Polaris Electrical Construction Corp
AState contracts since 2018Updated Nov 13, 2026
Polaris Electrical Construction Corp holds 20 contracts worth $7.1M with 2 New York State agencies, most with Office of General Services - Design & Construction; 4 active today. The first started in 2018.
- Total contract value
- $7.1M
- Current contract amounts
- Spent to date
- $5.8M
- 81% of contract value
- Active contracts
- 4
- $1.5M in active value
- Contracts on record
- 20
- Since 2018
- Agencies served
- 2
- Most with Office of General Services - Design & Construction
- Years active
- 8
- First contract 2018
Contact & company
Business information and how to reach the company.
Contracts
20 contracts with New York State agencies, active first. Open a row for the full record.
| Details | Contract | Type | Contract no. | Term | |||||
|---|---|---|---|---|---|---|---|---|---|
Digital electronic scoreboard installation in Bronx County D202255Construction: BuildingActive | Maritime College | Construction: BuildingConstruction | D202255 | Feb 19, 2026to Dec 31, 2026 | Feb 19, 2026 | Dec 31, 2026 | $219,145$165,015 spent | $165,015 | |
Replace floor fan coil units in Building 60 at Creedmoor Psychiatric Center in Suffolk County D47257EConstruction: BuildingActive | Office of General Services - Design & Construction | Construction: BuildingConstruction | D47257E | Dec 30, 2024to Feb 14, 2027 | Dec 30, 2024 | Feb 14, 2027 | $184,623$73,544 spent | $73,544 | |
Rehabilitate 8 passenger & 1 freight elevators at AC Powell State OB in New York County D46181EConstruction: BuildingActive | Office of General Services - Design & Construction | Construction: BuildingConstruction | D46181E | Mar 14, 2024to Aug 21, 2027 | Mar 14, 2024 | Aug 21, 2027 | $928,697$631,884 spent | $631,884 | |
Replace induction units in Building 80 Sagamore Children's Psychiatric Center Suffolk County D47045EConstruction: BuildingActive | Office of General Services - Design & Construction | Construction: BuildingConstruction | D47045E | Jun 27, 2023to Mar 16, 2027 | Jun 27, 2023 | Mar 16, 2027 | $184,081$67,606 spent | $67,606 | |
Replace HVAC at Region 10 DOT garage in Central Islip in Suffolk County D47695EConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D47695E | May 5, 2025to Feb 25, 2026 | May 5, 2025 | Feb 25, 2026 | $128,553$125,813 spent | $125,813 | |
Restore electrical service at Bethpage State Park in Nassau County DEF363EConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEF363E | Apr 22, 2025to Aug 20, 2025 | Apr 22, 2025 | Aug 20, 2025 | $300,000$194,909 spent | $194,909 | |
Replace handicap ramps at Buildings 19 & 20 Pilgrim Psychiatric Center in Suffolk County D47242EConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D47242E | Aug 1, 2023to Dec 5, 2024 | Aug 1, 2023 | Dec 5, 2024 | $49,878$46,257 spent | $46,257 | |
Install switchgear at State University of New York Stonybrook Suffolk County DEE955EConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEE955E | Mar 2, 2023to May 30, 2024 | Mar 2, 2023 | May 30, 2024 | $550,000$525,986 spent | $525,986 | |
Pave front parking lot & northwest gravel lot Sagamore Children's PC Suffolk County D46120EConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D46120E | Dec 14, 2022to Dec 28, 2023 | Dec 14, 2022 | Dec 28, 2023 | $111,133$97,112 spent | $97,112 | |
Relocate transformer & add secondary feeder to bldgs 5,120 & 131 at Pilgrim PC in Suffolk County D46061EConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D46061E | Dec 24, 2021to Jan 17, 2025 | Dec 24, 2021 | Jan 17, 2025 | $261,342$237,907 spent | $237,907 | |
Providing emergency generators for bldgs 45 47 56 at Pilgrim PC Suffolk Co D46060EConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D46060E | Nov 9, 2021to May 31, 2024 | Nov 9, 2021 | May 31, 2024 | $535,301$512,816 spent | $512,816 | |
Repair flood damage SUNY Stonybrook DEE637EConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEE637E | Sep 28, 2021to Dec 31, 2023 | Sep 28, 2021 | Dec 31, 2023 | $1,500,000$1,495,388 spent | $1,495,388 | |
Replace Fan Coil Units Building 80 Sagamore CPC Nassau & Suffolk Counties D45914EConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D45914E | Jul 30, 2020to Sep 24, 2022 | Jul 30, 2020 | Sep 24, 2022 | $106,203$105,797 spent | $105,797 | |
Repair fire damage Kingsboro ATC parking garage 754 Lexington Ave Brooklyn Kings County DEE288EConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEE288E | Mar 5, 2020to Sep 1, 2020 | Mar 5, 2020 | Sep 1, 2020 | $100,000$26,372 spent | $26,372 | |
Provide Office Space Pavement Marking Crew Facility Suffolk County D45771EConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D45771E | Feb 21, 2020to Apr 21, 2021 | Feb 21, 2020 | Apr 21, 2021 | $141,836$141,829 spent | $141,829 | |
Repair Electrical Distribution System Bldg 80 Sagamore Childrens Psychiatric Center Suffolk County DEE135EConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEE135E | Jul 8, 2019to Nov 5, 2019 | Jul 8, 2019 | Nov 5, 2019 | $300,000$4,799 spent | $4,799 | |
Building Upgrades DOT Region 10 Nassau County D45489EConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D45489E | Jul 1, 2019to Dec 16, 2020 | Jul 1, 2019 | Dec 16, 2020 | $819,488$819,344 spent | $819,344 | |
Electrical construction servic T190040Contract not subject to state pre-audit | Maritime College | Contract not subject to state pre-auditNot pre-audited | T190040 | Jun 10, 2019to Feb 21, 2020 | Jun 10, 2019 | Feb 21, 2020 | $138,109$132,999 spent | $132,999 | |
Electrical Rehab Shower Rooms Bldg 40 Creedmoor PC Queens County D45255EConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D45255E | Oct 18, 2018to Mar 31, 2021 | Oct 18, 2018 | Mar 31, 2021 | $413,629$267,751 spent | $267,751 | |
Install tie-switch, Bldg. 40, Creedmore PC - North Campus, Queens County D45253EConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D45253E | Mar 1, 2018to Nov 22, 2018 | Mar 1, 2018 | Nov 22, 2018 | $151,971$130,971 spent | $130,971 |
Digital electronic scoreboard installation in Bronx CountyMaritime CollegeFeb 19, 2026 – Dec 31, 2026Active$219,145
- Description
- Digital electronic scoreboard installation in Bronx County
- Contract number
- D202255
- Type
- Construction: BuildingConstruction
- Agency
- Maritime College
- Term
- Feb 19, 2026 → Dec 31, 202610 months
- Approved
- Feb 19, 2026
- Status
- Active
- Amount
- $219,145
- Spent to date
- $165,015 · 75% of the amount
Replace floor fan coil units in Building 60 at Creedmoor Psychiatric Center in Suffolk CountyOffice of General Services - Design & ConstructionDec 30, 2024 – Feb 14, 2027Active$184,623
- Description
- Replace floor fan coil units in Building 60 at Creedmoor Psychiatric Center in Suffolk County
- Contract number
- D47257E
- Type
- Construction: BuildingConstruction
- Term
- Dec 30, 2024 → Feb 14, 20272.1 years
- Approved
- Dec 30, 2024
- Status
- Active
- Amount
- $184,623
- Spent to date
- $73,544 · 40% of the amount
Rehabilitate 8 passenger & 1 freight elevators at AC Powell State OB in New York CountyOffice of General Services - Design & ConstructionMar 14, 2024 – Aug 21, 2027Active$928,697
- Description
- Rehabilitate 8 passenger & 1 freight elevators at AC Powell State OB in New York County
- Contract number
- D46181E
- Type
- Construction: BuildingConstruction
- Term
- Mar 14, 2024 → Aug 21, 20273.4 years
- Approved
- Mar 14, 2024
- Status
- Active
- Amount
- $928,697
- Spent to date
- $631,884 · 68% of the amount
Replace induction units in Building 80 Sagamore Children's Psychiatric Center Suffolk CountyOffice of General Services - Design & ConstructionJun 27, 2023 – Mar 16, 2027Active$184,081
- Description
- Replace induction units in Building 80 Sagamore Children's Psychiatric Center Suffolk County
- Contract number
- D47045E
- Type
- Construction: BuildingConstruction
- Term
- Jun 27, 2023 → Mar 16, 20273.8 years
- Approved
- Jun 27, 2023
- Status
- Active
- Amount
- $184,081
- Spent to date
- $67,606 · 37% of the amount
Replace HVAC at Region 10 DOT garage in Central Islip in Suffolk CountyOffice of General Services - Design & ConstructionMay 5, 2025 – Feb 25, 2026$128,553
- Description
- Replace HVAC at Region 10 DOT garage in Central Islip in Suffolk County
- Contract number
- D47695E
- Type
- Construction: BuildingConstruction
- Term
- May 5, 2025 → Feb 25, 202610 months
- Approved
- May 5, 2025
- Status
- Ended
- Amount
- $128,553
- Spent to date
- $125,813 · 98% of the amount
Restore electrical service at Bethpage State Park in Nassau CountyOffice of General Services - Design & ConstructionApr 22, 2025 – Aug 20, 2025$300,000
- Description
- Restore electrical service at Bethpage State Park in Nassau County
- Contract number
- DEF363E
- Type
- Construction: BuildingConstruction
- Term
- Apr 22, 2025 → Aug 20, 20254 months
- Approved
- May 7, 2025
- Status
- Ended
- Amount
- $300,000
- Spent to date
- $194,909 · 65% of the amount
Replace handicap ramps at Buildings 19 & 20 Pilgrim Psychiatric Center in Suffolk CountyOffice of General Services - Design & ConstructionAug 1, 2023 – Dec 5, 2024$49,878
- Description
- Replace handicap ramps at Buildings 19 & 20 Pilgrim Psychiatric Center in Suffolk County
- Contract number
- D47242E
- Type
- Construction: BuildingConstruction
- Term
- Aug 1, 2023 → Dec 5, 202416 months
- Approved
- Aug 1, 2023
- Status
- Ended
- Amount
- $49,878
- Spent to date
- $46,257 · 93% of the amount
Install switchgear at State University of New York Stonybrook Suffolk CountyOffice of General Services - Design & ConstructionMar 2, 2023 – May 30, 2024$550,000
- Description
- Install switchgear at State University of New York Stonybrook Suffolk County
- Contract number
- DEE955E
- Type
- Construction: BuildingConstruction
- Term
- Mar 2, 2023 → May 30, 202415 months
- Approved
- Mar 28, 2023
- Status
- Ended
- Amount
- $550,000
- Spent to date
- $525,986 · 96% of the amount
Pave front parking lot & northwest gravel lot Sagamore Children's PC Suffolk CountyOffice of General Services - Design & ConstructionDec 14, 2022 – Dec 28, 2023$111,133
- Description
- Pave front parking lot & northwest gravel lot Sagamore Children's PC Suffolk County
- Contract number
- D46120E
- Type
- Construction: BuildingConstruction
- Term
- Dec 14, 2022 → Dec 28, 202312 months
- Approved
- Dec 14, 2022
- Status
- Ended
- Amount
- $111,133
- Spent to date
- $97,112 · 87% of the amount
Relocate transformer & add secondary feeder to bldgs 5,120 & 131 at Pilgrim PC in Suffolk CountyOffice of General Services - Design & ConstructionDec 24, 2021 – Jan 17, 2025$261,342
- Description
- Relocate transformer & add secondary feeder to bldgs 5,120 & 131 at Pilgrim PC in Suffolk County
- Contract number
- D46061E
- Type
- Construction: BuildingConstruction
- Term
- Dec 24, 2021 → Jan 17, 20253.1 years
- Approved
- Dec 24, 2021
- Status
- Ended
- Amount
- $261,342
- Spent to date
- $237,907 · 91% of the amount
Providing emergency generators for bldgs 45 47 56 at Pilgrim PC Suffolk CoOffice of General Services - Design & ConstructionNov 9, 2021 – May 31, 2024$535,301
- Description
- Providing emergency generators for bldgs 45 47 56 at Pilgrim PC Suffolk Co
- Contract number
- D46060E
- Type
- Construction: BuildingConstruction
- Term
- Nov 9, 2021 → May 31, 20242.6 years
- Approved
- Nov 9, 2021
- Status
- Ended
- Amount
- $535,301
- Spent to date
- $512,816 · 96% of the amount
Repair flood damage SUNY StonybrookOffice of General Services - Design & ConstructionSep 28, 2021 – Dec 31, 2023$1,500,000
- Description
- Repair flood damage SUNY Stonybrook
- Contract number
- DEE637E
- Type
- Construction: BuildingConstruction
- Term
- Sep 28, 2021 → Dec 31, 20232.3 years
- Approved
- Nov 1, 2021
- Status
- Ended
- Amount
- $1,500,000
- Spent to date
- $1,495,388 · 100% of the amount
Replace Fan Coil Units Building 80 Sagamore CPC Nassau & Suffolk CountiesOffice of General Services - Design & ConstructionJul 30, 2020 – Sep 24, 2022$106,203
- Description
- Replace Fan Coil Units Building 80 Sagamore CPC Nassau & Suffolk Counties
- Contract number
- D45914E
- Type
- Construction: BuildingConstruction
- Term
- Jul 30, 2020 → Sep 24, 20222.2 years
- Approved
- Jul 30, 2020
- Status
- Ended
- Amount
- $106,203
- Spent to date
- $105,797 · 100% of the amount
Repair fire damage Kingsboro ATC parking garage 754 Lexington Ave Brooklyn Kings CountyOffice of General Services - Design & ConstructionMar 5, 2020 – Sep 1, 2020$100,000
- Description
- Repair fire damage Kingsboro ATC parking garage 754 Lexington Ave Brooklyn Kings County
- Contract number
- DEE288E
- Type
- Construction: BuildingConstruction
- Term
- Mar 5, 2020 → Sep 1, 20206 months
- Approved
- Jul 30, 2020
- Status
- Ended
- Amount
- $100,000
- Spent to date
- $26,372 · 26% of the amount
Provide Office Space Pavement Marking Crew Facility Suffolk CountyOffice of General Services - Design & ConstructionFeb 21, 2020 – Apr 21, 2021$141,836
- Description
- Provide Office Space Pavement Marking Crew Facility Suffolk County
- Contract number
- D45771E
- Type
- Construction: BuildingConstruction
- Term
- Feb 21, 2020 → Apr 21, 202114 months
- Approved
- Feb 21, 2020
- Status
- Ended
- Amount
- $141,836
- Spent to date
- $141,829 · 100% of the amount
Repair Electrical Distribution System Bldg 80 Sagamore Childrens Psychiatric Center Suffolk CountyOffice of General Services - Design & ConstructionJul 8, 2019 – Nov 5, 2019$300,000
- Description
- Repair Electrical Distribution System Bldg 80 Sagamore Childrens Psychiatric Center Suffolk County
- Contract number
- DEE135E
- Type
- Construction: BuildingConstruction
- Term
- Jul 8, 2019 → Nov 5, 20194 months
- Approved
- Oct 3, 2019
- Status
- Ended
- Amount
- $300,000
- Spent to date
- $4,799 · 2% of the amount
Building Upgrades DOT Region 10 Nassau CountyOffice of General Services - Design & ConstructionJul 1, 2019 – Dec 16, 2020$819,488
- Description
- Building Upgrades DOT Region 10 Nassau County
- Contract number
- D45489E
- Type
- Construction: BuildingConstruction
- Term
- Jul 1, 2019 → Dec 16, 20201.5 years
- Approved
- Jul 1, 2019
- Status
- Ended
- Amount
- $819,488
- Spent to date
- $819,344 · 100% of the amount
Electrical construction servicMaritime CollegeJun 10, 2019 – Feb 21, 2020$138,109
- Description
- Electrical construction servic
- Contract number
- T190040
- Type
- Contract not subject to state pre-auditNot pre-audited
- Agency
- Maritime College
- Term
- Jun 10, 2019 → Feb 21, 20208 months
- Approved
- Jul 9, 2019
- Status
- Ended
- Amount
- $138,109
- Spent to date
- $132,999 · 96% of the amount
Electrical Rehab Shower Rooms Bldg 40 Creedmoor PC Queens CountyOffice of General Services - Design & ConstructionOct 18, 2018 – Mar 31, 2021$413,629
- Description
- Electrical Rehab Shower Rooms Bldg 40 Creedmoor PC Queens County
- Contract number
- D45255E
- Type
- Construction: BuildingConstruction
- Term
- Oct 18, 2018 → Mar 31, 20212.4 years
- Approved
- Oct 18, 2018
- Status
- Ended
- Amount
- $413,629
- Spent to date
- $267,751 · 65% of the amount
Install tie-switch, Bldg. 40, Creedmore PC - North Campus, Queens CountyOffice of General Services - Design & ConstructionMar 1, 2018 – Nov 22, 2018$151,971
- Description
- Install tie-switch, Bldg. 40, Creedmore PC - North Campus, Queens County
- Contract number
- D45253E
- Type
- Construction: BuildingConstruction
- Term
- Mar 1, 2018 → Nov 22, 20189 months
- Approved
- Mar 1, 2018
- Status
- Ended
- Amount
- $151,971
- Spent to date
- $130,971 · 86% of the amount
Contract-type mix
Share of contract value by type
- Construction: Building19 contracts$7.0M
- Contract not subject to state pre-audit1 contract$138.1K
Contracts over time
Contracts started per year
View as table
| Year | Contracts |
|---|---|
| 2018: 2 contracts, $565.6K | 2 |
| 2019: 3 contracts, $1.3M | 3 |
| 2020: 3 contracts, $348.0K | 3 |
| 2021: 3 contracts, $2.3M | 3 |
| 2022: 1 contracts, $111.1K | 1 |
| 2023: 3 contracts, $784.0K | 3 |
| 2024: 2 contracts, $1.1M | 2 |
| 2025: 2 contracts, $428.6K | 2 |
| 2026: 1 contracts, $219.1K | 1 |
How the Contractor Score adds up
Extensive (A, 82/100): 4 active contracts, $7.1M in contracts.
- Contract volume+9.2measured
$7.1M in current contract value across 20 contracts, more than 83% of scored contractors.
- Recent activity+15.9measured
4 active contracts today; the most recent was approved in February 2026.
- Agency breadth+4.3measured
Contracts with 2 different state agencies and facilities.
- Experience−2.7measured
First contract started in March 2018 (8 years of contract history).
- Contract-type mix+5.1measured
2 contract types; the largest group is construction (98% of value). Goods and services contracts are 98% of the total.
- Spending vs. value−0.2measured
On 16 completed contracts with spending recorded, spending is 87% of the contract value. Spending below the full value is common (work can finish under budget) and isn't treated as a problem.
- Federal award history0.0unknown
No federal award history found. Scored as neutral.
- Federal registration0.0unknown
No federal contractor registration found. Scored as neutral.
50 + contributions = 82 (A, Extensive)Starts at 50. Bars: cool adds, warm subtracts.
Agencies served
Contract value with each agency or facility
Similar contractors
- A
Petrillo Contracting Inc
Mount Vernon, NYConstruction & Renovation
Since 20113 agencies
- Contract value
- $4.7M
- Contracts
- 3
- Active
- 1
- A
Centennial Elevator Industries Inc
Construction & Renovation
Since 199810 agencies
- Contract value
- $14.7M
- Contracts
- 18
- Active
- 0
- C
Icon Contracting Group Inc
Construction & Renovation
Since 20173 agencies
- Contract value
- $2.9M
- Contracts
- 3
- Active
- 0
- A
Elevated Technologies Inc.
Construction & Renovation
Since 20226 agencies
- Contract value
- $25.7M
- Contracts
- 7
- Active
- 4
- A
Niko Development Corporation
West Hempstead, NYConstruction & Renovation
Since 20103 agencies
- Contract value
- $31.8M
- Contracts
- 33
- Active
- 3
- B
Tdi Construction Inc
Construction & Renovation
Since 20154 agencies
- Contract value
- $1.4M
- Contracts
- 4
- Active
- 0
- More construction & renovation contractors Ranked by contract value
Browse more
- Office of General Services - Design & Construction contractors
- Maritime College contractors
- Construction & Renovation contractors
- Top contractors
- All contractors
Contract figures are public New York State contract records as of Nov 13, 2026: current contract amounts and spending to date as reported. Company details are shown when we can match this contractor to a registered business with confidence.
RFP Detector is an independent service and is not affiliated with any government agency. Scores are informational.