End of the World Long Term Stewardship
Forest Service · Grangeville, ID
Why this score
24 days to respond, clear, complete notice; but small typical award (~$98K).
Solicitation # BA-1617Updated Aug 24, 2026
This RFP closed on Nov 1, 2026.
Nov 1, 2026
Responses were due Nov 1, 2026, 11:00 AM MST
Same NAICS group or Environmental & Waste Services, nearby first, ranked by score.
Forest Service · Grangeville, ID
Why this score
24 days to respond, clear, complete notice; but small typical award (~$98K).
Forest Service · Island Park, ID
Why this score
Not openly competed. Notice signals a sole-source or brand-name intent. The largest recipient took 10% of these dollars in FY24–FY26, and spending is spread across many vendors.
Department of the Army · Florida
Why this score
31 days to respond, small-business set-aside.
Environmental Protection Agency · Atlanta, GA
Why this score
20 days to respond, small-business set-aside; but thin documentation.
Department of the Army · Utah
Why this score
Active buyer ($3.8B FY24–FY26), partial small-business set-aside.
Department of the Army · Monterey, CA
Why this score
Active buyer ($3.8B FY24–FY26), 13 days to respond.
RFP Detector Scores are informational.How we score →
Summary by RFP Detector
Department of Energy (Battelle Energy Alliance–doe Cntr) posted a special notice titled “Available for Licensing: Dimethyl Ether-Driven Rejuvenation Technology for Lithium-Ion Battery Cell Reuse” under solicitation number BA-1617. It was first posted on Jun 18, 2026 and has been updated once since. The response deadline was Nov 1, 2026, 11:00 AM MST. It is classified under NAICS 562920 (Materials Recovery Facilities) and product/service code AG11. No set-aside is listed. The place of performance is Idaho Falls, Idaho. The listed point of contact is Javier Martinez.
Score at publication
Every RFP starts at 50. Each factor adds or subtracts points compared with a typical RFP; unknown data counts as neutral.
Frozen at publication: closed RFPs are not re-scored.
Starts at 50
No value published, and there isn't enough award history to estimate one. Scored as neutral.
Full and open competition.
17 other RFPs from Department of Energy on RFP Detector in the past 12 months; no award history found.
Special notice: 136 days to respond (due Nov 1, 2026, 11:00 AM MST). Long lead time.
Documents not listed, named contact with email, 410-word description.
Posted today.
50 + contributions = 63 (C, Fair)
Informational, not advice to bid or not bid. Score version 1.0.0, evaluated Jun 18, 2026.
Eligibility · Full and open competition
Full and open competition means the notice states no set-aside: any responsible business can respond, subject to the requirements in the notice.
Not stated in a form we could extract. See the official solicitation for requirements, evaluation criteria and submission steps.
From the official notice
Overview This technology introduces a dimethyl ether (DME)-driven method for rejuvenating end-of-life lithium-ion battery (LIB) cells, with the goal of restoring electrochemical performance without dismantling the cell into constituent materials. Conventional LIB recycling requires mechanical disassembly, crushing, and downstream hydrometallurgical or pyrometallurgical separation of anode, cathode, and electrolyte fractions, followed by reconstruction of new components. The DME-driven approach is intended to recondition spent cells so that the existing electrode architecture remains intact and reusable. By acting directly on the assembled cell, the method is designed to recover electrochemical functionality through a substantially simplified process flow. Preliminary electrochemical data generated during development supports the technical feasibility of the approach. If validated at larger scale, the technology may offer a recycling pathway that materially reduces process complexity, capital intensity, and reagent consumption compared with established LIB recycling routes. Industry Need Current LIB recycling infrastructure relies on multi-step processes that consume significant energy and reagents. End-of-life cells are typically shredded, with recovered black mass treated through hydrometallurgical leaching, solvent extraction, or high-temperature pyrometallurgical processing to isolate metals such as lithium, cobalt, nickel, and manganese. These recovered materials must then be reprocessed into battery-grade precursors and reassembled into new cells. The associated unit operations introduce capital cost, operating cost, and environmental burden, and there is presently no commercialized method to recondition or rejuvenate LIB cells or their principal components for direct reuse. As domestic demand for LIB recycling capacity grows, the absence of a lower-intensity reuse pathway constrains the economic and environmental performance of the broader battery circularity sector. Differentiation & Advantages Operates directly on assembled cells, eliminating the need for shredding, separation, and component reconstruction steps required by conventional recycling. Designed to restore electrochemical properties of the existing electrode set, enabling direct electrode reuse rather than raw material recovery. Intended to reduce reagent and energy inputs relative to hydrometallurgical and pyrometallurgical processing. May lower capital and operational requirements for recycling facilities by consolidating multiple unit operations into a single rejuvenation step. Addresses a recycling pathway for which no commercialized equivalent currently exists. Potential Applications Direct rejuvenation of end-of-life LIB cells recovered from consumer electronics, stationary storage, or transportation applications. Integration into existing LIB recycling and reuse facilities as a front-end reconditioning step prior to, or in place of, material recovery. Supporting domestic battery circularity initiatives that prioritize reuse over raw material extraction. Secondary-use battery pathways where partial capacity restoration may extend service life. Reducing the volume of cells entering energy-intensive downstream recycling streams.
No documents are listed for this notice.
Javier Martinez
PrimaryPoints of contact as published on the notice.
1 change since posting.
Special Notice posted
Special Notice posted
Responses were due
Status changed to archived
130 open RFPs from this issuer and its offices.
Department of Energy · Oak Ridge, TN
Why this score
Full and open, new this week; but only less than a day left.
Department of Energy · Los Alamos, NM
Why this score
Active market ($2.1B FY24–FY26), clear, complete notice; but only less than a day left.
Department of Energy · Los Alamos, NM
Why this score
Active market ($138B FY24–FY26); but only less than a day left.
Department of Energy · Menlo Park, CA
Why this score
But only less than a day left.
Department of Energy · Berkeley, CA
Why this score
Recently updated; but only less than a day left.
Department of Energy
Why this score
Small-business set-aside (strong incumbent), active market ($11.5B FY24–FY26); but only 1 day left.
RFP Detector Scores are informational.How we score →
Official federal notice. Updated Aug 24, 2026.
Official solicitation:Sign in free to open the official solicitation
RFP Detector is an independent service and is not affiliated with any government agency. Scores are informational.
RFP Detector is not affiliated with the organization that issued this RFP. Always rely on the official notice and confirm every date and requirement with the issuer.