Fort Hood Tank Repairs
Department of the Army
Why this score
51 days to respond, small-business set-aside; but limited documentation.
Solicitation # W912HV26RA009Updated Oct 19, 2026Scored Nov 25, 2026
Jan 25
Jan 25, 2027, 2:00 PM GMT+9
Summary by RFP Detector
Department of the Army (W2SN ENDIST JAPAN), part of the Department of Defense, posted a solicitation titled “DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan” under solicitation number W912HV26RA009. It was first posted on Aug 12, 2026 and has been updated 5 times since. Responses are due Jan 25, 2027, 2:00 PM GMT+9. It is classified under NAICS 237120 (Oil and Gas Pipeline and Related Structures Construction) and product/service code Y1NA. No set-aside is listed. The listed point of contact is Jiro Miyairi.
RFP Detector Score
Every RFP starts at 50. Each factor adds or subtracts points compared with a typical RFP; unknown data counts as neutral.
Starts at 50
No value published. Typical award is about $1.2M: the median of 128 Army contracts over $25K awarded in NAICS 237120, FY24–FY26.
Full and open competition. The largest recipient took 18% of these dollars in FY24–FY26.
Army obligated $630M on NAICS 237120 across 169 contracts in FY24–FY26. 19 other notices from this office in the past 12 months.
Solicitation, bids due: 61 days to respond (due Jan 25, 2027, 2:00 PM GMT+9). Long lead time.
Documents not listed, 2 named contacts with email and phone, 257-word description.
Updated 37 days ago.
50 + contributions = 65 (B, Strong)
Informational, not advice to bid or not bid. Score version 1.0.0, evaluated Nov 25, 2026.
Eligibility · Full and open competition
Full and open competition means the notice states no set-aside: any responsible business can respond, subject to the requirements in the notice.
Not stated in a form we could extract. See the official solicitation for requirements, evaluation criteria and submission steps.
From the official notice
Update 19 October 2026: Updated RFI Response Report has been posted to PIEE. Update 25 September 2026: Preliminary RFI Response Report has been posted to PIEE. Update 14 September 2026: Attached Site Visit Roster. Update 10 September 2026: Attached Pre-Proposal Conference Slides. Project Title: DESC2103C - Bulk Fuel Storage Tanks Phase II. Project Description: Construct one 100,000-barrel cut-and-cover JP-8 storage tank. A pump house is to be provided on the top of the tank and contain four 600-gpm issue vertical turbine pumps and one 50-gpm water draw off vertical turbine pump. The new tank will include a high-level valve, independent level alarms, and the hardware necessary for the automatic tank gauging (ATG) system. The new tank includes piping, valves, vaults and appurtenances connecting to an existing filter separator building. The new control system of the new tank will be connected to the existing filter building that houses pump control Programmable Logic Controller (PLC) and Human Machine Interface (HMI), automatic tank gauge (ATG) reporting module capable of reporting inputs from all Eastside Fuel Facility tanks. A product saver tank is to be provided for the new bulk storage tank. The Pump House will be of reinforced concrete construction and site adapted to meet local conditions. The roof will be a low slope concrete roof with built-up roofing with overhangs over doorways. The tank is to be steel with concrete outer wall with a rolling cover for access to tank mounted equipment. The product recovery pump will return reclaimed fuel back through receipt filtration to the bulk storage tanks.
No documents are listed for this notice.
Jiro Miyairi
PrimaryRyan Marzetta
Points of contact as published on the notice.
Solicitation posted
Solicitation posted
Solicitation posted
Solicitation posted
Solicitation posted
Solicitation posted
Responses dueNext · in 61 days
Archive date on the official notice
Federal award history
Department of the Army · NAICS 237120 · FY24–FY26
Recipients of past awards in this market, not the incumbent of this RFP.
| Fiscal year | Obligated ($) |
|---|---|
| FY2022 | 217,609,014.14 |
| FY2023 | 259,407,927.42 |
| FY2024 | 288,383,023.27 |
| FY2025 | 193,841,028.55 |
| FY2026 | 147,698,536.42 |
Federal contract award records, award types A–D, FY24–FY26. Updated Nov 13, 2026.
Same NAICS group or Construction & Renovation, nearby first, ranked by score.
Department of the Army
Why this score
51 days to respond, small-business set-aside; but limited documentation.
Department of the Army
Why this score
Small-business set-aside, 26 days to respond; but thin documentation.
Department of the Army
Why this score
26 days to respond, small-business set-aside.
Department of the Army
Why this score
19 days to respond, recently updated.
Department of the Army · Sylvan Grove, KS
Why this score
Small-business set-aside, clear, complete notice.
Department of Veterans Affairs · North Little Rock, AR
Why this score
52 days to respond, SDVOSB set-aside; but small typical award (~$124K).
RFP Detector Scores are informational.How we score →
893 open RFPs from this issuer and its offices.
Department of the Army
Why this score
Small-business set-aside, new this week; but only less than a day left.
Department of the Army
Why this score
Small-business set-aside, active buyer ($155M FY24–FY26); but only 1 day left.
Department of the Army
Why this score
New this week; but only 1 day left.
Department of the Army
Why this score
Small-business set-aside, new this week; but only 1 day left.
Department of the Army · Fort Bliss, TX
Why this score
But only 2 days left.
RFP Detector Scores are informational.How we score →
Official federal notice. Updated Oct 19, 2026.
Official solicitation:Sign in free to open the official solicitation
RFP Detector is an independent service and is not affiliated with any government agency. Scores are informational.
RFP Detector is not affiliated with the organization that issued this RFP. Always rely on the official notice and confirm every date and requirement with the issuer.