Market Intelligence Notice – Pre-Engineered Metal Buildings (PEMB)
Department of the Army · Savannah, GA
Why this score
New this week, 24 days to respond.
Solicitation # FY22-C5ISR-CMOSSUpdated Jul 15, 2026Scored Nov 25, 2026
Mar 23
Mar 23, 2027, 4:00 PM EDT
Summary by RFP Detector
Department of the Army (W6QK ACC-APG), part of the Department of Defense, posted a special notice titled “C5ISR Center MOSA Management Office (MMO) for CMOSS / VICTORY / MORA” under solicitation number FY22-C5ISR-CMOSS. It was first posted on Mar 24, 2022 and has been updated 4 times since. Responses are due Mar 23, 2027, 4:00 PM EDT. No set-aside is listed. The listed point of contact is Jason Dirner.
RFP Detector Score
Every RFP starts at 50. Each factor adds or subtracts points compared with a typical RFP; unknown data counts as neutral.
Starts at 50
No value published, and there isn't enough award history to estimate one. Scored as neutral.
Full and open competition.
48 other RFPs from Department of the Army on RFP Detector in the past 12 months; no award history found.
Special notice: 118 days to respond (due Mar 23, 2027, 4:00 PM EDT). Long lead time.
Documents not listed, 2 named contacts with email, 630-word description.
Posted 1706 days ago.
50 + contributions = 47 (D, Limited)
Informational, not advice to bid or not bid. Score version 1.0.0, evaluated Nov 25, 2026.
Eligibility · Full and open competition
Full and open competition means the notice states no set-aside: any responsible business can respond, subject to the requirements in the notice.
Not stated in a form we could extract. See the official solicitation for requirements, evaluation criteria and submission steps.
From the official notice
***13 July 2026 - This Update makes an additional Approved for Public Release document, CMOSS IRS v1.3 discoverable and available. Additionally, referenced SOSA(TM) downloads are currently available at https://publications.opengroup.org/standards/sosa/s251 Attachments DRAS-26-3886-1-CMOSS-IRS-v1-3-DistA.pdf *** 16 October 2024 - This Update makes additional Approved for Public Release documents, including the new CMOSS IRS v1.2 and related files, discoverable and available. Additionally, referenced SOSA(TM) downloads are currently available at https://publications.opengroup.org/s241 . Attachments CMOSS Overview 14SEP23 Dist A 23-1038.pdf CMOSS-IRS-v1-2-DistA-24-1395-3.pdf MORA-VDL-Instructions-22Jul22-Dist-A-A1071.pdf mora-wsdls-and-schemas_MORA-V2.5-DIST_A_APPROVED-23-1003.zip MORA_Specification_V2.5_20221221_Final_DIST_A_APPROVED-23-1003.pdf MORA_Specification_V2.5_Revision_Notice_20221221_Final_DIST_A_APPROVED-23-182.pdf MORA_V2.5_Specification_Atlas_Rev_B_20230609_DIST_A_APPROVED-23-1003.xlsx MORA_V2.5_Specification_Revision_Overview_Brief_DEVCOM_C5ISR_Center_20221221_Final_DIST_A_APPROVED-23182.pdf MORA_V2.5_Training_ Session_Three_March_2023_CCDC_C5ISR_Center_DLB_Rev25_DIST_A_APPROVED-23-319.pdf MORA_V2.5_Training_ Session_Two_March_2023_CCDC_C5ISR_Center_DLB_Rev33_DIST_A_APPROVED-23-319.pdf MORA_V2.5_Training_Session_One_March_2023_CCDC_C5ISR_Center_DLB_Rev27_DIST_A_APPROVED-23-319.pdf Signed SAVE-IDD, 15 Feb 23.pdf VICTORY V1.9 and V1.10 and MORA V2.4 WSDLs and Schemas Dist A Final A921.zip VICTORY-Spec-Doc-V1-10-DIST_A_APPROVED-23-1003.pdf VICTORY-Spec-Doc-V1-10-MORA-Appendix-DIST_A_APPROVED-23-1003.pdf VICTORY-Spec-Doc-V1-9-MORA-Appendix.pdfVICTORY-Training-20220617-Dist-A-A1027.pdf VICTORY-VDL-Instructions-22Jul22-Dist-A-A1071.pdf *** 14 July 2022- This Update makes an additional Approved for Public Release document, an Interface Description Document for C5ISR Systems Integration into Army Ground Vehicles, discoverable and available. *** 22 April 2022- This Update makes additional Approved for Public Release documentation, referenced by the CMOSS Interoperability Requirements Specification v1.1, discoverable and available. Additionally, referenced SOSA(TM) downloads are currently available at https://www.opengroup.org/library/c212 . Attachments MORA_Specification_V2.4_20210301_Final_DIST_A A519 .pdf MORA_Specification_V2.4_Revision_Notice_20210301_Final_DIST_A A520.pdf MORA_V2.4_ Specification_Atlas_Rev_F_Final_DIST_A A521.xlsx mora-wsdls-and-schemas-v2.4-DistA-20210225.zip VICTORY-Spec-Doc-V1-9-Dist-A-A787.pdf VICTORY_Architecture_A_DistroA_20190402.pdf -------------------------------------------------------------------------------------------------------------------------------------------------- This Special Notice initially aims to make the Approved for Public Release, "Command, Control, Communication, Computers, Cyber, Intelligence, Surveillance and Reconnaissance / Electronic Warfare (C5ISR/EW) Modular Open Suite of Standards (CMOSS) Interoperability Requirements Specification" (CMOSS IRS) widely discoverable and available. The intent is to periodically modify this Special Notice to: make additional Approved for Public Release and/or Controlled Unclassified Information documentation discoverable and available (Public download, Transmittal upon Request, or link to Authoritative Sources, as appropriate); broadcast syndicated announcements for events or opportunities of interest to members of the CMOSS-enabled ecosystem The purpose of the CMOSS Interoperability Requirements Specification is to provide a common, configuration-controlled, Science, Technology, Engineering, Experimentation, Test & Evaluation and Acquisition minimum baseline technical requirements document. This allows US Army (T), and Joint, Interagency, Intergovernmental, Multinational (JIIM) (O), materiel developers and integrators to ensure CMOSS compliant/conformant solutions are over-the-interface(s)-interoperable with other components/systems developed to the same "shalls". The requirements within this document should be incorporated by reference in contracts, citing the document title, revision number, and effective date of publication. 'CMOSS#####' Unique Identifiers (UID) will typically be linked as 'parent requirements' from which materiel system, subsystem, component, etc. 'child requirements' are derived. This CMOSS Interoperability Requirements Specification is under the configuration control of the chartered C5ISR Center MOSA Management Office (MMO). MOSA MANAGEMENT OFFICE RESPONSIBILITIES Coordinate MOSA usage across C5ISR Center Review S&T projects and identify cross cutting opportunities to include MOSA Allocate MOSA implementation funding for labs, experimentation, and matrixed SME support Provide MOSA training for directorate SME’s Facilitate technology transition Manage and mature standards Develop and maintain the CMOSS and VICTORY specifications Develop compliance tools and support compliance verification C5ISR Center lead for standards bodies such as the SOSA(TM) Consortium Coordinate with external MOSA activities Provide MOSA support to the acquisition community Consolidate resource requests for MOSA support facilities and staff Support inclusion of MOSA in policy and programs Coordinate/represent MOSA with external partners CMOSS is a suite of standards to support the reduction of the size, weight and power of C5ISR and EW systems while increasing the flexibility and adaptability of these systems Universal A-Kit Project Managers field capabilities as cards into a common chassis Pooled radio resources such as antennas and amplifiers for Communications, Electronic Warfare (EW), and Signals Intelligence (SIGINT) systems Shared processing resources such as computers and displays Shared data services such as Position, Navigation, and Time (PNT) Foundation for enhanced interoperability and simultaneity between C5ISR systems Reduced life cycle cost through increased competition, smaller logistics tails with common sparing, and upgrading to the latest hardware as parts are replaced Rapid insertion of new technology/capability Attachments 20220310-CMOSS-IRS-v1-1-Dist-A-A518.pdf (Public) and CMOSS Overview 18Mar22 Dist A A758.pdf (Public)
No documents are listed for this notice.
Jason Dirner
PrimaryJohn Nilsen
Points of contact as published on the notice.
Special Notice posted
Special Notice posted
Special Notice posted
Special Notice posted
Special Notice posted
Responses dueNext · in 117 days
Archive date on the official notice
Same NAICS group or Other, nearby first, ranked by score.
Department of the Army · Savannah, GA
Why this score
New this week, 24 days to respond.
Why this score
New this week, 16 days to respond.
Why this score
New this week, 13 days to respond.
National Institutes of Health
Why this score
New this week, 16 days to respond.
Why this score
Posted today, 52 days to respond.
Department of the Navy
Why this score
27 days to respond, new this week.
RFP Detector Scores are informational.How we score →
893 open RFPs from this issuer and its offices.
Department of the Army
Why this score
Small-business set-aside, new this week; but only less than a day left.
Department of the Army
Why this score
Small-business set-aside, active buyer ($155M FY24–FY26); but only 1 day left.
Department of the Army
Why this score
New this week; but only 1 day left.
Department of the Army
Why this score
Small-business set-aside, new this week; but only 1 day left.
Department of the Army · Fort Bliss, TX
Why this score
But only 2 days left.
RFP Detector Scores are informational.How we score →
Official federal notice. Updated Jul 15, 2026.
Official solicitation:Sign in free to open the official solicitation
RFP Detector is an independent service and is not affiliated with any government agency. Scores are informational.
RFP Detector is not affiliated with the organization that issued this RFP. Always rely on the official notice and confirm every date and requirement with the issuer.