Lowline Area Burned Fence Construction Project
Forest Service · Gunnison, CO
Why this score
Small-business set-aside, 14 days to respond; but limited award history ($39.7M FY24–FY26).
Solicitation # RFP-2027-27107Updated Nov 10, 2026
This RFP closed on Nov 11, 2026.
Nov 11, 2026
Responses were due Nov 11, 2026, 5:00 PM MST
Same NAICS group or Construction & Renovation, nearby first, ranked by score.
Forest Service · Gunnison, CO
Why this score
Small-business set-aside, 14 days to respond; but limited award history ($39.7M FY24–FY26).
Federal Highway Administration · Gunnison, CO
Why this score
Small-business set-aside, typical award ~$3.8M.
Forest Service · Colorado
Why this score
24 days to respond, small-business set-aside; but small typical award (~$202K).
Department of Veterans Affairs · Aurora, CO
Why this score
Small-business set-aside, active buyer ($854M FY24–FY26); but only 3 days left.
Forest Service · Ward, CO
Why this score
24 days to respond, small-business set-aside; but small typical award (~$202K).
Public Buildings Service · Lakewood, CO
Why this score
Active buyer ($5.8B FY24–FY26), 13 days to respond; but small typical award (~$162K).
RFP Detector Scores are informational.How we score →
Summary by RFP Detector
Department of Energy (Alliance for Energy Innovation, LLC - DOE Contractor) posted a solicitation titled “Design-Build Services – STM Security Fencing - North Boundary” under solicitation number RFP-2027-27107. It was first posted on Oct 7, 2026 and has been updated 4 times since. The response deadline was Nov 11, 2026, 5:00 PM MST. It is classified under NAICS 238990 (All Other Specialty Trade Contractors) and product/service code 5660. The set-aside is listed as Small Business Set Aside - Total. The place of performance is Golden, Colorado. The listed point of contact is Stephen Cummock.
Score at publication
Every RFP starts at 50. Each factor adds or subtracts points compared with a typical RFP; unknown data counts as neutral.
Frozen at publication: closed RFPs are not re-scored.
Starts at 50
No value published, and there isn't enough award history to estimate one. Scored as neutral.
Total small-business set-aside.
5 other RFPs from Department of Energy on RFP Detector in the past 12 months; no award history found.
Solicitation, bids due: 35 days to respond (due Nov 11, 2026, 5:00 PM MST).
Documents not listed, 2 named contacts with email, 363-word description.
Posted today.
50 + contributions = 77 (B, Strong)
Informational, not advice to bid or not bid. Score version 1.0.0, evaluated Oct 7, 2026.
Eligibility · Small Business Set Aside - Total
Small-business set-asides reserve a contract, or part of it, for businesses that meet the size standard for the NAICS code on the notice. "Total" set-asides restrict the whole requirement; "partial" set-asides restrict part of it.
Not stated in a form we could extract. See the official solicitation for requirements, evaluation criteria and submission steps.
From the official notice
This description is intended to summarize the project at a high level for procurement purposes. Interested parties must refer to the full SOW for complete technical requirements, detailed scope elements, design and construction deliverables, environmental obligations, safety standards, and administrative procedures. The SOW governs all expectations for this procurement. Project Overview The National Laboratory of the Rockies (NLR) is soliciting design?build services for installation of new perimeter fencing along the North boundary of the South Table Mountain (STM) Campus. The work includes designing and installing new fencing, removing designated sections of existing chain?link fence, and completing all related construction activities in accordance with NLR’s design standards, construction specifications, and DOE site requirements. Portions of the work require coordination with the State Historic Preservation Office (SHPO). Interested parties must reference the full Statement of Work (SOW) for all detailed scope, technical requirements, and performance expectations. Design?Build Requirements The Subcontractor shall develop and submit design documents consistent with NLR’s required 50% and 90% design reviews, followed by preparation of a complete 100% Issued?for?Construction package. All design work must comply with applicable codes, NLR Design Standards, and required CAD/BIM formats. Throughout the effort, the Subcontractor must maintain alignment with NLR’s design?to?cost objectives and utilize Procore for all project documentation, including drawings, specifications, RFIs, and submittals. Construction Requirements All construction activities must comply with NLR’s safety, security, and environmental guidelines, including requirements for site access, personnel qualifications, and safe work practices. The Subcontractor is responsible for completing all utility locates before performing any excavation and must implement erosion control, material handling, and environmental protection measures as required. Waste prevention, recycling, and proper tracking of off?site disposal activities must be performed in accordance with the SOW and associated exhibits. Management, Coordination, and Quality Assurance The Subcontractor shall provide qualified project management and on?site supervision, maintain an approved Quality Assurance Plan, and participate in all required meetings, field observations, testing, and commissioning activities. The Subcontractor is responsible for coordinating deliveries, securing access authorization for personnel, and following all NLR and DOE security protocols. At project completion, the Subcontractor must deliver accurate as?built documentation, testing records, and turnover materials in accordance with NLR standards and support NLR’s Beneficial Occupancy process.
No documents are listed for this notice.
Stephen Cummock
PrimaryConstruction Inbox
Points of contact as published on the notice.
Solicitation posted
Solicitation posted
Solicitation posted
Solicitation posted
Solicitation posted
Responses were due
136 open RFPs from this issuer and its offices.
Department of Energy · Lead, SD
Why this score
But only less than a day left.
Department of Energy · Menlo Park, CA
Why this score
Full and open; but only less than a day left.
Department of Energy · Aiken, SC
Why this score
New this week, clear, complete notice; but only less than a day left.
Department of Energy · Washington, DC
Why this score
Not openly competed. Notice signals a sole-source or brand-name intent. The largest recipient took 21% of these dollars in FY24–FY26.
Department of Energy · Oak Ridge, TN
Why this score
New this week, full and open; but only 2 days left.
Department of Energy · Oak Ridge, TN
Why this score
New this week, active market ($222M FY24–FY26); but only 2 days left.
RFP Detector Scores are informational.How we score →
Official federal notice. Updated Nov 10, 2026.
Official solicitation:Sign in free to open the official solicitation
RFP Detector is an independent service and is not affiliated with any government agency. Scores are informational.
RFP Detector is not affiliated with the organization that issued this RFP. Always rely on the official notice and confirm every date and requirement with the issuer.