Skip to content
FederalRFIClosed Federal notice

Electrical Projects – Use of Progressive Design Build (PDB) with Other Transaction Authority (OTA) - Request for Information

Department of the Air Force› FA9401 377 MSG PK Kirtland AFB, NM

Solicitation # MHMV200009-MHMV120009-MHMV08002Updated Nov 6, 2026

This RFP closed on Nov 19, 2026.

The details below are kept for reference. Similar open RFPs are listed first.

Closed

Nov 19, 2026

Responses were due Nov 19, 2026, 4:30 PM MST

Posted
Nov 6, 2026
Closed
Nov 19, 2026

Similar open RFPs

Same NAICS group or Construction & Renovation, nearby first, ranked by score.

Strong

NM FLAP SR35(1) Grant County Bridges

Federal Highway Administration · Mimbres, NM

FederalPresolicitationConstruction & Renovation
Posted Nov 16Due Dec 1, 2026, 2:00 PM MST (in 8 days)Federal notice
Strong

IE181 - WHS Greenhouse Construction

Bureau of Indian Affairs · Ft. Wingate, NM

FederalSolicitationIndian Small Business Economic EnterpriseConstruction & Renovation+1
Posted Oct 20Due Nov 30, 2026, 12:00 PM MST (in 7 days)Federal notice
Fair

New Mexico Forest Engineering and Road Maintenance (FERM)

Forest Service · Santa Fe, NM

FederalSolicitationSmall business set-asideConstruction & Renovation+1
Posted Oct 28Due Jan 31, 2028, 4:30 PM PST (in 435 days)Federal notice
Limited

Electrical Upgrades to the GCAFB/Tanker Base/Fire Cache

Forest Service · Hurley, NM

FederalRFQSmall business set-asideConstruction & Renovation+1
Posted Nov 10Due Dec 11, 2026, 12:00 PM MST (in 18 days)Federal notice

RFP Detector Scores are informational.How we score →

Summary by RFP Detector

What this RFP is about

Department of the Air Force (FA9401 377 MSG PK), part of the Department of Defense, posted a request for information titled “Electrical Projects – Use of Progressive Design Build (PDB) with Other Transaction Authority (OTA) - Request for Information” under solicitation number MHMV200009-MHMV120009-MHMV08002. It was posted on Nov 6, 2026. The response deadline was Nov 19, 2026, 4:30 PM MST. It is classified under NAICS 237130 (Power and Communication Line and Related Structures Construction) and product/service code Y1MZ. No set-aside is listed. The place of performance is Kirtland AFB, New Mexico. The listed point of contact is Emmanuel Cobian.

Key facts

Sector
Federal
Notice type
RFI
As posted: Sources Sought
PSC
Y1MZ
Place of performance
Kirtland AFB, NM
ZIP 87117
Value
Not statedTypical award in this market ≈ $241.4K
Solicitation #
MHMV200009-MHMV120009-MHMV08002
Listing
Official federal notice

Score at publication

Score breakdown

Every RFP starts at 50. Each factor adds or subtracts points compared with a typical RFP; unknown data counts as neutral.

Frozen at publication: closed RFPs are not re-scored.

Starts at 50

  • Value−3.5estimated

    No value published. Typical award is about $241K: the median of 47 Air Force contracts over $25K awarded in NAICS 237130, FY24–FY26.

  • Competition & access+2.3measured

    Full and open competition. The largest recipient took 13% of these dollars in FY24–FY26, and spending is spread across many vendors.

  • Issuer & market−5.5measured

    Air Force obligated $38.3M on NAICS 237130 across 58 contracts in FY24–FY26. 10 other notices from this office in the past 12 months.

  • Time & stage+5.4measured

    Sources sought (market research, not a bid): 13 days to respond (due Nov 19, 2026, 4:30 PM MST).

  • Clarity & completeness+6.1estimated

    Documents not listed, 2 named contacts with email and phone, 834-word description.

  • Freshness+9.0measured

    Posted today.

50 + contributions = 64 (C, Fair)

Score trend, last 30 daysScore history: 61, 58, 49, 47, 44, 40, 37

Informational, not advice to bid or not bid. Score version 1.0.0, evaluated Nov 6, 2026.

Requirements & submission

Eligibility · Full and open competition

Full and open competition means the notice states no set-aside: any responsible business can respond, subject to the requirements in the notice.

Not stated in a form we could extract. See the official solicitation for requirements, evaluation criteria and submission steps.

From the official notice

Description

834 words

This is a request for information (RFI) for market intelligence and for informational purposes only. This announcement does not constitute a solicitation or a request for proposal (RFP), and no solicitation is currently available. Participation in this RFI is strictly voluntary. The Government will not be obligated to award any agreement or contract because of this RFI, nor will it reimburse respondents for any costs associated with the preparation or submission of information. Submitting a response will not affect a firm’s ability to submit a proposal should a formal solicitation be issued in the future. Please note that while Other Transaction Authority is not subject to FAR based small business regulations, this NAICS code is provided for market research to help the Government understand the size and demographics of the interested industrial base. PROGRAM/PROJECT OVERVIEW: The U.S. Air Force 377th Contracting Division has a requirement to execute the construction and technical redesign requirements for the demolition of three substations and new construction of two upgraded substations. The services requested will include new 12.47 kV distribution systems. The primary purpose and objective of these projects are to rapidly upgrade the existing infrastructure, meet standards, enhance operational efficiency, and ensure compliance with regulatory guidelines. The Government is evaluating the feasibility of executing these requirements under one award via Progressive Design-Build (PDB) utilizing an Other Transaction (OT) Agreement under the statutory authority of 10 U.S.C. § 2808a. Summaries of projects for this acquisition strategy are as follows: - MHMV200009 – Repair Substation 9 and Feeders: The primary objective of the Repair Substation 9 and Feeders project is to design and construct a fully operational, modern power distribution asset, upgrading the existing infrastructure to meet standards, enhance operational efficiency, and ensure compliance with regulatory guidelines. This goal will be achieved by establishing the new substation facility within a defined 100ft x 150ft footprint directly south of the existing location, and installing all-new substation components, security fencing, distribution poles, switching gear, and conductors. The project also aims to complete the systematic teardown and removal of all retired infrastructure to restore the original site. - MHMV 120009 – Remove Substation 23 & Connect Loads to Substation 24A Feeder 5: The project entails the design and construction services required to remove Substation 23 & connect loads to Substation 24A Feeder 5 located on KAFB. The primary purpose and objective of this project is to upgrade the existing infrastructure of Substation 24A Feeder 5 to meet standards, enhance operational efficiency, and ensure compliance with regulatory guidelines. - MHMV080002 – Demo Substation 3, Rebuild Substation 10 and Distribution System: The primary goal of the Demo Substation 3, Rebuild Substation 10 and Distribution System project is to safely decommission and demolish Substations 3 and 10 and design, construct, and commission a modern, consolidated Substation 10 rated at 10,000 KVA (10/12/14 MVA). This infrastructure upgrade will replace aged, unserviceable assets with a resilient, high-capacity substation and an underground distribution backbone designed to eliminate single points of failure and modernize base electrical infrastructure. Included in this notice are the attachments of the Scope of Services with technical documents for more detailed information on the nature of the work. INFORMATION REQUESTED: Interested industry partners are requested to respond to the following questions to help shape the final acquisition strategy. Please limit your responses to no more than 5-pages addressing the following questions – - Company Profile: Business Name Address Point of Contract (Name, Title) Phone Number Email Address Cage Code & UEI - Relevant Experience: Please provide your relevant experience as it relates to performing multiple project in similar size, scope, and complexity to this requirement. Summarize performance clearly and factually, along with project locations and the projects customer(s). Do not submit proprietary trade secrets, protected technologies, or classified information in your response. All feed-back received will be handled as public market research to shape the Government's final acquisition approach. - Feedback on the Acquisition Strategy & Alternatives: OTA Experience – Describe your firm’s previous experience, if any, executing projects utilizing OTA. What project characteristics make PDB OTA particularly advantageous or disadvantageous for this requirement? Describe your experience executing Progressive Design-Build, Construction Manager at Risk (CMAR), or other highly collaborative delivery methods where designer and builder worked collaboratively with the owner before locking in a Guaranteed Maximum Price (GMP). Does the proposed PDB-OTA strategy incentivize your firm to participate? Why or why not? Are there alternative acquisition strategies, commercial phasing arrangements, or risk-sharing terms that the Government has not considered that would yield a higher quality facility, faster delivery, or lower cost? The Government welcomes candid industry feedback and recommendations regarding commercial practices, agreement terms, project phasing, risk sharing, governance, pricing approaches, and other considerations that could improve successful execution of these projects under 10 U.S.C. § 2808a. Interested firms are encouraged to add themselves to the Interested Vendors List associated with this announcement on (see the official solicitation) to receive future updates. Please submit your responses to the Government Point of Contact listed below by the response date listed.

Documents

No documents are listed for this notice.

Contacts

2 contacts

Points of contact as published on the notice.

Timeline & history

  1. Sources Sought posted

  2. Responses were due

Federal award history

Market context

Department of the Air Force · NAICS 237130 · FY24–FY26

Typical award (over $25K)
$241.4K
Contracts awarded
58
Total obligated
$38.3M
Award size, Department of the Air Force · NAICS 237130 contracts, FY24–FY26 (log scale)
P25 $37.8KMedian $171.1KP75 $1.0MP90 $1.8M

Largest recipients in this market

  • TUCSON ELECTRIC POWER COMPANY$4.9M13%
  • SERVITECH, INC.$3.6M9%
  • RED POINT CONSTRUCTION, LLC$3.4M9%

Recipients of past awards in this market, not the incumbent of this RFP.

View as table
Fiscal yearObligated ($)
FY2022109,248,142.79
FY202329,114,278.88
FY202421,330,227.46
FY202512,595,286.33
FY20264,369,915.42

Federal contract award records, award types A–D, FY24–FY26. Updated Nov 15, 2026.

More from Department of the Air Force

759 open RFPs from this issuer and its offices.

Poor

L-39 Albatross Historic Static Display

Department of the Air Force · Joint Base MDL, NJ

FederalSources soughtEvents, Travel & Hospitality
Posted Nov 18Due Nov 23, 2026, 9:00 AM EST (in 4 h)Federal notice
Not competed

Intent to Sole Source- Military Freefall Currency Training Support

Department of the Air Force · Eloy, AZ

FederalSpecial noticeEducation & Training
Posted Nov 19Due Nov 23, 2026, 8:30 AM MST (in 6 h)Federal notice
Poor

AFIT/ENG-Cleanroom DI-RO Type I Ultra-Pure Water System

Department of the Air Force · Wright Patterson AFB, OH

FederalSources soughtTransportation, Fleet & Logistics
Posted Nov 5Due Nov 23, 2026, 11:00 AM EST (in 6 h)Federal notice
Poor

Upgrade X-Ray Controller

Department of the Air Force · Oklahoma

FederalSolicitationSupplies, Equipment & Furniture
Posted Oct 29Due Nov 23, 2026, 10:00 AM CST (in 6 h)Federal notice
Limited

Cathodic Protection Survey/Inventory/Assessment Services

Department of the Air Force · Tyndall, FL

FederalSources soughtEngineering & Architecture
Posted Oct 21Due Nov 23, 2026, 10:00 AM CST (in 6 h)Federal notice
Poor

FD2020

Department of the Air Force

FederalSpecial noticeSupplies, Equipment & Furniture
Posted Nov 23Due Nov 23, 2026, 11:00 AM EST (in 6 h)Federal notice

RFP Detector Scores are informational.How we score →

About this notice

Official federal notice. Updated Nov 6, 2026.

Official solicitation:Sign in free to open the official solicitation

RFP Detector is an independent service and is not affiliated with any government agency. Scores are informational.

RFP Detector is not affiliated with the organization that issued this RFP. Always rely on the official notice and confirm every date and requirement with the issuer.