Quackenbush Co Inc
AState contracts since 2009Updated Nov 13, 2026
Quackenbush Co Inc holds 26 contracts worth $54.1M with 4 New York State agencies, most with SUNY at Buffalo; 3 active today. The first started in 2009.
- Total contract value
- $54.1M
- Current contract amounts
- Spent to date
- $34.5M
- 64% of contract value
- Active contracts
- 3
- $16.2M in active value
- Contracts on record
- 26
- Since 2009
- Agencies served
- 4
- Most with SUNY at Buffalo
- Years active
- 17
- First contract 2009
Contact & company
Business information and how to reach the company.
Phone
Address
Contracts
26 contracts with New York State agencies, active first. Open a row for the full record.
| Details | Contract | Type | Contract no. | Term | |||||
|---|---|---|---|---|---|---|---|---|---|
HVAC steam and mechanical emergency and routine services C001449Service: Building servicesActive | SUNY at Buffalo | Service: Building servicesService | C001449 | Aug 1, 2026to Jul 31, 2029 | Aug 1, 2026 | Jul 31, 2029 | $15,424,665$0 spent | $0 | |
HVAC and mechanical work for connected and autonomous vehicle enclosure in Erie County D000098Construction: BuildingActive | SUNY at Buffalo | Construction: BuildingConstruction | D000098 | Sep 15, 2025to Oct 2, 2027 | Sep 15, 2025 | Oct 2, 2027 | $361,000$315,345 spent | $315,345 | |
Vacuum pump replacement for Squire Hall in Erie County D000092Construction: UtilitiesActive | SUNY at Buffalo | Construction: UtilitiesConstruction | D000092 | Jun 12, 2025to Jan 30, 2027 | Jun 12, 2025 | Jan 30, 2027 | $387,120$387,120 spent | $387,120 | |
Slee Hall air handling unit replacement at SUNY Buffalo D000041Construction: Utilities | SUNY at Buffalo | Construction: UtilitiesConstruction | D000041 | Jun 15, 2023to Aug 10, 2025 | Jun 15, 2023 | Aug 10, 2025 | $907,462$907,462 spent | $907,462 | |
HVAC, steam and mechanical emergency and routine services C001329Service: Building services | SUNY at Buffalo | Service: Building servicesService | C001329 | Aug 1, 2022to Jul 31, 2026 | Aug 1, 2022 | Jul 31, 2026 | $11,551,174$9,789,310 spent | $9,789,310 | |
Install above ground heating system & replace underground hot water lines Lakeview CF Chautauqua Co D46048HConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D46048H | Mar 28, 2022to Dec 31, 2025 | Mar 28, 2022 | Dec 31, 2025 | $14,064,145$14,059,074 spent | $14,059,074 | |
2019-179 Squire 1ST floor HVAC T500160Contract not subject to state pre-audit | SUNY at Buffalo | Contract not subject to state pre-auditNot pre-audited | T500160 | Mar 15, 2022to Jun 1, 2024 | Mar 15, 2022 | Jun 1, 2024 | $263,012$263,012 spent | $263,012 | |
2021-031 Upgrade chilled water T500157Contract not subject to state pre-audit | SUNY at Buffalo | Contract not subject to state pre-auditNot pre-audited | T500157 | Mar 2, 2022to May 1, 2024 | Mar 2, 2022 | May 1, 2024 | $175,385$175,385 spent | $175,385 | |
Repair/replace failed chiller Albion CF Orleans County Region 7 DEE597HConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEE597H | Jul 7, 2021to Jul 2, 2023 | Jul 7, 2021 | Jul 2, 2023 | $400,000$390,786 spent | $390,786 | |
HVAC/Steam/Mechanical Emergency and Routine Services C001277Service: Building services | SUNY at Buffalo | Service: Building servicesService | C001277 | Jul 1, 2019to Jun 30, 2022 | Jul 1, 2019 | Jun 30, 2022 | $2,964,142$2,215,632 spent | $2,215,632 | |
Project 2018-187 chemical stor T500113Contract not subject to state pre-audit | SUNY at Buffalo | Contract not subject to state pre-auditNot pre-audited | T500113 | May 15, 2019to Mar 2, 2020 | May 15, 2019 | Mar 2, 2020 | $244,901$244,901 spent | $244,901 | |
Samc laboratory exhaust fan (l T180198Contract not subject to state pre-audit | College at Buffalo | Contract not subject to state pre-auditNot pre-audited | T180198 | May 13, 2019to Dec 31, 2019 | May 13, 2019 | Dec 31, 2019 | $25,315$25,315 spent | $25,315 | |
Samc damper installations T180156Contract not subject to state pre-audit | College at Buffalo | Contract not subject to state pre-auditNot pre-audited | T180156 | Jul 9, 2018to Nov 30, 2018 | Jul 9, 2018 | Nov 30, 2018 | $9,645$9,645 spent | $9,645 | |
New ductless split system for T170152Contract not subject to state pre-audit | College at Buffalo | Contract not subject to state pre-auditNot pre-audited | T170152 | May 4, 2018to Sep 30, 2018 | May 4, 2018 | Sep 30, 2018 | $7,314$7,314 spent | $7,314 | |
Repair air handler units 3&4, Bldg. 132, Attica CF, Wyoming Cnty. DED419HConstruction: Miscellaneous | Office of General Services - Design & Construction | Construction: MiscellaneousConstruction | DED419H | Feb 9, 2017to May 18, 2018 | Feb 9, 2017 | May 18, 2018 | $300,000$246,637 spent | $246,637 | |
Investigate/Repair Outside Sewer Valve Buffalo Armory Erie County DED346PConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DED346P | Nov 15, 2016to May 14, 2017 | Nov 15, 2016 | May 14, 2017 | $100,000$11,412 spent | $11,412 | |
HVAC/steam/mechanical emergency and routine services C001258Service: Building services | SUNY at Buffalo | Service: Building servicesService | C001258 | Apr 1, 2016to Mar 31, 2021 | Apr 1, 2016 | Mar 31, 2021 | $2,947,308$2,444,377 spent | $2,444,377 | |
Rehab rockwell hall HVAC syste T140043Contract not subject to state pre-audit | College at Buffalo | Contract not subject to state pre-auditNot pre-audited | T140043 | Feb 6, 2015to Oct 1, 2015 | Feb 6, 2015 | Oct 1, 2015 | $1,502,000$751,000 spent | $751,000 | |
Replace leaking underground heat lines orleans CF DEC441HConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEC441H | Sep 10, 2013to Nov 19, 2015 | Sep 10, 2013 | Nov 19, 2015 | $300,000$201,226 spent | $201,226 | |
Restore underground heat hot water lines orleans correctional facility DEC279HConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEC279H | Mar 19, 2013to Jan 31, 2014 | Mar 19, 2013 | Jan 31, 2014 | $300,000$294,660 spent | $294,660 |
HVAC steam and mechanical emergency and routine servicesSUNY at BuffaloAug 1, 2026 – Jul 31, 2029Active$15,424,665
- Description
- HVAC steam and mechanical emergency and routine services
- Contract number
- C001449
- Type
- Service: Building servicesService
- Agency
- SUNY at Buffalo
- Term
- Aug 1, 2026 → Jul 31, 20293 years
- Approved
- Oct 21, 2026
- Status
- Active
- Amount
- $15,424,665
- Spent to date
- $0 · 0% of the amount
HVAC and mechanical work for connected and autonomous vehicle enclosure in Erie CountySUNY at BuffaloSep 15, 2025 – Oct 2, 2027Active$361,000
- Description
- HVAC and mechanical work for connected and autonomous vehicle enclosure in Erie County
- Contract number
- D000098
- Type
- Construction: BuildingConstruction
- Agency
- SUNY at Buffalo
- Term
- Sep 15, 2025 → Oct 2, 20272.1 years
- Approved
- Sep 15, 2025
- Status
- Active
- Amount
- $361,000
- Spent to date
- $315,345 · 87% of the amount
Vacuum pump replacement for Squire Hall in Erie CountySUNY at BuffaloJun 12, 2025 – Jan 30, 2027Active$387,120
- Description
- Vacuum pump replacement for Squire Hall in Erie County
- Contract number
- D000092
- Type
- Construction: UtilitiesConstruction
- Agency
- SUNY at Buffalo
- Term
- Jun 12, 2025 → Jan 30, 20271.7 years
- Approved
- Jun 12, 2025
- Status
- Active
- Amount
- $387,120
- Spent to date
- $387,120 · 100% of the amount
Slee Hall air handling unit replacement at SUNY BuffaloSUNY at BuffaloJun 15, 2023 – Aug 10, 2025$907,462
- Description
- Slee Hall air handling unit replacement at SUNY Buffalo
- Contract number
- D000041
- Type
- Construction: UtilitiesConstruction
- Agency
- SUNY at Buffalo
- Term
- Jun 15, 2023 → Aug 10, 20252.2 years
- Approved
- Jun 15, 2023
- Status
- Ended
- Amount
- $907,462
- Spent to date
- $907,462 · 100% of the amount
HVAC, steam and mechanical emergency and routine servicesSUNY at BuffaloAug 1, 2022 – Jul 31, 2026$11,551,174
- Description
- HVAC, steam and mechanical emergency and routine services
- Contract number
- C001329
- Type
- Service: Building servicesService
- Agency
- SUNY at Buffalo
- Term
- Aug 1, 2022 → Jul 31, 20264 years
- Approved
- Sep 9, 2022
- Status
- Ended
- Amount
- $11,551,174
- Spent to date
- $9,789,310 · 85% of the amount
Install above ground heating system & replace underground hot water lines Lakeview CF Chautauqua CoOffice of General Services - Design & ConstructionMar 28, 2022 – Dec 31, 2025$14,064,145
- Description
- Install above ground heating system & replace underground hot water lines Lakeview CF Chautauqua Co
- Contract number
- D46048H
- Type
- Construction: BuildingConstruction
- Term
- Mar 28, 2022 → Dec 31, 20253.8 years
- Approved
- Mar 28, 2022
- Status
- Ended
- Amount
- $14,064,145
- Spent to date
- $14,059,074 · 100% of the amount
2019-179 Squire 1ST floor HVACSUNY at BuffaloMar 15, 2022 – Jun 1, 2024$263,012
- Description
- 2019-179 Squire 1ST floor HVAC
- Contract number
- T500160
- Type
- Contract not subject to state pre-auditNot pre-audited
- Agency
- SUNY at Buffalo
- Term
- Mar 15, 2022 → Jun 1, 20242.3 years
- Approved
- May 2, 2022
- Status
- Ended
- Amount
- $263,012
- Spent to date
- $263,012 · 100% of the amount
2021-031 Upgrade chilled waterSUNY at BuffaloMar 2, 2022 – May 1, 2024$175,385
- Description
- 2021-031 Upgrade chilled water
- Contract number
- T500157
- Type
- Contract not subject to state pre-auditNot pre-audited
- Agency
- SUNY at Buffalo
- Term
- Mar 2, 2022 → May 1, 20242.2 years
- Approved
- Mar 21, 2022
- Status
- Ended
- Amount
- $175,385
- Spent to date
- $175,385 · 100% of the amount
Repair/replace failed chiller Albion CF Orleans County Region 7Office of General Services - Design & ConstructionJul 7, 2021 – Jul 2, 2023$400,000
- Description
- Repair/replace failed chiller Albion CF Orleans County Region 7
- Contract number
- DEE597H
- Type
- Construction: BuildingConstruction
- Term
- Jul 7, 2021 → Jul 2, 20232 years
- Approved
- Aug 17, 2021
- Status
- Ended
- Amount
- $400,000
- Spent to date
- $390,786 · 98% of the amount
HVAC/Steam/Mechanical Emergency and Routine ServicesSUNY at BuffaloJul 1, 2019 – Jun 30, 2022$2,964,142
- Description
- HVAC/Steam/Mechanical Emergency and Routine Services
- Contract number
- C001277
- Type
- Service: Building servicesService
- Agency
- SUNY at Buffalo
- Term
- Jul 1, 2019 → Jun 30, 20223 years
- Approved
- Jul 1, 2019
- Status
- Ended
- Amount
- $2,964,142
- Spent to date
- $2,215,632 · 75% of the amount
Project 2018-187 chemical storSUNY at BuffaloMay 15, 2019 – Mar 2, 2020$244,901
- Description
- Project 2018-187 chemical stor
- Contract number
- T500113
- Type
- Contract not subject to state pre-auditNot pre-audited
- Agency
- SUNY at Buffalo
- Term
- May 15, 2019 → Mar 2, 202010 months
- Approved
- Jun 7, 2019
- Status
- Ended
- Amount
- $244,901
- Spent to date
- $244,901 · 100% of the amount
Samc laboratory exhaust fan (lCollege at BuffaloMay 13, 2019 – Dec 31, 2019$25,315
- Description
- Samc laboratory exhaust fan (l
- Contract number
- T180198
- Type
- Contract not subject to state pre-auditNot pre-audited
- Agency
- College at Buffalo
- Term
- May 13, 2019 → Dec 31, 20198 months
- Approved
- May 14, 2019
- Status
- Ended
- Amount
- $25,315
- Spent to date
- $25,315 · 100% of the amount
Samc damper installationsCollege at BuffaloJul 9, 2018 – Nov 30, 2018$9,645
- Description
- Samc damper installations
- Contract number
- T180156
- Type
- Contract not subject to state pre-auditNot pre-audited
- Agency
- College at Buffalo
- Term
- Jul 9, 2018 → Nov 30, 20185 months
- Approved
- Jul 10, 2018
- Status
- Ended
- Amount
- $9,645
- Spent to date
- $9,645 · 100% of the amount
New ductless split system forCollege at BuffaloMay 4, 2018 – Sep 30, 2018$7,314
- Description
- New ductless split system for
- Contract number
- T170152
- Type
- Contract not subject to state pre-auditNot pre-audited
- Agency
- College at Buffalo
- Term
- May 4, 2018 → Sep 30, 20185 months
- Approved
- May 5, 2018
- Status
- Ended
- Amount
- $7,314
- Spent to date
- $7,314 · 100% of the amount
Repair air handler units 3&4, Bldg. 132, Attica CF, Wyoming Cnty.Office of General Services - Design & ConstructionFeb 9, 2017 – May 18, 2018$300,000
- Description
- Repair air handler units 3&4, Bldg. 132, Attica CF, Wyoming Cnty.
- Contract number
- DED419H
- Type
- Construction: MiscellaneousConstruction
- Term
- Feb 9, 2017 → May 18, 201815 months
- Approved
- Mar 13, 2017
- Status
- Ended
- Amount
- $300,000
- Spent to date
- $246,637 · 82% of the amount
Investigate/Repair Outside Sewer Valve Buffalo Armory Erie CountyOffice of General Services - Design & ConstructionNov 15, 2016 – May 14, 2017$100,000
- Description
- Investigate/Repair Outside Sewer Valve Buffalo Armory Erie County
- Contract number
- DED346P
- Type
- Construction: BuildingConstruction
- Term
- Nov 15, 2016 → May 14, 20176 months
- Approved
- Dec 7, 2016
- Status
- Ended
- Amount
- $100,000
- Spent to date
- $11,412 · 11% of the amount
HVAC/steam/mechanical emergency and routine servicesSUNY at BuffaloApr 1, 2016 – Mar 31, 2021$2,947,308
- Description
- HVAC/steam/mechanical emergency and routine services
- Contract number
- C001258
- Type
- Service: Building servicesService
- Agency
- SUNY at Buffalo
- Term
- Apr 1, 2016 → Mar 31, 20215 years
- Approved
- May 11, 2016
- Status
- Ended
- Amount
- $2,947,308
- Spent to date
- $2,444,377 · 83% of the amount
Rehab rockwell hall HVAC systeCollege at BuffaloFeb 6, 2015 – Oct 1, 2015$1,502,000
- Description
- Rehab rockwell hall HVAC syste
- Contract number
- T140043
- Type
- Contract not subject to state pre-auditNot pre-audited
- Agency
- College at Buffalo
- Term
- Feb 6, 2015 → Oct 1, 20158 months
- Approved
- Feb 7, 2015
- Status
- Ended
- Amount
- $1,502,000
- Spent to date
- $751,000 · 50% of the amount
Replace leaking underground heat lines orleans CFOffice of General Services - Design & ConstructionSep 10, 2013 – Nov 19, 2015$300,000
- Description
- Replace leaking underground heat lines orleans CF
- Contract number
- DEC441H
- Type
- Construction: BuildingConstruction
- Term
- Sep 10, 2013 → Nov 19, 20152.2 years
- Approved
- Oct 17, 2013
- Status
- Ended
- Amount
- $300,000
- Spent to date
- $201,226 · 67% of the amount
Restore underground heat hot water lines orleans correctional facilityOffice of General Services - Design & ConstructionMar 19, 2013 – Jan 31, 2014$300,000
- Description
- Restore underground heat hot water lines orleans correctional facility
- Contract number
- DEC279H
- Type
- Construction: BuildingConstruction
- Term
- Mar 19, 2013 → Jan 31, 201410 months
- Approved
- Apr 29, 2013
- Status
- Ended
- Amount
- $300,000
- Spent to date
- $294,660 · 98% of the amount
Contract-type mix
Share of contract value by type
- Service: Building services4 contracts$32.9M
- Construction14 contracts$18.7M
- Contract not subject to state pre-audit8 contracts$2.5M
Contracts over time
Contracts started per year
View as table
| Year | Contracts |
|---|---|
| 2009: 1 contracts, $300.8K | 1 |
| 2010: 0 contracts, $0.0 | 0 |
| 2011: 1 contracts, $446.6K | 1 |
| 2012: 1 contracts, $200.0K | 1 |
| 2013: 5 contracts, $1.5M | 5 |
| 2014: 0 contracts, $0.0 | 0 |
| 2015: 1 contracts, $1.5M | 1 |
| 2016: 2 contracts, $3.0M | 2 |
| 2017: 1 contracts, $300.0K | 1 |
| 2018: 2 contracts, $17.0K | 2 |
| 2019: 3 contracts, $3.2M | 3 |
| 2020: 0 contracts, $0.0 | 0 |
| 2021: 1 contracts, $400.0K | 1 |
| 2022: 4 contracts, $26.1M | 4 |
| 2023: 1 contracts, $907.5K | 1 |
| 2024: 0 contracts, $0.0 | 0 |
| 2025: 2 contracts, $748.1K | 2 |
| 2026: 1 contracts, $15.4M | 1 |
How the Contractor Score adds up
Extensive (A, 99/100): 3 active contracts, $54M in contracts.
- Contract volume+15.7measured
$54M in current contract value across 26 contracts, more than 95% of scored contractors.
- Recent activity+16.2measured
3 active contracts today; the most recent was approved in October 2026.
- Agency breadth+8.3measured
Contracts with 4 different state agencies and facilities.
- Experience+1.7measured
First contract started in July 2009 (17 years of contract history).
- Contract-type mix+7.3measured
5 contract types; the largest group is services (61% of value). Goods and services contracts are 95% of the total.
- Spending vs. value−0.1measured
On 23 completed contracts with spending recorded, spending is 89% of the contract value. Spending below the full value is common (work can finish under budget) and isn't treated as a problem.
- Federal award history0.0unknown
No federal award history found. Scored as neutral.
- Federal registration0.0unknown
No federal contractor registration found. Scored as neutral.
50 + contributions = 99 (A, Extensive)Starts at 50. Bars: cool adds, warm subtracts.
Agencies served
Contract value with each agency or facility
Similar contractors
- A
DCB Elevator Co Inc
Lewiston, NYFacilities, Maintenance & Janitorial
Since 200612 agencies
- Contract value
- $28.9M
- Contracts
- 32
- Active
- 6
- A
Schindler Elevator Corp
Morristown, NJFacilities, Maintenance & Janitorial
Since 200249 agencies
- Contract value
- $191.0M
- Contracts
- 125
- Active
- 14
- A
TK Elevator Corporation
Facilities, Maintenance & Janitorial
Since 200640 agencies
- Contract value
- $28.5M
- Contracts
- 69
- Active
- 2
- B
Epic Contracting of Orchard Park Inc
Facilities, Maintenance & Janitorial
Since 20103 agencies
- Contract value
- $4.5M
- Contracts
- 6
- Active
- 0
- C
Goodwin Electric Corporation
Facilities, Maintenance & Janitorial
Since 20113 agencies
- Contract value
- $3.8M
- Contracts
- 4
- Active
- 0
- A
Hinck Electrical Contractor Inc
Bohemia, NYFacilities, Maintenance & Janitorial
Since 20074 agencies
- Contract value
- $81.6M
- Contracts
- 28
- Active
- 2
- More facilities, maintenance & janitorial contractors Ranked by contract value
Browse more
- SUNY at Buffalo contractors
- Office of General Services - Design & Construction contractors
- College at Buffalo contractors
- State University Construction Fund contractors
- Facilities, Maintenance & Janitorial contractors
- Top contractors
- All contractors
Contract figures are public New York State contract records as of Nov 13, 2026: current contract amounts and spending to date as reported. Company details are shown when we can match this contractor to a registered business with confidence.
RFP Detector is an independent service and is not affiliated with any government agency. Scores are informational.