Skip to content
FederalCombined synopsisClosed Federal notice

AITC Electrical Engineering Study - Grounding Study and Design (VA-19-00069954)

Department of Veterans Affairs› SAC FREDERICK (36C10X)

Solicitation # 36C10X19Q0237Updated Sep 4, 2019

This RFP closed on Sep 3, 2019.

The details below are kept for reference. Similar open RFPs are listed first.

Closed

Sep 3, 2019

Responses were due Sep 3, 2019, 12:00 AM CDT

Posted
Sep 3, 2019
Closed
Sep 3, 2019

Similar open RFPs

Same NAICS group or Professional & Management Consulting, nearby first, ranked by score.

Strong

Workforce Assessment (VA-27-00016203)

Department of Veterans Affairs

FederalSources soughtProfessional & Management Consulting
Posted Nov 17Due Nov 27, 2026, 12:00 PM EST (in 7 days)Federal notice
Strong

Nga Hrm-II RFP

National Geospatial-Intelligence Agency (NGA) · Springfield, VA

FederalRFPProfessional & Management Consulting
Posted Sep 23Due Dec 9, 2026, 12:30 PM EST (in 19 days)Federal notice
Strong

Human Resources Support

Federal Transit Administration · Washington, DC

FederalSources sought8(a) set-asideProfessional & Management Consulting+1
Posted Nov 18Due Nov 27, 2026, 12:00 PM EST (in 7 days)Federal notice
Strong

Pine Bluff Arsenal Testing, Lab and Engineering Services

Department of the Army · White Hall, AR

FederalCombined synopsisSmall business set-asideEnvironmental & Waste Services+1
Posted Oct 29Due Nov 30, 2026, 12:00 PM CST (in 10 days)Federal notice

RFP Detector Scores are informational.How we score →

Summary by RFP Detector

What this RFP is about

Department of Veterans Affairs (SAC FREDERICK (36C10X)) posted a combined synopsis/solicitation titled “AITC Electrical Engineering Study - Grounding Study and Design (VA-19-00069954)” under solicitation number 36C10X19Q0237. It was first posted on Sep 3, 2019 and has been updated once since. The response deadline was Sep 3, 2019, 12:00 AM CDT. It is classified under NAICS 541611 (Administrative Management and General Management Consulting Services) and product/service code C. No set-aside is listed.

Key facts

Sector
Federal
Notice type
Combined synopsis
As posted: Combined Synopsis/Solicitation
PSC
C
Place of performance
Not stated
Value
Not statedTypical award in this market ≈ $674.0K
Solicitation #
36C10X19Q0237
Listing
Official federal notice

Score at publication

Score breakdown

Every RFP starts at 50. Each factor adds or subtracts points compared with a typical RFP; unknown data counts as neutral.

Frozen at publication: closed RFPs are not re-scored.

Starts at 50

  • Value+1.4estimated

    No value published. Typical award is about $674K: the median of 614 VA contracts over $25K awarded in NAICS 541611, FY24–FY26.

  • Competition & access+3.0measured

    Full and open competition. The largest recipient took 14% of these dollars in FY24–FY26, and spending is spread across many vendors.

  • Issuer & market+6.8measured

    VA obligated $2B on NAICS 541611 across 709 contracts in FY24–FY26. 28 other notices from this office in the past 12 months.

  • Time & stage−14.9measured

    Closed on Sep 3, 2019.

  • Clarity & completeness+3.9estimated

    Documents not listed, contact with email and phone, 1,343-word description.

  • Freshness+9.0measured

    Posted today.

50 + contributions = 59 (C, Fair)

Informational, not advice to bid or not bid. Score version 1.0.0, evaluated Sep 3, 2019.

Requirements & submission

Eligibility · Full and open competition

Full and open competition means the notice states no set-aside: any responsible business can respond, subject to the requirements in the notice.

Not stated in a form we could extract. See the official solicitation for requirements, evaluation criteria and submission steps.

From the official notice

Description

1,343 words

5. PROJECT NUMBER (if applicable) CODE 7. ADMINISTERED BY 2. AMENDMENT/MODIFICATION NUMBER CODE 6. ISSUED BY 8. NAME AND ADDRESS OF CONTRACTOR 4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE 9A. AMENDMENT OF SOLICITATION NUMBER 9B. DATED PAGE OF PAGES 10A. MODIFICATION OF CONTRACT/ORDER NUMBER 10B. DATED BPA NO. 1. CONTRACT ID CODE FACILITY CODE CODE Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers E. IMPORTANT: is extended, (a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended. 12. ACCOUNTING AND APPROPRIATION DATA (REV. 11/2016) is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A. 15C. DATE SIGNED B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b). RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified. C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF: D. OTHER Contractor 16C. DATE SIGNED 14. DESCRIPTION OF AMENDMENT/MODIFICATION 16B. UNITED STATES OF AMERICA Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect. 15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER 15B. CONTRACTOR/OFFEROR STANDARD FORM 30 PREVIOUS EDITION NOT USABLE Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.) (Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.) (If required) (SEE ITEM 11) (SEE ITEM 13) (X) CHECK ONE 13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS, IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT (Signature of person authorized to sign) (Signature of Contracting Officer) 1 4 0003 09-04-2019 None 36C10X Strategic Acquisition Center - Frederick Department of Veterans Affairs 5202 Presidents Court, Suite 103 Frederick MD 21703 36C10X Strategic Acquisition Center - Frederick Department of Veterans Affairs 5202 Presidents Court, Suite 103 Frederick MD 21703 To all Offerors/Bidders 36C10X19Q0237 X X X ** HOUR & DATE for Receipt of Offers is EXTENDED to: 9:00 AM EST, 09/09/2019 See CONTINUATION Page X The purpose of this amendment is to: 1. Provide answers to questions. See following page. Questions and Answers (and Attachments) Is the scope of this analysis to include the data center area in Exhibit B only, or the balance of the facility as well? The entire facility outlined in ORANGE in Exhibit A represents the extent of the grounding design study. How many levels in the facility? 3 Floors and a Diesel Generator/Storage Tank Yard. What is total square footage of the area to be included in the scope of the analysis? 4. How many electric utility services? There are two redundant 12.5kV feeders connected to two Automatic Throw Over (ATO) Switches. These ATOs feed three Power and Distribution System for the VA Facility. The facility and Data Center Power System A shares three 2MVA transformers in one electrical service room internal to the Facility. Power System B has two redundant 2.5MVA transformers and Power System C has two redundant 2.5 MVA transformers. How many standby generators? Four diesel generators on Power System A. Two diesel generators on Power System B. And soon to be installed, two diesel generators on Power System C. Will it be possible to shut down main service switchboards/switchgear and generators to allow for inspection of internal grounding/bonding connections? On a case by case basis only. Are facility drawings such as electrical one-lines, floor plans, grounding details available? If so, in what electronic format? Existing electrical one-line diagram (23-Aug-16) has errors and is out-of-date. A new Electrical One-Line Diagram (red line one-line diagram) was started but only got to about 35% complete. Both are attached. Section 2.4 mentions some electrical engineering tools and test equipment at site that may be used, if necessary. Can you provide specific information on what is available? 3PH Power Quality Logger, Multimeters, and 3x HRC 4 PPE Suits and glove kits. Section 3.1 mentions possibility of limited access to certain areas. Are any of these areas included in the portion of the facility where the grounding analysis will focus? Yes, computer, electrical, and telecom room access is restricted. Security background checks and acknowledgement of rules of behavior must be accomplished first before contractor work can be performed. Can you provide more details about limited access i.e., is access limited to outside of normal business hours, during certain times of each month, etc.? All contractor work shall be performed on a non-interference basis to daily Data Center Operations (Computer, Electrical, Telecom rooms, and Generator/Tank Yard/Alleyway). Visual inspections are allowed in these rooms during normal business hours as well as other assessment activities based upon prior VA approval. De-energizing/re-energizing system equipment work may need to be performed after hours. Contractor work to be performed on the Facility (non-Data Center Operations) shall be accomplished during normal business hours unless required after hours by the VA. A contractor planning and scheduling for all work shall be approved prior to start work at the facility.  New Amendment lists Item A.1 Price/Cost Schedule and A.2 Delivery Schedule. But original RFQ document lists B.3 Price/Cost Schedule with no. of items, which is quite different than posted in amendment. Please clarify which price/cost schedule to be submitted? Are we required to provide total fees of entire scope of work described in this RFQ? Please use B.3 in the original RFQ when submitting pricing. Yes, please submit pricing for entire scope of work described in the RFQ. Could we get a copy of the As Built/Record copy of the existing electrical system on line diagram for us to estimate the effort for grounding study and design? See attachment below. Existing electrical one-line diagram (23-Aug-16) has errors and is out-of-date. Is electronic submission of this offer acceptable? Yes. According to RFQ paragraph 2.5, all engineers are required to be a professional engineer licenses by Texas Board. Our engineers are currently not licensed by Texas board but by several other states. However, if we become successful awardee for this RFQ, we will obtain our Professional Engineer licenses by reciprocity method allowed by Texas board of professional engineer. Please confirm that this will be acceptable in evaluation of our proposal. YES, if reciprocity can be achieved prior to first submittal and all submitted plans, specifications, drawings, and reports associated with this project are signed by an actively licensed electrical PE with Texas stamp. In the Cost Schedule at B.3 are we to provide one-unit price number only or rates and hours by the disciplines provided in each box? The confusion comes from the listing of disciplines within each block but just one line. A simple, single lump sum for each CLIN would be easiest. Yes, a single lump sum for reach CLIN is acceptable. ATTACHMENTS:

Documents

No documents are listed for this notice.

Contacts

Points of contact as published on the notice.

Timeline & history

  1. Responses were due

  2. Combined Synopsis/Solicitation posted

  3. Combined Synopsis/Solicitation posted

Federal award history

Market context

Department of Veterans Affairs · NAICS 541611 · FY24–FY26

Typical award (over $25K)
$674.0K
Contracts awarded
709
Total obligated
$2.0B
Award size, Department of Veterans Affairs · NAICS 541611 contracts, FY24–FY26 (log scale)
P25 $72.2KMedian $431.3KP75 $2.1MP90 $4.1M

Largest recipients in this market

  • DELOITTE CONSULTING LLP$277.3M14%
  • APTIVE HTG LLC$154.0M8%
  • TITAN ALPHA LLC$144.6M7%

Recipients of past awards in this market, not the incumbent of this RFP.

View as table
Fiscal yearObligated ($)
FY2022877,229,328.59
FY20231,010,711,742.87
FY2024871,952,985.94
FY2025471,195,816.33
FY2026698,485,502.87

Federal contract award records, award types A–D, FY24–FY26. Updated Nov 14, 2026.

More from Department of Veterans Affairs

495 open RFPs from this issuer and its offices.

Limited

Halfway House 20 - BED - Base plus Four

Department of Veterans Affairs · Decatur, GA

FederalSources soughtHuman & Social Services
Posted Nov 5Due Nov 20, 2026, 8:30 AM EST (in 2 h)Federal notice
Poor

D and D Laboratory Steam & Water Testing

Department of Veterans Affairs

FederalSolicitationEngineering & Architecture
Posted Oct 29Due Nov 20, 2026, 9:00 AM EST (in 2 h)Federal notice
Not competed

FY27 - LivaNova Sorin S5 PM Intent to Sole Source

Department of Veterans Affairs

FederalSpecial noticeIT & Software
Posted Nov 17Due Nov 20, 2026, 10:00 AM EST (in 3 h)Federal notice
Not competed

Intent to Sole Source Dialysis Equipment PM & Repairs

Department of Veterans Affairs · Durham, NC

FederalSpecial noticeIT & Software
Posted Nov 13Due Nov 20, 2026, 10:00 AM EST (in 3 h)Federal notice
Limited

Gutter Maintenance

Department of Veterans Affairs · Tacoma, WA

FederalSources soughtSmall business set-asideConstruction & Renovation+1
Posted Nov 13Due Nov 20, 2026, 10:00 AM EST (in 3 h)Federal notice

RFP Detector Scores are informational.How we score →

About this notice

Official federal notice. Updated Sep 4, 2019.

Official solicitation:Sign in free to open the official solicitation

RFP Detector is an independent service and is not affiliated with any government agency. Scores are informational.

RFP Detector is not affiliated with the organization that issued this RFP. Always rely on the official notice and confirm every date and requirement with the issuer.