S&L Electric Inc
AColton, NY State contracts since 2009Updated Nov 13, 2026
S&L Electric Inc holds 35 contracts worth $11.2M with 6 New York State agencies, most with Office of General Services - Design & Construction; 2 active today. The first started in 2009.
- Total contract value
- $11.2M
- Current contract amounts
- Spent to date
- $9.1M
- 81% of contract value
- Active contracts
- 2
- $492.9K in active value
- Contracts on record
- 35
- Since 2009
- Agencies served
- 6
- Most with Office of General Services - Design & Construction
- Years active
- 17
- First contract 2009
Contact & company
Business information and how to reach the company.
Phone
Address
- Legal name
- S & L Electric Inc.Doing business as S & L Electric Inc
- Identifiers
- UEI MJAJJ2JG5BY3 · CAGE 0VF87
- Federal registration
- Active · renews by Jan 2027
- In business since
- 1978
Industry codes (NAICS)
- 238210Electrical Contractors and Other Wiring Installation Contractors
Leadership
Jeremy M Bronson
Secretary/Treasurer
Darcy L Burns
Office Manager
Thomas E Potter Jr
President
Contracts
35 contracts with New York State agencies, active first. Open a row for the full record.
| Details | Contract | Type | Contract no. | Term | |||||
|---|---|---|---|---|---|---|---|---|---|
Replace Boiler Controls at Riverview Correctional Facility in St Lawrence County DQ2007EConstruction: BuildingActive | Office of General Services - Design & Construction | Construction: BuildingConstruction | DQ2007E | Nov 2, 2026to Feb 21, 2028 | Nov 2, 2026 | Feb 21, 2028 | $77,900$0 spent | $0 | |
Campus wide metering upgrade SUNY Canton in St Lawrence County D860307Construction: BuildingActive | College of Technology at Canton | Construction: BuildingConstruction | D860307 | May 1, 2026to Feb 1, 2027 | May 1, 2026 | Feb 1, 2027 | $415,000$234,569 spent | $234,569 | |
Restore electrical failures Cape Vincent Correctional Facility in Jefferson County DEF462VConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEF462V | Nov 17, 2025to May 31, 2026 | Nov 17, 2025 | May 31, 2026 | $300,000$16,713 spent | $16,713 | |
Install security cameras Cape Vincent Correctional Facility Jefferson County DEF383EConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEF383E | Aug 28, 2025to May 31, 2026 | Aug 28, 2025 | May 31, 2026 | $500,000$314,717 spent | $314,717 | |
Installation of security cameras in St. Lawrence County D000882Construction: Miscellaneous | College at Potsdam | Construction: MiscellaneousConstruction | D000882 | Aug 28, 2025to Sep 22, 2025 | Aug 28, 2025 | Sep 22, 2025 | $297,000$297,000 spent | $297,000 | |
Replace chiller units in the Hospital Bldg 156 at Clinton CF in Clinton County DM3212EConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DM3212E | Jun 25, 2025to May 25, 2026 | Jun 25, 2025 | May 25, 2026 | $38,900$37,000 spent | $37,000 | |
Replace boiler at Valcour Comfort Station DOT Region 7 in Clinton County D47647EConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D47647E | May 5, 2025to Feb 1, 2026 | May 5, 2025 | Feb 1, 2026 | $67,185$61,740 spent | $61,740 | |
Network cabling installation T000846Contract not subject to state pre-audit | College at Potsdam | Contract not subject to state pre-auditNot pre-audited | T000846 | Jun 24, 2024to Jul 29, 2024 | Jun 24, 2024 | Jul 29, 2024 | $33,000$33,000 spent | $33,000 | |
Repair fire alarm system at Gouverneur CF in St Lawrence County DEF088FConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEF088F | Oct 31, 2023to May 28, 2024 | Oct 31, 2023 | May 28, 2024 | $750,000$277,814 spent | $277,814 | |
Repair elevators in Buildings 8 9 & 11 Upstate CF in Franklin County DM3188EConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DM3188E | Sep 8, 2023to May 21, 2025 | Sep 8, 2023 | May 21, 2025 | $79,945$78,246 spent | $78,246 | |
Provide classrooms & office space Bldg 28 Res Rehab Unit Gouverneur CF St. Lawrence County D46132EConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D46132E | Aug 14, 2020to Apr 14, 2022 | Aug 14, 2020 | Apr 14, 2022 | $752,426$725,616 spent | $725,616 | |
Comfort Station Replacement Eel Weir State Park St. Lawrence County D005611Construction: Building | Office of Parks Recreation & Historic Preservation | Construction: BuildingConstruction | D005611 | Oct 24, 2019to Jul 31, 2020 | Oct 24, 2019 | Jul 31, 2020 | $59,123$59,123 spent | $59,123 | |
Restore Power Lost Feeder Riverview Correctional Facility Ogdensburg St Lawrence County DEE171VConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEE171V | Aug 30, 2019to Dec 28, 2019 | Aug 30, 2019 | Dec 28, 2019 | $300,000$6,886 spent | $6,886 | |
Construct 7 Replacement Restrooms in Campgrounds Higley Flow State Park E Trade D005412Construction: Building | Office of Parks Recreation & Historic Preservation | Construction: BuildingConstruction | D005412 | Dec 13, 2018to Aug 16, 2019 | Dec 13, 2018 | Aug 16, 2019 | $154,400$154,400 spent | $154,400 | |
NYSDOT/NYS Police Comm Vehicle Insp & Hwy Safety Ops Facility I-87 T/O Chaplain Clinton County (E) D263607Construction: Building | Department of Transportation | Construction: BuildingConstruction | D263607 | May 11, 2018to Dec 31, 2019 | May 11, 2018 | Dec 31, 2019 | $683,615$683,615 spent | $683,615 | |
North Country Welcome Center DOT Region 7 I-81-Exit 50 Collins Landing Rd Orleans Jefferson County D45766EConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D45766E | Mar 2, 2018to Jul 19, 2019 | Mar 2, 2018 | Jul 19, 2019 | $1,886,560$1,724,293 spent | $1,724,293 | |
Investigate/Restore Power, Vet Tech Bldg SUNY Canton St Lawrence County DED657VConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DED657V | Nov 22, 2017to Mar 22, 2018 | Nov 22, 2017 | Mar 22, 2018 | $200,000$6,001 spent | $6,001 | |
L23113 residence life emergenc T860221Contract not subject to state pre-audit | College of Technology at Canton | Contract not subject to state pre-auditNot pre-audited | T860221 | May 30, 2017to Jul 31, 2017 | May 30, 2017 | Jul 31, 2017 | $54,738$54,738 spent | $54,738 | |
Investigate/repair/replace main electric utility circuit, franklin CF DED276VConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DED276V | Aug 16, 2016to Dec 14, 2016 | Aug 16, 2016 | Dec 14, 2016 | $100,000$7,351 spent | $7,351 | |
Rehabilitate Kitchen Gouverneur CF St Lawrence County D44975EConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D44975E | Mar 18, 2016to Apr 5, 2017 | Mar 18, 2016 | Apr 5, 2017 | $115,732$114,754 spent | $114,754 |
Replace Boiler Controls at Riverview Correctional Facility in St Lawrence CountyOffice of General Services - Design & ConstructionNov 2, 2026 – Feb 21, 2028Active$77,900
- Description
- Replace Boiler Controls at Riverview Correctional Facility in St Lawrence County
- Contract number
- DQ2007E
- Type
- Construction: BuildingConstruction
- Term
- Nov 2, 2026 → Feb 21, 202816 months
- Approved
- Nov 2, 2026
- Status
- Active
- Amount
- $77,900
- Spent to date
- $0 · 0% of the amount
Campus wide metering upgrade SUNY Canton in St Lawrence CountyCollege of Technology at CantonMay 1, 2026 – Feb 1, 2027Active$415,000
- Description
- Campus wide metering upgrade SUNY Canton in St Lawrence County
- Contract number
- D860307
- Type
- Construction: BuildingConstruction
- Term
- May 1, 2026 → Feb 1, 20279 months
- Approved
- May 1, 2026
- Status
- Active
- Amount
- $415,000
- Spent to date
- $234,569 · 57% of the amount
Restore electrical failures Cape Vincent Correctional Facility in Jefferson CountyOffice of General Services - Design & ConstructionNov 17, 2025 – May 31, 2026$300,000
- Description
- Restore electrical failures Cape Vincent Correctional Facility in Jefferson County
- Contract number
- DEF462V
- Type
- Construction: BuildingConstruction
- Term
- Nov 17, 2025 → May 31, 20266 months
- Approved
- Dec 31, 2025
- Status
- Ended
- Amount
- $300,000
- Spent to date
- $16,713 · 6% of the amount
Install security cameras Cape Vincent Correctional Facility Jefferson CountyOffice of General Services - Design & ConstructionAug 28, 2025 – May 31, 2026$500,000
- Description
- Install security cameras Cape Vincent Correctional Facility Jefferson County
- Contract number
- DEF383E
- Type
- Construction: BuildingConstruction
- Term
- Aug 28, 2025 → May 31, 20269 months
- Approved
- Sep 30, 2025
- Status
- Ended
- Amount
- $500,000
- Spent to date
- $314,717 · 63% of the amount
Installation of security cameras in St. Lawrence CountyCollege at PotsdamAug 28, 2025 – Sep 22, 2025$297,000
- Description
- Installation of security cameras in St. Lawrence County
- Contract number
- D000882
- Type
- Construction: MiscellaneousConstruction
- Agency
- College at Potsdam
- Term
- Aug 28, 2025 → Sep 22, 20251 month
- Approved
- Aug 28, 2025
- Status
- Ended
- Amount
- $297,000
- Spent to date
- $297,000 · 100% of the amount
Replace chiller units in the Hospital Bldg 156 at Clinton CF in Clinton CountyOffice of General Services - Design & ConstructionJun 25, 2025 – May 25, 2026$38,900
- Description
- Replace chiller units in the Hospital Bldg 156 at Clinton CF in Clinton County
- Contract number
- DM3212E
- Type
- Construction: BuildingConstruction
- Term
- Jun 25, 2025 → May 25, 202611 months
- Approved
- Jun 25, 2025
- Status
- Ended
- Amount
- $38,900
- Spent to date
- $37,000 · 95% of the amount
Replace boiler at Valcour Comfort Station DOT Region 7 in Clinton CountyOffice of General Services - Design & ConstructionMay 5, 2025 – Feb 1, 2026$67,185
- Description
- Replace boiler at Valcour Comfort Station DOT Region 7 in Clinton County
- Contract number
- D47647E
- Type
- Construction: BuildingConstruction
- Term
- May 5, 2025 → Feb 1, 20269 months
- Approved
- May 5, 2025
- Status
- Ended
- Amount
- $67,185
- Spent to date
- $61,740 · 92% of the amount
Network cabling installationCollege at PotsdamJun 24, 2024 – Jul 29, 2024$33,000
- Description
- Network cabling installation
- Contract number
- T000846
- Type
- Contract not subject to state pre-auditNot pre-audited
- Agency
- College at Potsdam
- Term
- Jun 24, 2024 → Jul 29, 20241 month
- Approved
- Jun 21, 2024
- Status
- Ended
- Amount
- $33,000
- Spent to date
- $33,000 · 100% of the amount
Repair fire alarm system at Gouverneur CF in St Lawrence CountyOffice of General Services - Design & ConstructionOct 31, 2023 – May 28, 2024$750,000
- Description
- Repair fire alarm system at Gouverneur CF in St Lawrence County
- Contract number
- DEF088F
- Type
- Construction: BuildingConstruction
- Term
- Oct 31, 2023 → May 28, 20247 months
- Approved
- Jan 12, 2024
- Status
- Ended
- Amount
- $750,000
- Spent to date
- $277,814 · 37% of the amount
Repair elevators in Buildings 8 9 & 11 Upstate CF in Franklin CountyOffice of General Services - Design & ConstructionSep 8, 2023 – May 21, 2025$79,945
- Description
- Repair elevators in Buildings 8 9 & 11 Upstate CF in Franklin County
- Contract number
- DM3188E
- Type
- Construction: BuildingConstruction
- Term
- Sep 8, 2023 → May 21, 20251.7 years
- Approved
- Sep 8, 2023
- Status
- Ended
- Amount
- $79,945
- Spent to date
- $78,246 · 98% of the amount
Provide classrooms & office space Bldg 28 Res Rehab Unit Gouverneur CF St. Lawrence CountyOffice of General Services - Design & ConstructionAug 14, 2020 – Apr 14, 2022$752,426
- Description
- Provide classrooms & office space Bldg 28 Res Rehab Unit Gouverneur CF St. Lawrence County
- Contract number
- D46132E
- Type
- Construction: BuildingConstruction
- Term
- Aug 14, 2020 → Apr 14, 20221.7 years
- Approved
- Aug 14, 2020
- Status
- Ended
- Amount
- $752,426
- Spent to date
- $725,616 · 96% of the amount
Comfort Station Replacement Eel Weir State Park St. Lawrence CountyOffice of Parks Recreation & Historic PreservationOct 24, 2019 – Jul 31, 2020$59,123
- Description
- Comfort Station Replacement Eel Weir State Park St. Lawrence County
- Contract number
- D005611
- Type
- Construction: BuildingConstruction
- Term
- Oct 24, 2019 → Jul 31, 20209 months
- Approved
- Oct 24, 2019
- Status
- Ended
- Amount
- $59,123
- Spent to date
- $59,123 · 100% of the amount
Restore Power Lost Feeder Riverview Correctional Facility Ogdensburg St Lawrence CountyOffice of General Services - Design & ConstructionAug 30, 2019 – Dec 28, 2019$300,000
- Description
- Restore Power Lost Feeder Riverview Correctional Facility Ogdensburg St Lawrence County
- Contract number
- DEE171V
- Type
- Construction: BuildingConstruction
- Term
- Aug 30, 2019 → Dec 28, 20194 months
- Approved
- Oct 11, 2019
- Status
- Ended
- Amount
- $300,000
- Spent to date
- $6,886 · 2% of the amount
Construct 7 Replacement Restrooms in Campgrounds Higley Flow State Park E TradeOffice of Parks Recreation & Historic PreservationDec 13, 2018 – Aug 16, 2019$154,400
- Description
- Construct 7 Replacement Restrooms in Campgrounds Higley Flow State Park E Trade
- Contract number
- D005412
- Type
- Construction: BuildingConstruction
- Term
- Dec 13, 2018 → Aug 16, 20198 months
- Approved
- Dec 13, 2018
- Status
- Ended
- Amount
- $154,400
- Spent to date
- $154,400 · 100% of the amount
NYSDOT/NYS Police Comm Vehicle Insp & Hwy Safety Ops Facility I-87 T/O Chaplain Clinton County (E)Department of TransportationMay 11, 2018 – Dec 31, 2019$683,615
- Description
- NYSDOT/NYS Police Comm Vehicle Insp & Hwy Safety Ops Facility I-87 T/O Chaplain Clinton County (E)
- Contract number
- D263607
- Type
- Construction: BuildingConstruction
- Term
- May 11, 2018 → Dec 31, 20191.7 years
- Approved
- May 11, 2018
- Status
- Ended
- Amount
- $683,615
- Spent to date
- $683,615 · 100% of the amount
North Country Welcome Center DOT Region 7 I-81-Exit 50 Collins Landing Rd Orleans Jefferson CountyOffice of General Services - Design & ConstructionMar 2, 2018 – Jul 19, 2019$1,886,560
- Description
- North Country Welcome Center DOT Region 7 I-81-Exit 50 Collins Landing Rd Orleans Jefferson County
- Contract number
- D45766E
- Type
- Construction: BuildingConstruction
- Term
- Mar 2, 2018 → Jul 19, 201917 months
- Approved
- Mar 2, 2018
- Status
- Ended
- Amount
- $1,886,560
- Spent to date
- $1,724,293 · 91% of the amount
Investigate/Restore Power, Vet Tech Bldg SUNY Canton St Lawrence CountyOffice of General Services - Design & ConstructionNov 22, 2017 – Mar 22, 2018$200,000
- Description
- Investigate/Restore Power, Vet Tech Bldg SUNY Canton St Lawrence County
- Contract number
- DED657V
- Type
- Construction: BuildingConstruction
- Term
- Nov 22, 2017 → Mar 22, 20184 months
- Approved
- Jan 8, 2018
- Status
- Ended
- Amount
- $200,000
- Spent to date
- $6,001 · 3% of the amount
L23113 residence life emergencCollege of Technology at CantonMay 30, 2017 – Jul 31, 2017$54,738
- Description
- L23113 residence life emergenc
- Contract number
- T860221
- Type
- Contract not subject to state pre-auditNot pre-audited
- Term
- May 30, 2017 → Jul 31, 20172 months
- Approved
- Jul 13, 2017
- Status
- Ended
- Amount
- $54,738
- Spent to date
- $54,738 · 100% of the amount
Investigate/repair/replace main electric utility circuit, franklin CFOffice of General Services - Design & ConstructionAug 16, 2016 – Dec 14, 2016$100,000
- Description
- Investigate/repair/replace main electric utility circuit, franklin CF
- Contract number
- DED276V
- Type
- Construction: BuildingConstruction
- Term
- Aug 16, 2016 → Dec 14, 20164 months
- Approved
- Oct 5, 2016
- Status
- Ended
- Amount
- $100,000
- Spent to date
- $7,351 · 7% of the amount
Rehabilitate Kitchen Gouverneur CF St Lawrence CountyOffice of General Services - Design & ConstructionMar 18, 2016 – Apr 5, 2017$115,732
- Description
- Rehabilitate Kitchen Gouverneur CF St Lawrence County
- Contract number
- D44975E
- Type
- Construction: BuildingConstruction
- Term
- Mar 18, 2016 → Apr 5, 201713 months
- Approved
- Mar 18, 2016
- Status
- Ended
- Amount
- $115,732
- Spent to date
- $114,754 · 99% of the amount
Contract-type mix
Share of contract value by type
- Construction31 contracts$9.8M
- Contract not subject to state pre-audit4 contracts$1.4M
Contracts over time
Contracts started per year
View as table
| Year | Contracts |
|---|---|
| 2009: 3 contracts, $635.2K | 3 |
| 2010: 3 contracts, $1.4M | 3 |
| 2011: 0 contracts, $0.0 | 0 |
| 2012: 1 contracts, $150.0K | 1 |
| 2013: 3 contracts, $179.8K | 3 |
| 2014: 1 contracts, $278.3K | 1 |
| 2015: 4 contracts, $1.7M | 4 |
| 2016: 2 contracts, $215.7K | 2 |
| 2017: 2 contracts, $254.7K | 2 |
| 2018: 3 contracts, $2.7M | 3 |
| 2019: 2 contracts, $359.1K | 2 |
| 2020: 1 contracts, $752.4K | 1 |
| 2021: 0 contracts, $0.0 | 0 |
| 2022: 0 contracts, $0.0 | 0 |
| 2023: 2 contracts, $829.9K | 2 |
| 2024: 1 contracts, $33.0K | 1 |
| 2025: 5 contracts, $1.2M | 5 |
| 2026: 2 contracts, $492.9K | 2 |
How the Contractor Score adds up
Extensive (A, 98/100): 2 active contracts, $11M in contracts.
- Contract volume+10.6measured
$11M in current contract value across 35 contracts, more than 86% of scored contractors.
- Recent activity+15.0measured
2 active contracts today; the most recent was approved in November 2026.
- Agency breadth+10.3measured
Contracts with 6 different state agencies and facilities.
- Experience+1.8measured
First contract started in May 2009 (17 years of contract history).
- Contract-type mix+5.7measured
3 contract types; the largest group is construction (88% of value). Goods and services contracts are 88% of the total.
- Spending vs. value−0.3measured
On 33 completed contracts with spending recorded, spending is 83% of the contract value. Spending below the full value is common (work can finish under budget) and isn't treated as a problem.
- Federal award history0.0unknown
No federal award history found. Scored as neutral.
- Federal registration+5.2measured
Registered to do business with the federal government (registration active).
50 + contributions = 98 (A, Extensive)Starts at 50. Bars: cool adds, warm subtracts.
Agencies served
Contract value with each agency or facility
- Office of General Services - Design & Construction25 contracts$8.2M
- State University Construction Fund2 contracts$1.3M
- Department of Transportation1 contract$683.6K
- College of Technology at Canton2 contracts$469.7K
- College at Potsdam2 contracts$330.0K
- Office of Parks Recreation & Historic Preservation3 contracts$256.5K
Similar contractors
- A
Murnane Building Contractors
Plattsburgh, NYConstruction & Renovation
Since 200515 agencies
- Contract value
- $519.9M
- Contracts
- 120
- Active
- 9
- A
Hyde-Stone Mechanical Contractors Inc
Watertown, NYConstruction & Renovation
Since 20118 agencies
- Contract value
- $10.6M
- Contracts
- 29
- Active
- 6
- A
PTL Contracting Corp
Theresa, NYConstruction & Renovation
Since 20116 agencies
- Contract value
- $12.8M
- Contracts
- 20
- Active
- 0
- A
Je Sheehan Contracting Corp
Potsdam, NYConstruction & Renovation
Since 20098 agencies
- Contract value
- $20.4M
- Contracts
- 25
- Active
- 3
- A
Continental Construction LLC
Gouverneur, NYConstruction & Renovation
Since 20098 agencies
- Contract value
- $29.9M
- Contracts
- 69
- Active
- 2
- A
Dow Electric Inc
Malone, NYConstruction & Renovation
Since 200810 agencies
- Contract value
- $71.1M
- Contracts
- 116
- Active
- 5
- More construction & renovation contractors Ranked by contract value
Browse more
- Office of General Services - Design & Construction contractors
- State University Construction Fund contractors
- Department of Transportation contractors
- College of Technology at Canton contractors
- Construction & Renovation contractors
- Top contractors
- All contractors
Contract figures are public New York State contract records as of Nov 13, 2026: current contract amounts and spending to date as reported. Company details are shown when we can match this contractor to a registered business with confidence.