USCG Regional Multiple Award Construction Contract (Rmacc III)
US Coast Guard · Juneau, AK
Why this score
Clear, complete notice, 38 days to respond; but posted 774 days ago.
Solicitation # W911KB27RWP12Updated Nov 6, 2026
This RFP closed on Nov 16, 2026.
Nov 16, 2026
Responses were due Nov 16, 2026, 2:00 PM AKST
Same NAICS group or Construction & Renovation, nearby first, ranked by score.
US Coast Guard · Juneau, AK
Why this score
Clear, complete notice, 38 days to respond; but posted 774 days ago.
Department of the Army · Seward, AK
Why this score
29 days to respond, active buyer ($22B FY24–FY26).
Department of the Army · Nome, AK
Why this score
24 days to respond, active buyer ($22B FY24–FY26).
Federal Highway Administration · Fairbanks, AK
Why this score
29 days to respond, typical award ~$3.8M.
Federal Highway Administration · Anchorage, AK
Why this score
Typical award ~$3.8M, full and open.
Department of the Army · Anchorage, AK
Why this score
Active buyer ($22B FY24–FY26), typical award ~$2.4M.
RFP Detector Scores are informational.How we score →
Summary by RFP Detector
Department of the Army (W2SN ENDIST ALASKA), part of the Department of Defense, posted a special notice titled “(EAR048) Repair Fire Alarm System Eareckson Air Station Facilities” under solicitation number W911KB27RWP12. It was first posted on Oct 26, 2026 and has been updated 2 times since. The response deadline was Nov 16, 2026, 2:00 PM AKST. It is classified under NAICS 236220 (Commercial and Institutional Building Construction) and product/service code Y1JZ. No set-aside is listed. The place of performance is Eareckson As, Alaska. The listed point of contact is MAJ Quentin Sica.
Score at publication
Every RFP starts at 50. Each factor adds or subtracts points compared with a typical RFP; unknown data counts as neutral.
Frozen at publication: closed RFPs are not re-scored.
Starts at 50
No value published. Typical award is about $346K: the median of 6,053 Army contracts over $25K awarded in NAICS 236220, FY24–FY26.
Full and open competition. The largest recipient took 6% of these dollars in FY24–FY26, and spending is spread across many vendors.
Army obligated $24.3B on NAICS 236220 across 7,519 contracts in FY24–FY26. 24 other notices from this office in the past 12 months.
Special notice: 21 days to respond (due Nov 16, 2026, 2:00 PM AKST).
Documents not listed, 2 named contacts with email, 893-word description.
Posted today.
50 + contributions = 82 (A, Excellent)
Informational, not advice to bid or not bid. Score version 1.0.0, evaluated Oct 26, 2026.
Eligibility · Full and open competition
Full and open competition means the notice states no set-aside: any responsible business can respond, subject to the requirements in the notice.
Not stated in a form we could extract. See the official solicitation for requirements, evaluation criteria and submission steps.
From the official notice
**06 NOV 2026 Update** See the attached file “EAR048_Industry Questions and GOV Response, 06 NOV 2026” for U.S. Government (USG) responses to industry questions. Please continue to submit questions to the Point of Contact (POC) listed below. The USG will post responses on a weekly basis. **End of 06 NOV 2026 Update ** **30 OCT 2026 Update** See the attached file “EAR048_Industry Questions and GOV Response, 30 OCT 2026” for U.S. Government (USG) responses to industry questions. Please continue to submit questions to the Point of Contact (POC) listed below. The USG will post responses on a weekly basis. **End of 30 OCT 2026 Update ** REQUEST FOR INFORMATION (RFI) / MARKET INTELLIGENCE NOTICE Notice: This is a Request for Information (RFI) for market intelligence and for informational purposes only. This announcement does not constitute a Solicitation or a Request for Proposal (RFP), and no solicitation is currently available. Participation in this RFI is strictly voluntary. The Government will not be obligated to award any agreement or contract because of this RFI, nor will it reimburse respondents for any costs associated with the preparation or submission of information. Submitting a response will not affect a firm’s ability to submit a proposal should a formal solicitation be issued in the future. NAICS Code: 236220 – Commercial and Institutional Building Construction (Note: While Other Transaction Authority is not subject to FAR-based small business regulations, this NAICS code is provided for market research to help the Government understand the size and demographics of the interested industrial base.) Small Business Size Standard: $45 Million PROJECT OVERVIEW The U.S. Army Corps of Engineers (USACE), Alaska District, has a requirement for the site-wide repair and replacement of fire alarm systems at Eareckson Air Station (Shemya Island, Alaska). The project will replace aging and non-compliant fire alarm systems across multiple facilities to meet current UFC 3-600-01, NFPA 72, and life-safety requirements. Existing systems are outdated or non-functional, creating risk to personnel and mission on this remote installation. The Government is now pursuing a wireless (or hybrid wireless) fire alarm architecture that significantly reduces or eliminates the need for extensive buried fiber optic infrastructure, thereby addressing the primary cost driver while achieving full code compliance. Key project components include: • Demolition of existing fire alarm control panels, initiating devices, notification appliances, conduit, and wiring across affected buildings • Installation of a new wireless/hybrid addressable fire alarm system, including wireless devices, gateways/repeaters for campus-wide RF coverage, limited residual hard-wired elements only where essential, and integration with supervisory/monitoring capabilities • RF coverage analysis, specialty detection in hazardous (Class I) locations associated with fuel systems, cybersecurity compliance, multi-shift training, testing, commissioning, and phased turnover • Phased execution by building or geographic area to accommodate remote-island logistics and minimize operational impact Estimated Acquisition Magnitude: Between $27M and $33M Planned Acquisition Strategy: Anticipated to utilize Progressive Design Build via Other Transaction Authority (OTA) The Alaska District is conducting market intelligence to assess industry capability and interest in supporting this effort utilizing an Other Transaction (OT) Agreement under the authority of 10 U.S.C. § 2808a, Facility Construction or Repair: Transactions Other Than Contracts and Grants. This authority is distinct from the Department of Defense prototype OT authorities commonly associated with 10 U.S.C. § 4021 and 4022. This authority is intended for military construction and repair projects that involve testing and experimentation associated with new and emergent construction technologies to achieve potential benefits such as enhanced mission resilience, improved installation support, or cost and schedule reduction. The anticipated delivery method is Progressive Design-Build. Design and Pre-Construction Services - The OT Awardee shall assist the Government collaboratively in advancing the wireless/hybrid fire alarm design, performing RF coverage analysis and site investigations, supporting the UFC waiver process, validating and refining project requirements, and developing progressively more detailed open-book cost and schedule information. Design is expected to advance from approximately 0–15% at award to an agreed interim milestone (target approximately 65%) sufficient for reliable Guaranteed Maximum Price (GMP) development. Final Design and Construction - Upon reaching an agreed-upon level of design, the Awardee will propose a Guaranteed Maximum Price (GMP) or Firm-Fixed-Price for final design and construction. If the price is accepted and required funding/approvals (including UFC waiver status) are in place, the Government will authorize Phase 2 execution via modification. Construction is expected to be authorized in staggered packages by building or geographic area to allow early turnover of priority facilities. If a fair and reasonable price cannot be agreed upon, or if other conditions prevent proceeding, the Government retains an “off-ramp” to complete the project via alternative methods while retaining rights to the design developed during Phase 1. SUBMISSION INSTRUCTIONS: Please submit your responses to the attached Market Research Intelligence Questionnaire no later than 16 November 2026 at 14:00 Alaska Time (AKT) using one of the following methods: Preferred Method: Complete the questionnaire via the Microsoft Forms link: https://forms.osi.apps.mil/r/DgMYxp3wcZ Alternative Method: Email your completed questionnaire to both of the following individuals: MAJ Quentin Sica at Quentin.Sica@usace.army.mil Theresa Afrank at Theresa.M.Afrank@usace.army.mil Any questions regarding this RFI should be directed to MAJ Quentin Sica or Theresa Afrank using the email addresses above. Disclaimer: This RFI is for market intelligence purposes only. The Government reserves the right to use information received for any purpose and does not commit to issuing a solicitation or awarding an agreement as a result of this notice.
No documents are listed for this notice.
MAJ Quentin Sica
PrimaryTheresa Afrank
Points of contact as published on the notice.
Special Notice posted
Special Notice posted
Special Notice posted
Responses were due
Federal award history
Department of the Army · NAICS 236220 · FY24–FY26
Recipients of past awards in this market, not the incumbent of this RFP.
| Fiscal year | Obligated ($) |
|---|---|
| FY2022 | 9,616,060,229.41 |
| FY2023 | 13,283,743,236.13 |
| FY2024 | 10,870,211,169.17 |
| FY2025 | 7,794,845,075.13 |
| FY2026 | 5,637,569,886.42 |
Federal contract award records, award types A–D, FY24–FY26. Updated Nov 13, 2026.
884 open RFPs from this issuer and its offices.
Department of the Army
Why this score
But only less than a day left.
Department of the Army · Illinois
Why this score
Recently updated; but only less than a day left.
Department of the Army · District of Columbia
Why this score
Small-business set-aside, new this week; but only less than a day left.
Department of the Army
Why this score
Active buyer ($906M FY24–FY26), new this week; but only less than a day left.
Department of the Army
Why this score
Active buyer ($24.3B FY24–FY26), full and open; but only 1 day left.
RFP Detector Scores are informational.How we score →
Official federal notice. Updated Nov 6, 2026.
Official solicitation:Sign in free to open the official solicitation
RFP Detector is an independent service and is not affiliated with any government agency. Scores are informational.
RFP Detector is not affiliated with the organization that issued this RFP. Always rely on the official notice and confirm every date and requirement with the issuer.