Skip to content
FederalSolicitationClosed Federal notice

556-24-113 Oil Transformer and Switch Enclosure Upgrades

Department of Veterans Affairs› 252-NETWORK CONTRACT OFFICE 12 (36C252) Illinois

Solicitation # 36C25226B0029_1Updated Aug 28, 2026

This RFP closed on Sep 9, 2026.

The details below are kept for reference. Similar open RFPs are listed first.

Closed

Sep 9, 2026

Responses were due Sep 9, 2026, 10:00 AM CDT

Posted
Aug 28, 2026
Closed
Sep 9, 2026

Similar open RFPs

Same NAICS group or Construction & Renovation, nearby first, ranked by score.

Strong

Modernize Damen (Bldg. 1) Elevators Construction 537-24-101

Department of Veterans Affairs · Chicago, IL

FederalSolicitationSDVOSB set-asideConstruction & Renovation+1
Posted Aug 18Due Dec 9, 2026, 10:00 AM CST (in 17 days)Federal notice
Fair

Replace Water Tanks FCI Marion Marions, Illinois

Federal Prison System / Bureau of Prisons · Illinois

FederalSolicitationSmall business set-asideConstruction & Renovation+1
Posted Oct 29Due Nov 30, 2026, 10:00 AM CST (in 8 days)Federal notice
Strong

550-20-121 Demo Old Boiler Plant B100 (CON)

Department of Veterans Affairs · Danville, IL

FederalSolicitationSDVOSB set-asideConstruction & Renovation+1
Posted Oct 21Due Dec 2, 2026, 1:00 PM CST (in 10 days)Federal notice

RFP Detector Scores are informational.How we score →

Summary by RFP Detector

What this RFP is about

Department of Veterans Affairs (252-NETWORK CONTRACT OFFICE 12 (36C252)) posted a solicitation titled “556-24-113 Oil Transformer and Switch Enclosure Upgrades” under solicitation number 36C25226B0029_1. It was posted on Aug 28, 2026. The response deadline was Sep 9, 2026, 10:00 AM CDT. It is classified under NAICS 238210 (Electrical Contractors and Other Wiring Installation Contractors) and product/service code Z1DA. The set-aside is listed as Veteran-Owned Small Business Set-Aside (specific to Department of Veterans Affairs). The place of performance is Illinois. The listed point of contact is Lynn H VanderVelde, Contractor.

Key facts

Sector
Federal
Notice type
Solicitation
PSC
Z1DA
Place of performance
Illinois
ZIP 60064
Value
Not statedTypical award in this market ≈ $123.5K
Solicitation #
36C25226B0029_1
Listing
Official federal notice

Score at publication

Score breakdown

Every RFP starts at 50. Each factor adds or subtracts points compared with a typical RFP; unknown data counts as neutral.

Frozen at publication: closed RFPs are not re-scored.

Starts at 50

  • Value−6.7estimated

    No value published. Typical award is about $124K: the median of 447 VA contracts over $25K awarded in NAICS 238210, FY24–FY26.

  • Competition & access+16.7measured

    Veteran-owned small business set-aside (VA). The largest recipient took 6% of these dollars in FY24–FY26, and spending is spread across many vendors.

  • Issuer & market+3.8measured

    VA obligated $323M on NAICS 238210 across 645 contracts in FY24–FY26. 82 other notices from this office in the past 12 months.

  • Time & stage+4.3measured

    Solicitation, bids due: 12 days to respond (due Sep 9, 2026, 10:00 AM CDT).

  • Clarity & completeness+4.4estimated

    Documents not listed, 2 named contacts with email, 672-word description.

  • Freshness+9.0measured

    Posted today.

50 + contributions = 81 (A, Excellent)

Informational, not advice to bid or not bid. Score version 1.0.0, evaluated Aug 28, 2026.

Requirements & submission

Eligibility · Veteran-Owned Small Business Set-Aside (specific to Department of Veterans Affairs)

Veteran-owned small business set-asides (mainly used by the Department of Veterans Affairs) are reserved for small businesses owned and controlled by veterans.

Not stated in a form we could extract. See the official solicitation for requirements, evaluation criteria and submission steps.

From the official notice

Description

672 words

CONSTRUCTION STATEMENT OF WORK Date: September 13, 2025 Project Number: 556-24-113 Project Name: Oil Transformer and Switch Enclosure Upgrade (GC) Location: Captain James A. Lovell FHCC 3001 Green Bay Rd, North Chicago, IL 60064 Part 1: Project Scope of Work Overview: Contractor shall provide all tools, materials, labor, quality assurance, and supervision for renovations resulting in a complete, compliant, and fully-functional project. Replace medium voltage oil-filled transformers that serve the following buildings on the James A. Lovell FHCC campus: 1, 3, 9, 11, 66, 137 and 187. Transformers have 4160 volt primary and 208/120 volt secondary. There are (4) transformers rated for 150 KVA, (2) transformers rated for 300 KVA and (1) transformer rated for 750 KVA. The 150 KVA transformer at building 3 will need to be relocated as well. Replace the electrical distribution switchboard at building 137. Replace the electrical distribution switchboard at building 3. Replace concrete pads for medium voltage oil filled transformers at buildings 9, 66, and 187. New transformer location at building 3 requires a new concrete pad as well. Install anti-ram rated bollards at all transformers. Part 2: Period of Performance: The following model presents the summary logic of the milestone sequence working backward from the delivery date of the longest lead time in the critical path to determine a mobilization date, and then forward from the delivery date of the longest lead time to completion of all work. Listed milestones and phases (calendar days): Notice To Proceed Day 0 Division 01 Submissions Completed Day 14 Division 01 VA Reviews Day 35 Division 02+ Submissions Day 50 Division 02+ VA Reviews Day 71 Longest Lead Item Procurement Day 72 (GC to determine and submit) VA review and GC revise schedule Day 93 Mobilize and Demo Day 94 (If all pre-construction submittals were approved) Pre-Longest Lead Item Construction Day 214 (GC to determine) Longest Lead Item Delivery Date Day 215 (GC to determine) Post Long-Lead Item Construction Day 335 (GC to determine) Construction Complete and Closeouts approved Day 356 Closeout (Contract end date) Day 357 Total: 357 days reflects an example workup of the plan. GC must submit the factory ship date commitment to VA and revise the Baseline Schedule to work forward and backward from that date to optimize the time in field (disruption of customer and reduction of GC costs). Part 3: Detailed Project Requirements: Project Objectives: Contractor is required to expedite planning and execution of this work, enabling the work to start and continue without interruptions caused by failure to procure long lead equipment and plan around the delivery dates This project is required to enable compliant and safe conditions for maintenance of electrical systems. GC and their consulting engineer to plan and execute a robust quality assurance plan and safety plan to prevent time and rework losses. List of AE Documents to be included in this Contract: See: 00 01 10 Table of Contents and the entire Project Manual See: 00 01 15 List of Drawing Sheets and the entire volume of drawings Pre-Bid Conference: VA shall schedule one pre-bid conference to be attended by prospective bidders to observe current conditions within the work area(s). Do not expect additional events to occur. The AE shall not attend the pre-bid event. No questions will be allowed during the event. All questions by all prospective contractors shall follow the RFI process described in the Solicitation. Prospective bidders shall not attempt to contact the AE or VA facilities engineering staff during the solicitation and bidding period. The AE and VA facilities engineering staff are instructed to ignore all such inquiries and report them to the VA Contracting Officer. All inquiries regarding this project shall be presented as complete and coherent Requests for Information (RFI) specifically citing design or specification sections, pages, paragraphs, notes, details, etc. to enable responses to RFI s. Follow the instructions provided by the Contracting Officer within the Solicitation regarding submission of RFI s. VA will post responses developed to enable all prospective bidders to receive the same information at the same time.

Documents

No documents are listed for this notice.

Contacts

2 contacts

Points of contact as published on the notice.

Timeline & history

  1. Solicitation posted

  2. Responses were due

Federal award history

Market context

Department of Veterans Affairs · NAICS 238210 · FY24–FY26

Typical award (over $25K)
$123.5K
Contracts awarded
645
Total obligated
$322.5M
Award size, Department of Veterans Affairs · NAICS 238210 contracts, FY24–FY26 (log scale)
P25 $19.5KMedian $68.3KP75 $203.8KP90 $678.3K

Largest recipients in this market

  • J & J MECHANICAL AND CONSTRUCTION GROUP LLC$19.3M6%
  • SKYTEK LLC$18.7M6%
  • STANDARD COMMUNICATIONS INC$15.6M5%

Recipients of past awards in this market, not the incumbent of this RFP.

View as table
Fiscal yearObligated ($)
FY2022136,512,915.97
FY202395,845,020.31
FY202476,515,759.88
FY202587,762,744.24
FY2026158,259,822.85

Federal contract award records, award types A–D, FY24–FY26. Updated Nov 13, 2026.

More from Department of Veterans Affairs

468 open RFPs from this issuer and its offices.

Limited

Next Generation Sequencing (NGS) Reagent Kits

Department of Veterans Affairs · Iowa City, IA

FederalSources soughtSupplies, Equipment & Furniture
Posted Nov 17Due Nov 22, 2026, 1:00 PM CST (in < 1 h)Federal notice
Limited

FY27 Cxbladder Molecular Diagnostic Testing

Department of Veterans Affairs

FederalSpecial noticeHealthcare & Medical
Posted Nov 16Due Nov 23, 2026, 2:00 AM EST (in 12 h)Federal notice
Limited

Mobile MRI Trailer Lease

Department of Veterans Affairs · Fayetteville, NC

FederalSolicitationSDVOSB set-asideSupplies, Equipment & Furniture+1
Posted Nov 16Due Nov 23, 2026, 8:00 AM EST (in 18 h)Federal notice

RFP Detector Scores are informational.How we score →

About this notice

Official federal notice. Updated Aug 28, 2026.

Official solicitation:Sign in free to open the official solicitation

RFP Detector is an independent service and is not affiliated with any government agency. Scores are informational.

RFP Detector is not affiliated with the organization that issued this RFP. Always rely on the official notice and confirm every date and requirement with the issuer.