,594 spent | $31,594 | |
Repair broken water line Attica Correctional Facility Wyoming County DEF494PConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEF494P | Jan 14, 2026to Nov 10, 2026 | Jan 14, 2026 | Nov 10, 2026 | $450,000$273,233 spent | $273,233 | |
Repair boiler failures DOT Region 6 in Allegany County DEF464HConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEF464H | Nov 14, 2025to Nov 9, 2026 | Nov 14, 2025 | Nov 9, 2026 | $150,000$40,726 spent | $40,726 | |
Repair hot water tank at Groveland Correctional Facility in Livingston County DEF420PConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEF420P | Aug 13, 2025to Jul 1, 2026 | Aug 13, 2025 | Jul 1, 2026 | $300,000$159,510 spent | $159,510 | |
Repair heating line at Wyoming Correctional Facility in Attica Wyoming County DEF419HConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEF419H | Aug 7, 2025to Oct 31, 2026 | Aug 7, 2025 | Oct 31, 2026 | $450,000$366,677 spent | $366,677 | |
Repair chiller at Five Points CF in Seneca County DEF214HConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEF214H | Jun 20, 2024to Dec 17, 2024 | Jun 20, 2024 | Dec 17, 2024 | $300,000$203,211 spent | $203,211 | |
Repair AC units Groveland Correction Facility Livingston County DEF210HConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEF210H | Jun 18, 2024to Oct 15, 2025 | Jun 18, 2024 | Oct 15, 2025 | $600,000$472,788 spent | $472,788 | |
Repair Boilers HVAC Nortis ATC Monroe County. DEF099HConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEF099H | Nov 21, 2023to Oct 19, 2024 | Nov 21, 2023 | Oct 19, 2024 | $300,000$140,786 spent | $140,786 | |
Repair Domestic Water Line Attica CF in Wyoming County DEF096PConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEF096P | Nov 17, 2023to May 16, 2024 | Nov 17, 2023 | May 16, 2024 | $300,000$295,614 spent | $295,614 | |
Repair Condensate Leak Buffalo SUNY North Buffalo Erie County DEF070HConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEF070H | Oct 6, 2023to Aug 30, 2024 | Oct 6, 2023 | Aug 30, 2024 | $600,000$17,953 spent | $17,953 | |
Repair Heating Lines Bldg 89 at Groveland CF in Livingston County DEF054HConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEF054H | Aug 24, 2023to Jun 30, 2024 | Aug 24, 2023 | Jun 30, 2024 | $300,000$266,812 spent | $266,812 | |
Repair plumbing backups at Norris Alcohol Treatment Center Monroe County DEE911PConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEE911P | Dec 7, 2022to Apr 6, 2023 | Dec 7, 2022 | Apr 6, 2023 | $75,000$19,372 spent | $19,372 | |
Tower Fine Arts chiller replacement HVAC- SUNY Brockport D211020Construction: Miscellaneous | College at Brockport | Construction: MiscellaneousConstruction | D211020 | Jul 20, 2022to Apr 1, 2024 | Jul 20, 2022 | Apr 1, 2024 | $374,238$374,238 spent | $374,238 | |
Repair steam leak in the HVAC system at Mohawk CF in Oneida county DEE773HConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEE773H | Feb 17, 2022to Jun 17, 2022 | Feb 17, 2022 | Jun 17, 2022 | $100,000$7,923 spent | $7,923 | |
Repair water supply pressure issues Central NY PC Oneida County DEE750PConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEE750P | Jan 13, 2022to Jul 12, 2022 | Jan 13, 2022 | Jul 12, 2022 | $150,000$20,607 spent | $20,607 | |
Repair steam leaks Elmira CF Chemung County DEE746HConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEE746H | Jan 6, 2022to Dec 29, 2022 | Jan 6, 2022 | Dec 29, 2022 | $400,000$356,953 spent | $356,953 |
Repair sewer pumps Groveland Correctional Facility Livingston CountyOffice of General Services - Design & ConstructionSep 10, 2026 – Mar 9, 2027Active$300,000
- Description
- Repair sewer pumps Groveland Correctional Facility Livingston County
- Contract number
- DEF618P
- Type
- Construction: BuildingConstruction
- Term
- Sep 10, 2026 → Mar 9, 20276 months
- Approved
- Oct 13, 2026
- Status
- Active
- Amount
- $300,000
- Spent to date
- $0 · 0% of the amount
Repair floor drain Attica Correctional Facility Wyoming CountyOffice of General Services - Design & ConstructionAug 27, 2026 – Feb 23, 2027Active$150,000
- Description
- Repair floor drain Attica Correctional Facility Wyoming County
- Contract number
- DEF615P
- Type
- Construction: BuildingConstruction
- Term
- Aug 27, 2026 → Feb 23, 20276 months
- Approved
- Oct 2, 2026
- Status
- Active
- Amount
- $150,000
- Spent to date
- $26,630 · 18% of the amount
Repair or replace Bar Screen System at Wyoming Correctional Facility in Wyoming CountyOffice of General Services - Design & ConstructionApr 6, 2026 – Apr 1, 2027Active$300,000
- Description
- Repair or replace Bar Screen System at Wyoming Correctional Facility in Wyoming County
- Contract number
- DEF544P
- Type
- Construction: BuildingConstruction
- Term
- Apr 6, 2026 → Apr 1, 202712 months
- Approved
- May 19, 2026
- Status
- Active
- Amount
- $300,000
- Spent to date
- $83,647 · 28% of the amount
Repair cell backs Wende Correctional Facility Erie CountyOffice of General Services - Design & ConstructionNov 14, 2025 – Jan 8, 2027Active$300,000
- Description
- Repair cell backs Wende Correctional Facility Erie County
- Contract number
- DEF461P
- Type
- Construction: BuildingConstruction
- Term
- Nov 14, 2025 → Jan 8, 202714 months
- Approved
- Dec 22, 2025
- Status
- Active
- Amount
- $300,000
- Spent to date
- $150,208 · 50% of the amount
Repair leachate pump system at Rush Landfill in Monroe CountyOffice of General Services - Design & ConstructionMay 13, 2026 – Nov 9, 2026$300,000
- Description
- Repair leachate pump system at Rush Landfill in Monroe County
- Contract number
- DEF561P
- Type
- Construction: BuildingConstruction
- Term
- May 13, 2026 → Nov 9, 20266 months
- Approved
- Jun 5, 2026
- Status
- Ended
- Amount
- $300,000
- Spent to date
- $31,594 · 11% of the amount
Repair broken water line Attica Correctional Facility Wyoming CountyOffice of General Services - Design & ConstructionJan 14, 2026 – Nov 10, 2026$450,000
- Description
- Repair broken water line Attica Correctional Facility Wyoming County
- Contract number
- DEF494P
- Type
- Construction: BuildingConstruction
- Term
- Jan 14, 2026 → Nov 10, 202610 months
- Approved
- Feb 25, 2026
- Status
- Ended
- Amount
- $450,000
- Spent to date
- $273,233 · 61% of the amount
Repair boiler failures DOT Region 6 in Allegany CountyOffice of General Services - Design & ConstructionNov 14, 2025 – Nov 9, 2026$150,000
- Description
- Repair boiler failures DOT Region 6 in Allegany County
- Contract number
- DEF464H
- Type
- Construction: BuildingConstruction
- Term
- Nov 14, 2025 → Nov 9, 202612 months
- Approved
- Dec 22, 2025
- Status
- Ended
- Amount
- $150,000
- Spent to date
- $40,726 · 27% of the amount
Repair hot water tank at Groveland Correctional Facility in Livingston CountyOffice of General Services - Design & ConstructionAug 13, 2025 – Jul 1, 2026$300,000
- Description
- Repair hot water tank at Groveland Correctional Facility in Livingston County
- Contract number
- DEF420P
- Type
- Construction: BuildingConstruction
- Term
- Aug 13, 2025 → Jul 1, 202611 months
- Approved
- Oct 21, 2025
- Status
- Ended
- Amount
- $300,000
- Spent to date
- $159,510 · 53% of the amount
Repair heating line at Wyoming Correctional Facility in Attica Wyoming CountyOffice of General Services - Design & ConstructionAug 7, 2025 – Oct 31, 2026$450,000
- Description
- Repair heating line at Wyoming Correctional Facility in Attica Wyoming County
- Contract number
- DEF419H
- Type
- Construction: BuildingConstruction
- Term
- Aug 7, 2025 → Oct 31, 202615 months
- Approved
- Oct 22, 2025
- Status
- Ended
- Amount
- $450,000
- Spent to date
- $366,677 · 81% of the amount
Repair chiller at Five Points CF in Seneca CountyOffice of General Services - Design & ConstructionJun 20, 2024 – Dec 17, 2024$300,000
- Description
- Repair chiller at Five Points CF in Seneca County
- Contract number
- DEF214H
- Type
- Construction: BuildingConstruction
- Term
- Jun 20, 2024 → Dec 17, 20246 months
- Approved
- Jul 31, 2024
- Status
- Ended
- Amount
- $300,000
- Spent to date
- $203,211 · 68% of the amount
Repair AC units Groveland Correction Facility Livingston CountyOffice of General Services - Design & ConstructionJun 18, 2024 – Oct 15, 2025$600,000
- Description
- Repair AC units Groveland Correction Facility Livingston County
- Contract number
- DEF210H
- Type
- Construction: BuildingConstruction
- Term
- Jun 18, 2024 → Oct 15, 202516 months
- Approved
- Jul 10, 2024
- Status
- Ended
- Amount
- $600,000
- Spent to date
- $472,788 · 79% of the amount
Repair Boilers HVAC Nortis ATC Monroe County.Office of General Services - Design & ConstructionNov 21, 2023 – Oct 19, 2024$300,000
- Description
- Repair Boilers HVAC Nortis ATC Monroe County.
- Contract number
- DEF099H
- Type
- Construction: BuildingConstruction
- Term
- Nov 21, 2023 → Oct 19, 202411 months
- Approved
- Dec 26, 2023
- Status
- Ended
- Amount
- $300,000
- Spent to date
- $140,786 · 47% of the amount
Repair Domestic Water Line Attica CF in Wyoming CountyOffice of General Services - Design & ConstructionNov 17, 2023 – May 16, 2024$300,000
- Description
- Repair Domestic Water Line Attica CF in Wyoming County
- Contract number
- DEF096P
- Type
- Construction: BuildingConstruction
- Term
- Nov 17, 2023 → May 16, 20246 months
- Approved
- Dec 26, 2023
- Status
- Ended
- Amount
- $300,000
- Spent to date
- $295,614 · 99% of the amount
Repair Condensate Leak Buffalo SUNY North Buffalo Erie CountyOffice of General Services - Design & ConstructionOct 6, 2023 – Aug 30, 2024$600,000
- Description
- Repair Condensate Leak Buffalo SUNY North Buffalo Erie County
- Contract number
- DEF070H
- Type
- Construction: BuildingConstruction
- Term
- Oct 6, 2023 → Aug 30, 202411 months
- Approved
- Nov 14, 2023
- Status
- Ended
- Amount
- $600,000
- Spent to date
- $17,953 · 3% of the amount
Repair Heating Lines Bldg 89 at Groveland CF in Livingston CountyOffice of General Services - Design & ConstructionAug 24, 2023 – Jun 30, 2024$300,000
- Description
- Repair Heating Lines Bldg 89 at Groveland CF in Livingston County
- Contract number
- DEF054H
- Type
- Construction: BuildingConstruction
- Term
- Aug 24, 2023 → Jun 30, 202410 months
- Approved
- Sep 22, 2023
- Status
- Ended
- Amount
- $300,000
- Spent to date
- $266,812 · 89% of the amount
Repair plumbing backups at Norris Alcohol Treatment Center Monroe CountyOffice of General Services - Design & ConstructionDec 7, 2022 – Apr 6, 2023$75,000
- Description
- Repair plumbing backups at Norris Alcohol Treatment Center Monroe County
- Contract number
- DEE911P
- Type
- Construction: BuildingConstruction
- Term
- Dec 7, 2022 → Apr 6, 20234 months
- Approved
- Mar 1, 2023
- Status
- Ended
- Amount
- $75,000
- Spent to date
- $19,372 · 26% of the amount
Tower Fine Arts chiller replacement HVAC- SUNY BrockportCollege at BrockportJul 20, 2022 – Apr 1, 2024$374,238
- Description
- Tower Fine Arts chiller replacement HVAC- SUNY Brockport
- Contract number
- D211020
- Type
- Construction: MiscellaneousConstruction
- Agency
- College at Brockport
- Term
- Jul 20, 2022 → Apr 1, 20241.7 years
- Approved
- Aug 3, 2022
- Status
- Ended
- Amount
- $374,238
- Spent to date
- $374,238 · 100% of the amount
Repair steam leak in the HVAC system at Mohawk CF in Oneida countyOffice of General Services - Design & ConstructionFeb 17, 2022 – Jun 17, 2022$100,000
- Description
- Repair steam leak in the HVAC system at Mohawk CF in Oneida county
- Contract number
- DEE773H
- Type
- Construction: BuildingConstruction
- Term
- Feb 17, 2022 → Jun 17, 20224 months
- Approved
- Mar 22, 2022
- Status
- Ended
- Amount
- $100,000
- Spent to date
- $7,923 · 8% of the amount
Repair water supply pressure issues Central NY PC Oneida CountyOffice of General Services - Design & ConstructionJan 13, 2022 – Jul 12, 2022$150,000
- Description
- Repair water supply pressure issues Central NY PC Oneida County
- Contract number
- DEE750P
- Type
- Construction: BuildingConstruction
- Term
- Jan 13, 2022 → Jul 12, 20226 months
- Approved
- Feb 9, 2022
- Status
- Ended
- Amount
- $150,000
- Spent to date
- $20,607 · 14% of the amount
Repair steam leaks Elmira CF Chemung CountyOffice of General Services - Design & ConstructionJan 6, 2022 – Dec 29, 2022$400,000
- Description
- Repair steam leaks Elmira CF Chemung County
- Contract number
- DEE746H
- Type
- Construction: BuildingConstruction
- Term
- Jan 6, 2022 → Dec 29, 202212 months
- Approved
- Feb 9, 2022
- Status
- Ended
- Amount
- $400,000
- Spent to date
- $356,953 · 89% of the amount
Contract-type mix
Share of contract value by type
- Construction31 contracts$16.8M
- Contract not subject to state pre-audit1 contract$26.0K
Contracts over time
Contracts started per year
View as table
| Year | Contracts |
|---|---|
| 2010: 1 contracts, $24.9K | 1 |
| 2011: 3 contracts, $879.6K | 3 |
| 2012: 0 contracts, $0.0 | 0 |
| 2013: 1 contracts, $29.2K | 1 |
| 2014: 0 contracts, $0.0 | 0 |
| 2015: 1 contracts, $26.0K | 1 |
| 2016: 1 contracts, $207.8K | 1 |
| 2017: 0 contracts, $0.0 | 0 |
| 2018: 3 contracts, $8.9M | 3 |
| 2019: 0 contracts, $0.0 | 0 |
| 2020: 0 contracts, $0.0 | 0 |
| 2021: 2 contracts, $539.1K | 2 |
| 2022: 5 contracts, $1.1M | 5 |
| 2023: 4 contracts, $1.5M | 4 |
| 2024: 2 contracts, $900.0K | 2 |
| 2025: 4 contracts, $1.2M | 4 |
| 2026: 5 contracts, $1.5M | 5 |
How the Contractor Score adds up
Extensive (A, 93/100): 4 active contracts, $17M in contracts.
- Contract volume+11.9measured
$17M in current contract value across 32 contracts, more than 89% of scored contractors.
- Recent activity+16.9measured
4 active contracts today; the most recent was approved in October 2026.
- Agency breadth+6.8measured
Contracts with 3 different state agencies and facilities.
- Experience+1.3measured
First contract started in October 2010 (16 years of contract history).
- Contract-type mix+6.4measured
3 contract types; the largest group is construction (100% of value). Goods and services contracts are 100% of the total.
- Spending vs. value−0.2measured
On 28 completed contracts with spending recorded, spending is 84% of the contract value. Spending below the full value is common (work can finish under budget) and isn't treated as a problem.
- Federal award history0.0unknown
No federal award history found. Scored as neutral.
- Federal registration0.0unknown
No federal contractor registration found. Scored as neutral.
50 + contributions = 93 (A, Extensive)Starts at 50. Bars: cool adds, warm subtracts.
Agencies served
Contract value with each agency or facility
Similar contractors
- A
Concord Electric Corporation
Construction & Renovation
Since 20106 agencies
- Contract value
- $19.4M
- Contracts
- 35
- Active
- 5
- A
Picone Construction Corporation
Construction & Renovation
Since 20107 agencies
- Contract value
- $22.2M
- Contracts
- 10
- Active
- 2
- B
Testa Construction Inc
Construction & Renovation
Since 20076 agencies
- Contract value
- $12.0M
- Contracts
- 15
- Active
- 0
- A
Billitier Electric Inc
Rochester, NYConstruction & Renovation
Since 20096 agencies
- Contract value
- $10.4M
- Contracts
- 14
- Active
- 1
- A
Hewitt Young Electric LLC
Rochester, NYConstruction & Renovation
Since 20104 agencies
- Contract value
- $36.0M
- Contracts
- 20
- Active
- 5
- A
Postler & Jaeckle Corp
Rochester, NYConstruction & Renovation
Since 200819 agencies
- Contract value
- $56.7M
- Contracts
- 101
- Active
- 12
- More construction & renovation contractors Ranked by contract value
Browse more
- Office of General Services - Design & Construction contractors
- Office of Parks Recreation & Historic Preservation contractors
- College at Brockport contractors
- Construction & Renovation contractors
- Top contractors
- All contractors
Contract figures are public New York State contract records as of Nov 13, 2026: current contract amounts and spending to date as reported. Company details are shown when we can match this contractor to a registered business with confidence.
RFP Detector is an independent service and is not affiliated with any government agency. Scores are informational.