PCC Contracting Inc holds 20 contracts worth $19.7M with 4 New York State agencies, most with Office of General Services - Design & Construction; 1 active today. The first started in 2009.
- Total contract value
- $19.7M
- Current contract amounts
- Spent to date
- $18.7M
- 95% of contract value
- Active contracts
- 1
- $847.7K in active value
- Contracts on record
- 20
- Since 2009
- Agencies served
- 4
- Most with Office of General Services - Design & Construction
- Years active
- 17
- First contract 2009
Contact & company
Business information and how to reach the company.
Phone
Address
- Legal name
- PCC Contracting Inc.Doing business as PCC Contracting Inc
- Identifiers
- UEI XQYDCBA9DY44 · CAGE 5ZMC3
- Federal registration
- Active · renews by Aug 2027
- In business since
- 2003
Industry codes (NAICS)
- 238990All Other Specialty Trade Contractors
- 238110Poured Concrete Foundation and Structure Contractors
- 238140Masonry Contractors
- 238190Other Foundation, Structure, and Building Exterior Contractors
- 238340Tile and Terrazzo Contractors
Leadership
Michael K Lock
President
Leigh A Lock
Secretary/Treasurer
Contracts
20 contracts with New York State agencies, active first. Open a row for the full record.
| Details | Contract | Type | Contract no. | Term | |||||
|---|---|---|---|---|---|---|---|---|---|
Replace freight elevator bldg 12 Wallkill CF Ulster County DM3087CConstruction: BuildingActive | Office of General Services - Design & Construction | Construction: BuildingConstruction | DM3087C | Nov 22, 2021to Feb 2, 2027 | Nov 22, 2021 | Feb 2, 2027 | $847,706$761,260 spent | $761,260 | |
Dormer & window restorations for Crailo State Historic Site in Rensselaer County D006407Construction: Building | Office of Parks Recreation & Historic Preservation | Construction: BuildingConstruction | D006407 | Dec 9, 2025to Aug 26, 2026 | Dec 9, 2025 | Aug 26, 2026 | $418,647$380,526 spent | $380,526 | |
Replace concrete terrazzo concourse Empire State Plaza Albany County D47148CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D47148C | Jan 8, 2025to Sep 17, 2026 | Jan 8, 2025 | Sep 17, 2026 | $5,951,523$5,350,444 spent | $5,350,444 | |
Rehabilitation of 2 buildings & drainage at Senate House State Historic Site & in Ulster County D006115Construction: Building | Office of Parks Recreation & Historic Preservation | Construction: BuildingConstruction | D006115 | Dec 5, 2024to May 1, 2026 | Dec 5, 2024 | May 1, 2026 | $1,982,740$1,982,740 spent | $1,982,740 | |
For repair of 415 state ST fac T003999Contract not subject to state pre-audit | State University of New York - System Administration | Contract not subject to state pre-auditNot pre-audited | T003999 | Dec 5, 2022to Sep 1, 2023 | Dec 5, 2022 | Sep 1, 2023 | $197,682$197,682 spent | $197,682 | |
Pathway improvements Senate House State Historic Site Ulster County D005882Construction: Highway | Office of Parks Recreation & Historic Preservation | Construction: HighwayConstruction | D005882 | Nov 9, 2022to May 8, 2023 | Nov 9, 2022 | May 8, 2023 | $265,040$265,040 spent | $265,040 | |
Rehabilitate Kitchen Floor Building 3 Green Haven CF Dutchess County DM3097CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DM3097C | Mar 29, 2022to Mar 12, 2026 | Mar 29, 2022 | Mar 12, 2026 | $1,709,671$1,567,465 spent | $1,567,465 | |
Repair Roll Up Door Green Haven Correctional Facility Dutchess County DEE723CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEE723C | Dec 6, 2021to Jul 4, 2022 | Dec 6, 2021 | Jul 4, 2022 | $150,000$31,917 spent | $31,917 | |
Rehab Bathrooms & Showers Bldgs Gen Construction 2 15 & 22 Green Haven CF Dutchess County D45054CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D45054C | Mar 26, 2020to Sep 25, 2023 | Mar 26, 2020 | Sep 25, 2023 | $2,480,845$2,480,832 spent | $2,480,832 | |
Replace Exterior Doors Cultural Education Center Empire State Plaza Albany County D45778CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D45778C | Jul 26, 2019to Nov 11, 2020 | Jul 26, 2019 | Nov 11, 2020 | $634,718$629,094 spent | $629,094 | |
Project SA Spa 2015-03 Arcade Ceilings & Roof Repairs Phase II Hall of Springs D004978Construction: Building | Office of Parks Recreation & Historic Preservation | Construction: BuildingConstruction | D004978 | Nov 2, 2017to Nov 2, 2018 | Nov 2, 2017 | Nov 2, 2018 | $384,020$384,020 spent | $384,020 | |
Plaza Level Masonry Repairs ESP, Albany County (GC) D45487CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D45487C | Jul 6, 2017to Nov 17, 2020 | Jul 6, 2017 | Nov 17, 2020 | $2,000,000$1,996,361 spent | $1,996,361 | |
Rehabilitate Exterior Stairs Madison Ave. Plaza Level ESP (Albany) Albany County D45432CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D45432C | May 8, 2017to Aug 2, 2018 | May 8, 2017 | Aug 2, 2018 | $1,654,907$1,654,615 spent | $1,654,615 | |
Victoria Pool Stairs Rehabilitation, Saratoga Spa State Park D004784Construction: Building | Office of Parks Recreation & Historic Preservation | Construction: BuildingConstruction | D004784 | Jan 22, 2016to May 13, 2016 | Jan 22, 2016 | May 13, 2016 | $48,875$48,875 spent | $48,875 | |
Construction services for proj T990349Contract not subject to state pre-audit | College at Oneonta | Contract not subject to state pre-auditNot pre-audited | T990349 | Jun 7, 2014to Mar 15, 2015 | Jun 7, 2014 | Mar 15, 2015 | $166,055$166,055 spent | $166,055 | |
Construction services for proj T990335Contract not subject to state pre-audit | College at Oneonta | Contract not subject to state pre-auditNot pre-audited | T990335 | May 1, 2014to Jan 31, 2015 | May 1, 2014 | Jan 31, 2015 | $163,447$163,447 spent | $163,447 | |
Replace floor drains east wing DOT maintenance headquarters camillus onondaga county D44899CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D44899C | Apr 22, 2014to Nov 18, 2014 | Apr 22, 2014 | Nov 18, 2014 | $64,975$64,229 spent | $64,229 | |
Repair floor, powerhouse, BLDG. no. 17 mid state CF D44106CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D44106C | Aug 2, 2011to Jul 1, 2012 | Aug 2, 2011 | Jul 1, 2012 | $143,492$142,243 spent | $142,243 | |
Construction project #m09386 - schumacher hall stair repairs south stair: remove & replace 22 T990236Contract not subject to state pre-audit | College at Oneonta | Contract not subject to state pre-auditNot pre-audited | T990236 | May 23, 2011to Mar 23, 2012 | May 23, 2011 | Mar 23, 2012 | $57,615$57,615 spent | $57,615 | |
Repair steam tunnel floor MT mcgregor CF D43394CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D43394C | Nov 16, 2009to Jan 10, 2011 | Nov 16, 2009 | Jan 10, 2011 | $334,070$331,761 spent | $331,761 |
Replace freight elevator bldg 12 Wallkill CF Ulster CountyOffice of General Services - Design & ConstructionNov 22, 2021 – Feb 2, 2027Active$847,706
- Description
- Replace freight elevator bldg 12 Wallkill CF Ulster County
- Contract number
- DM3087C
- Type
- Construction: BuildingConstruction
- Term
- Nov 22, 2021 → Feb 2, 20275.2 years
- Approved
- Nov 22, 2021
- Status
- Active
- Amount
- $847,706
- Spent to date
- $761,260 · 90% of the amount
Dormer & window restorations for Crailo State Historic Site in Rensselaer CountyOffice of Parks Recreation & Historic PreservationDec 9, 2025 – Aug 26, 2026$418,647
- Description
- Dormer & window restorations for Crailo State Historic Site in Rensselaer County
- Contract number
- D006407
- Type
- Construction: BuildingConstruction
- Term
- Dec 9, 2025 → Aug 26, 20269 months
- Approved
- Dec 9, 2025
- Status
- Ended
- Amount
- $418,647
- Spent to date
- $380,526 · 91% of the amount
Replace concrete terrazzo concourse Empire State Plaza Albany CountyOffice of General Services - Design & ConstructionJan 8, 2025 – Sep 17, 2026$5,951,523
- Description
- Replace concrete terrazzo concourse Empire State Plaza Albany County
- Contract number
- D47148C
- Type
- Construction: BuildingConstruction
- Term
- Jan 8, 2025 → Sep 17, 20261.7 years
- Approved
- Jan 8, 2025
- Status
- Ended
- Amount
- $5,951,523
- Spent to date
- $5,350,444 · 90% of the amount
Rehabilitation of 2 buildings & drainage at Senate House State Historic Site & in Ulster CountyOffice of Parks Recreation & Historic PreservationDec 5, 2024 – May 1, 2026$1,982,740
- Description
- Rehabilitation of 2 buildings & drainage at Senate House State Historic Site & in Ulster County
- Contract number
- D006115
- Type
- Construction: BuildingConstruction
- Term
- Dec 5, 2024 → May 1, 202617 months
- Approved
- Dec 5, 2024
- Status
- Ended
- Amount
- $1,982,740
- Spent to date
- $1,982,740 · 100% of the amount
For repair of 415 state ST facState University of New York - System AdministrationDec 5, 2022 – Sep 1, 2023$197,682
- Description
- For repair of 415 state ST fac
- Contract number
- T003999
- Type
- Contract not subject to state pre-auditNot pre-audited
- Term
- Dec 5, 2022 → Sep 1, 20239 months
- Approved
- Dec 1, 2022
- Status
- Ended
- Amount
- $197,682
- Spent to date
- $197,682 · 100% of the amount
Pathway improvements Senate House State Historic Site Ulster CountyOffice of Parks Recreation & Historic PreservationNov 9, 2022 – May 8, 2023$265,040
- Description
- Pathway improvements Senate House State Historic Site Ulster County
- Contract number
- D005882
- Type
- Construction: HighwayConstruction
- Term
- Nov 9, 2022 → May 8, 20236 months
- Approved
- Nov 9, 2022
- Status
- Ended
- Amount
- $265,040
- Spent to date
- $265,040 · 100% of the amount
Rehabilitate Kitchen Floor Building 3 Green Haven CF Dutchess CountyOffice of General Services - Design & ConstructionMar 29, 2022 – Mar 12, 2026$1,709,671
- Description
- Rehabilitate Kitchen Floor Building 3 Green Haven CF Dutchess County
- Contract number
- DM3097C
- Type
- Construction: BuildingConstruction
- Term
- Mar 29, 2022 → Mar 12, 20263.9 years
- Approved
- Mar 29, 2022
- Status
- Ended
- Amount
- $1,709,671
- Spent to date
- $1,567,465 · 92% of the amount
Repair Roll Up Door Green Haven Correctional Facility Dutchess CountyOffice of General Services - Design & ConstructionDec 6, 2021 – Jul 4, 2022$150,000
- Description
- Repair Roll Up Door Green Haven Correctional Facility Dutchess County
- Contract number
- DEE723C
- Type
- Construction: BuildingConstruction
- Term
- Dec 6, 2021 → Jul 4, 20227 months
- Approved
- Dec 30, 2021
- Status
- Ended
- Amount
- $150,000
- Spent to date
- $31,917 · 21% of the amount
Rehab Bathrooms & Showers Bldgs Gen Construction 2 15 & 22 Green Haven CF Dutchess CountyOffice of General Services - Design & ConstructionMar 26, 2020 – Sep 25, 2023$2,480,845
- Description
- Rehab Bathrooms & Showers Bldgs Gen Construction 2 15 & 22 Green Haven CF Dutchess County
- Contract number
- D45054C
- Type
- Construction: BuildingConstruction
- Term
- Mar 26, 2020 → Sep 25, 20233.5 years
- Approved
- Mar 26, 2020
- Status
- Ended
- Amount
- $2,480,845
- Spent to date
- $2,480,832 · 100% of the amount
Replace Exterior Doors Cultural Education Center Empire State Plaza Albany CountyOffice of General Services - Design & ConstructionJul 26, 2019 – Nov 11, 2020$634,718
- Description
- Replace Exterior Doors Cultural Education Center Empire State Plaza Albany County
- Contract number
- D45778C
- Type
- Construction: BuildingConstruction
- Term
- Jul 26, 2019 → Nov 11, 202016 months
- Approved
- Jul 26, 2019
- Status
- Ended
- Amount
- $634,718
- Spent to date
- $629,094 · 99% of the amount
Project SA Spa 2015-03 Arcade Ceilings & Roof Repairs Phase II Hall of SpringsOffice of Parks Recreation & Historic PreservationNov 2, 2017 – Nov 2, 2018$384,020
- Description
- Project SA Spa 2015-03 Arcade Ceilings & Roof Repairs Phase II Hall of Springs
- Contract number
- D004978
- Type
- Construction: BuildingConstruction
- Term
- Nov 2, 2017 → Nov 2, 201812 months
- Approved
- Nov 2, 2017
- Status
- Ended
- Amount
- $384,020
- Spent to date
- $384,020 · 100% of the amount
Plaza Level Masonry Repairs ESP, Albany County (GC)Office of General Services - Design & ConstructionJul 6, 2017 – Nov 17, 2020$2,000,000
- Description
- Plaza Level Masonry Repairs ESP, Albany County (GC)
- Contract number
- D45487C
- Type
- Construction: BuildingConstruction
- Term
- Jul 6, 2017 → Nov 17, 20203.3 years
- Approved
- Jul 6, 2017
- Status
- Ended
- Amount
- $2,000,000
- Spent to date
- $1,996,361 · 100% of the amount
Rehabilitate Exterior Stairs Madison Ave. Plaza Level ESP (Albany) Albany CountyOffice of General Services - Design & ConstructionMay 8, 2017 – Aug 2, 2018$1,654,907
- Description
- Rehabilitate Exterior Stairs Madison Ave. Plaza Level ESP (Albany) Albany County
- Contract number
- D45432C
- Type
- Construction: BuildingConstruction
- Term
- May 8, 2017 → Aug 2, 201815 months
- Approved
- May 8, 2017
- Status
- Ended
- Amount
- $1,654,907
- Spent to date
- $1,654,615 · 100% of the amount
Victoria Pool Stairs Rehabilitation, Saratoga Spa State ParkOffice of Parks Recreation & Historic PreservationJan 22, 2016 – May 13, 2016$48,875
- Description
- Victoria Pool Stairs Rehabilitation, Saratoga Spa State Park
- Contract number
- D004784
- Type
- Construction: BuildingConstruction
- Term
- Jan 22, 2016 → May 13, 20164 months
- Approved
- Jan 22, 2016
- Status
- Ended
- Amount
- $48,875
- Spent to date
- $48,875 · 100% of the amount
Construction services for projCollege at OneontaJun 7, 2014 – Mar 15, 2015$166,055
- Description
- Construction services for proj
- Contract number
- T990349
- Type
- Contract not subject to state pre-auditNot pre-audited
- Agency
- College at Oneonta
- Term
- Jun 7, 2014 → Mar 15, 20159 months
- Approved
- Jun 11, 2014
- Status
- Ended
- Amount
- $166,055
- Spent to date
- $166,055 · 100% of the amount
Construction services for projCollege at OneontaMay 1, 2014 – Jan 31, 2015$163,447
- Description
- Construction services for proj
- Contract number
- T990335
- Type
- Contract not subject to state pre-auditNot pre-audited
- Agency
- College at Oneonta
- Term
- May 1, 2014 → Jan 31, 20159 months
- Approved
- Mar 19, 2014
- Status
- Ended
- Amount
- $163,447
- Spent to date
- $163,447 · 100% of the amount
Replace floor drains east wing DOT maintenance headquarters camillus onondaga countyOffice of General Services - Design & ConstructionApr 22, 2014 – Nov 18, 2014$64,975
- Description
- Replace floor drains east wing DOT maintenance headquarters camillus onondaga county
- Contract number
- D44899C
- Type
- Construction: BuildingConstruction
- Term
- Apr 22, 2014 → Nov 18, 20147 months
- Approved
- Apr 22, 2014
- Status
- Ended
- Amount
- $64,975
- Spent to date
- $64,229 · 99% of the amount
Repair floor, powerhouse, BLDG. no. 17 mid state CFOffice of General Services - Design & ConstructionAug 2, 2011 – Jul 1, 2012$143,492
- Description
- Repair floor, powerhouse, BLDG. no. 17 mid state CF
- Contract number
- D44106C
- Type
- Construction: BuildingConstruction
- Term
- Aug 2, 2011 → Jul 1, 201211 months
- Approved
- Aug 2, 2011
- Status
- Ended
- Amount
- $143,492
- Spent to date
- $142,243 · 99% of the amount
Construction project #m09386 - schumacher hall stair repairs south stair: remove & replace 22College at OneontaMay 23, 2011 – Mar 23, 2012$57,615
- Description
- Construction project #m09386 - schumacher hall stair repairs south stair: remove & replace 22
- Contract number
- T990236
- Type
- Contract not subject to state pre-auditNot pre-audited
- Agency
- College at Oneonta
- Term
- May 23, 2011 → Mar 23, 201210 months
- Approved
- Mar 1, 2012
- Status
- Ended
- Amount
- $57,615
- Spent to date
- $57,615 · 100% of the amount
Repair steam tunnel floor MT mcgregor CFOffice of General Services - Design & ConstructionNov 16, 2009 – Jan 10, 2011$334,070
- Description
- Repair steam tunnel floor MT mcgregor CF
- Contract number
- D43394C
- Type
- Construction: BuildingConstruction
- Term
- Nov 16, 2009 → Jan 10, 201114 months
- Approved
- Aug 6, 2010
- Status
- Ended
- Amount
- $334,070
- Spent to date
- $331,761 · 99% of the amount
Contract-type mix
Share of contract value by type
- Construction16 contracts$19.1M
- Contract not subject to state pre-audit4 contracts$584.8K
Contracts over time
Contracts started per year
View as table
| Year | Contracts |
|---|---|
| 2009: 1 contracts, $334.1K | 1 |
| 2010: 0 contracts, $0.0 | 0 |
| 2011: 2 contracts, $201.1K | 2 |
| 2012: 0 contracts, $0.0 | 0 |
| 2013: 0 contracts, $0.0 | 0 |
| 2014: 3 contracts, $394.5K | 3 |
| 2015: 0 contracts, $0.0 | 0 |
| 2016: 1 contracts, $48.9K | 1 |
| 2017: 3 contracts, $4.0M | 3 |
| 2018: 0 contracts, $0.0 | 0 |
| 2019: 1 contracts, $634.7K | 1 |
| 2020: 1 contracts, $2.5M | 1 |
| 2021: 2 contracts, $997.7K | 2 |
| 2022: 3 contracts, $2.2M | 3 |
| 2023: 0 contracts, $0.0 | 0 |
| 2024: 1 contracts, $2.0M | 1 |
| 2025: 2 contracts, $6.4M | 2 |
| 2026: 0 contracts, $0.0 | 0 |
How the Contractor Score adds up
Extensive (A, 95/100): $20M in contracts, 1 active contract.
- Contract volume+12.4measured
$20M in current contract value across 20 contracts, more than 90% of scored contractors.
- Recent activity+11.6measured
1 active contract today; the most recent was approved in December 2025.
- Agency breadth+8.3measured
Contracts with 4 different state agencies and facilities.
- Experience+1.6measured
First contract started in November 2009 (16 years of contract history).
- Contract-type mix+6.2measured
3 contract types; the largest group is construction (97% of value). Goods and services contracts are 97% of the total.
- Spending vs. value0.0measured
On 19 completed contracts with spending recorded, spending is 95% of the contract value. Spending below the full value is common (work can finish under budget) and isn't treated as a problem.
- Federal award history0.0unknown
No federal award history found. Scored as neutral.
- Federal registration+5.2measured
Registered to do business with the federal government (registration active).
50 + contributions = 95 (A, Extensive)Starts at 50. Bars: cool adds, warm subtracts.
Agencies served
Contract value with each agency or facility
Similar contractors
- A
Mid-State Industries LTD
Schenectady, NYConstruction & Renovation
Since 201011 agencies
- Contract value
- $24.8M
- Contracts
- 43
- Active
- 1
- A
Digesare Mechanical Inc
Construction & Renovation
Since 200810 agencies
- Contract value
- $264.4M
- Contracts
- 156
- Active
- 11
- B
Aktor Corporation
Construction & Renovation
Since 20154 agencies
- Contract value
- $25.1M
- Contracts
- 30
- Active
- 0
- A
RB Robinson Contracting Inc
Construction & Renovation
Since 20146 agencies
- Contract value
- $14.4M
- Contracts
- 14
- Active
- 0
- A
Pulver Roofing Co Inc
Construction & Renovation
Since 20118 agencies
- Contract value
- $13.4M
- Contracts
- 23
- Active
- 2
- A
Diekow Electric Inc
Construction & Renovation
Since 20114 agencies
- Contract value
- $10.6M
- Contracts
- 16
- Active
- 2
- More construction & renovation contractors Ranked by contract value
Browse more
- Office of General Services - Design & Construction contractors
- Office of Parks Recreation & Historic Preservation contractors
- College at Oneonta contractors
- State University of New York - System Administration contractors
- Construction & Renovation contractors
- Top contractors
- All contractors
Contract figures are public New York State contract records as of Nov 13, 2026: current contract amounts and spending to date as reported. Company details are shown when we can match this contractor to a registered business with confidence.
RFP Detector is an independent service and is not affiliated with any government agency. Scores are informational.