Why this score
Posted today, 15 days to respond; but small typical award (~$50K).
Solicitation # W911S226U3863Updated Aug 24, 2026
This RFP closed on Aug 27, 2026.
Aug 27, 2026
Responses were due Aug 27, 2026, 1:00 PM CDT
Same NAICS group or Supplies, Equipment & Furniture, nearby first, ranked by score.
Why this score
Posted today, 15 days to respond; but small typical award (~$50K).
Department of the Air Force · Tucson, AZ
Why this score
32 days to respond, new this week; but small typical award (~$157K).
Defense Logistics Agency
Why this score
Small-business set-aside, posted 8 days ago; but small typical award (~$50K).
Department of the Army
Why this score
29 days to respond; but small typical award (~$106K).
Federal Aviation Administration · Florida
Why this score
Clear, complete notice, new this week; but only 3 days left.
Department of the Navy
Why this score
New this week, clear, complete notice; but full and open.
RFP Detector Scores are informational.How we score →
Summary by RFP Detector
Department of the Army (W6QM MICC-FT DRUM), part of the Department of Defense, posted a combined synopsis/solicitation titled “Chemical Storage Building” under solicitation number W911S226U3863. It was first posted on Jul 29, 2026 and has been updated once since. The response deadline was Aug 27, 2026, 1:00 PM CDT. It is classified under NAICS 332311 (Prefabricated Metal Building and Component Manufacturing) and product/service code 5670. The set-aside is listed as Small Business Set Aside - Total. The listed point of contact is Carrie Lawton.
Score at publication
Every RFP starts at 50. Each factor adds or subtracts points compared with a typical RFP; unknown data counts as neutral.
Frozen at publication: closed RFPs are not re-scored.
Starts at 50
No value published, and there isn't enough award history to estimate one. Scored as neutral.
Total small-business set-aside.
2,008 other RFPs from Department of the Army on RFP Detector in the past 12 months; no award history found.
Solicitation, bids due: 29 days to respond (due Aug 27, 2026, 1:00 PM CDT).
Documents not listed, named contact with email and phone, 291-word description.
Posted today.
50 + contributions = 80 (A, Excellent)
Informational, not advice to bid or not bid. Score version 1.0.0, evaluated Jul 29, 2026.
Eligibility · Small Business Set Aside - Total
Small-business set-asides reserve a contract, or part of it, for businesses that meet the size standard for the NAICS code on the notice. "Total" set-asides restrict the whole requirement; "partial" set-asides restrict part of it.
Not stated in a form we could extract. See the official solicitation for requirements, evaluation criteria and submission steps.
From the official notice
The chemical storage building must meet several specifications for construction, safety, and utility. The required minimum dimensions are 42 feet in length, 8 feet in width, and 8 feet 3 inches in height. Access shall be provided by a 60-inch by 80-inch set of double doors, with at least one 36-inch active leaf, centered on one of the 42-foot walls and secured with a padlock-compatible handle. For spill containment, the building must include a sump with a minimum capacity of 1200 gallons.The structure must feature a robust fire-rated design, with walls tested by Intertek for a minimum 4-hour rating and a roof tested for a minimum 3-hour rating. Electrical specifications include a 12-space, 100-amp NEMA 3R main breaker panel (120V/240V), two Class 1, Division 2 explosion-proof LED light fixtures with a switch for the interior, and a dust/vapor-resistant exterior light with a photocell installed outside the hazard zone. Ventilation will be handled by an explosion-proof exhaust system rated for 335 CFM or higher, suitable for petroleum-based storage and compliant with all NFPA/UFC codes, complete with an indicator light and an emergency shut-off switch.For safety and functionality, the building shall be equipped with a grounding kit including an 8-foot ground rod, 10 feet of cable, and a clamp. The interior will be furnished with three-tier, 5-foot-long shelves that are 14 inches deep with a 2-inch lip. A non-perforated, skid-resistant steel ramp, measuring at least 52 inches wide by 72 inches long, must be included. Additionally, the unit shall come with three 10-pound ABC dry chemical fire extinguishers: two installed inside on either side of the door, and one mounted outside in a weatherproof cabinet. The completed chemical storage building is to be delivered to Building P-91, Railroad Street, Fort Drum, NY 13602.
No documents are listed for this notice.
Carrie Lawton
PrimaryPoints of contact as published on the notice.
Combined Synopsis/Solicitation posted
Combined Synopsis/Solicitation posted
Responses were due
849 open RFPs from this issuer and its offices.
Department of the Army · Gaithersburg, MD
Why this score
New this week, 8(a) set-aside (strong incumbent); but only less than a day left.
Department of the Army · Fort Bragg, NC
Why this score
Recently updated; but only less than a day left.
Department of the Army · Johnston, IA
Why this score
Small-business set-aside, new this week; but only less than a day left.
Department of the Army · Aberdeen Proving Ground, MD
Why this score
Not openly competed. Notice signals a sole-source or brand-name intent. The largest recipient took 19% of these dollars in FY24–FY26.
Department of the Army · Camp Arifjan
Why this score
New this week, typical award ~$1.2M; but only less than a day left.
Department of the Army · Jolon, CA
Why this score
Active buyer ($24.3B FY24–FY26), full and open; but only less than a day left.
RFP Detector Scores are informational.How we score →
Official federal notice. Updated Aug 24, 2026.
Official solicitation:Sign in free to open the official solicitation
RFP Detector is an independent service and is not affiliated with any government agency. Scores are informational.
RFP Detector is not affiliated with the organization that issued this RFP. Always rely on the official notice and confirm every date and requirement with the issuer.