Request for Proposal (RFP) - Resilient Missile Warning Tracking (RMWT) Low Earth Orbit (LEO) Ground Entry Points (GEPs)
Department of the Air Force · Washington, DC
Why this score
31 days to respond, active buyer ($36.7B FY24–FY26).
Solicitation # BAA-N6893625S0001-0001Updated Nov 3, 2026Scored Nov 18, 2026
Dec 1
Dec 1, 2026, 4:00 PM PST
Summary by RFP Detector
Department of the Navy (Naval Air Warfare Center), part of the Department of Defense, posted a sources sought notice titled “EMU Electric Modernization Upgrade” under solicitation number BAA-N6893625S0001-0001. It was first posted on Oct 28, 2026 and has been updated 3 times since. Responses are due Dec 1, 2026, 4:00 PM PST. It is classified under NAICS 541715 (Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)) and product/service code AC13. No set-aside is listed. The listed point of contact is jennifer felton.
RFP Detector Score
Every RFP starts at 50. Each factor adds or subtracts points compared with a typical RFP; unknown data counts as neutral.
Starts at 50
No value published. Typical award is about $635K: the median of 3,498 Navy contracts over $25K awarded in NAICS 541715, FY24–FY26.
Full and open competition. The largest recipient took 26% of these dollars in FY24–FY26.
Navy obligated $22B on NAICS 541715 across 3,633 contracts in FY24–FY26. 198 other notices from this office in the past 12 months.
Sources sought (market research, not a bid): 14 days to respond (due Dec 1, 2026, 4:00 PM PST).
0 documents, 2 named contacts with email and phone, 438-word description.
Posted 20 days ago.
50 + contributions = 63 (C, Fair)
Informational, not advice to bid or not bid. Score version 1.0.0, evaluated Nov 18, 2026.
Eligibility · Full and open competition
Full and open competition means the notice states no set-aside: any responsible business can respond, subject to the requirements in the notice.
Not stated in a form we could extract. See the official solicitation for requirements, evaluation criteria and submission steps.
From the official notice
The Naval Air Warfare Center Weapons Division (NAWCWD) has developed and intends to field a modular, organic capability consisting of commercial-off-the-shelf (COTS) components integrated into custom hardware for the MH-60R Seahawk helicopter. The Government has established a viable system baseline, however, a standardized, repeatable, and supportable production, deployment, and sustainment process is not yet developed. With an initial operational capability target of Q1 FY2028, the program's small scope makes traditional, large-scale support and depot-level sustainment models highly cost-prohibitive. The current ad-hoc model lacks a process with defined material flow, supply-chain management, quality control, and software deployment process. Consequently, ongoing assembly and support practices require excessive time and specialized personnel that a small team cannot realistically maintain. Furthermore, the existing packaging is not optimized for rapid global air transport, and the chassis design needs human factors optimization for installation and removal in shipboard and austere environments. As a result, these cumulative limitations reduce overall operational availability, increase the burden on forward-deployed personnel, and raise long-term lifecycle costs. This delays the Navy's critical ability to rapidly produce, transport, install, and sustain this capability worldwide. Desired Outcomes & Constraints (Submissions may be for one or all requirements) 1. ?Process Design: Production Process: An operational, production-representative process capable of producing a defined pilot lot using controlled material, assembly, programming, inspection, test, configuration-management, packaging, and acceptance processes that is executable by a small team. Deployment Process: A lightweight, practical support process that enables a small team to provision and deploy the capability with minimal specialized infrastructure. Sustainment Process: A lightweight, practical support process that enables a small team to support, maintain, repair, reconfigure, and reconstitute the capability with minimal specialized infrastructure. 2. Packaging Plan: A rugged, efficient, and reusable packaging plan compatible with Joint Modular Intermodal Containers, Pelican cases, or comparable solutions that enable rapid global air transport and protect the system and associated components during storage, shipment, and operational movement. 3. Human Factors Optimization. The project seeks modified chassis, mounts, and installation/removal processes that reduce the time, tools, personnel, and specialized equipment required to install and uninstall the system in shipboard and austere field environments. Questions: Questions should be submitted per the Submission Guidelines section (below) no later than 1600 EST (4:00 PM Eastern Standard Time) by November 09, 2026. Submission Guidelines, Evaluation, and Eligibility Requirements: Refer to BAA N6893625S0001 ((see the official solicitation)) posted on (see the official solicitation) for submission guidelines and evaluation. While the BAA is an open announcement, the Government is requesting responses for this problem by 1600 EST (4:00 PM Eastern Standard Time) December 01, 2026. Required Submission Changes: When submitting the response, the cover page must specifically reference N6893625S0001-0001 to be considered.
No documents are listed for this notice.
jennifer felton
PrimaryELIZABETH SCHLICK
Points of contact as published on the notice.
Sources Sought posted
Sources Sought posted
Sources Sought posted
Sources Sought posted
Responses dueNext · in 14 days
Archive date on the official notice
Federal award history
Department of the Navy · NAICS 541715 · FY24–FY26
Recipients of past awards in this market, not the incumbent of this RFP.
| Fiscal year | Obligated ($) |
|---|---|
| FY2022 | 5,696,033,527.89 |
| FY2023 | 6,537,917,316.12 |
| FY2024 | 7,388,820,396.33 |
| FY2025 | 7,478,214,654.24 |
| FY2026 | 7,112,339,592.1 |
Federal contract award records, award types A–D, FY24–FY26. Updated Nov 13, 2026.
Same NAICS group or Research & Scientific Services, nearby first, ranked by score.
Department of the Air Force · Washington, DC
Why this score
31 days to respond, active buyer ($36.7B FY24–FY26).
Department of the Air Force · Langley AFB, VA
Why this score
Active buyer ($36.7B FY24–FY26), 133 days to respond.
National Geospatial-Intelligence Agency (NGA)
Why this score
34 days to respond, active buyer ($98.2B FY24–FY26).
Department of the Air Force
Why this score
Active buyer ($36.7B FY24–FY26), well documented (5 files).
Department of the Air Force
Why this score
Active buyer ($36.7B FY24–FY26), well documented (7 files).
Department of the Air Force
Why this score
Active buyer ($36.7B FY24–FY26), well documented (5 files).
RFP Detector Scores are informational.How we score →
1354 open RFPs from this issuer and its offices.
Department of the Navy
Why this score
Active buyer ($150M FY24–FY26); but only less than a day left.
Department of the Navy
Why this score
Not openly competed. Notice signals a sole-source or brand-name intent. The largest recipient took 20% of these dollars in FY24–FY26.
Why this score
Active buyer ($83.6B FY24–FY26); but only less than a day left.
Department of the Navy · Washington, DC
Why this score
New this week, full and open; but only 1 day left.
Department of the Navy
Why this score
Active buyer ($83.6B FY24–FY26), posted today; but only 1 day left.
Department of the Navy · Annapolis, MD
Why this score
New this week, clear, complete notice; but only 1 day left.
RFP Detector Scores are informational.How we score →
Official federal notice. Updated Nov 3, 2026.
Official solicitation:Sign in free to open the official solicitation
RFP Detector is an independent service and is not affiliated with any government agency. Scores are informational.
RFP Detector is not affiliated with the organization that issued this RFP. Always rely on the official notice and confirm every date and requirement with the issuer.