Silvus Brand Communications Indefinite Delivery Definite Quantity
Federal Aviation Administration · Oklahoma City, OK
Why this score
New this week, 9 days to respond.
Solicitation # F16_Aircraft_Noun_Trailing_Edge_NSN_1560_01_725_3383_PN_202312284-20Updated Mar 13, 2025Scored Nov 25, 2026
Closes in 6 days, Dec 1, 2026, 12:00 AM EST
Dec 1
Dec 1, 2026, 12:00 AM EST
Summary by RFP Detector
Department of the Air Force (F3YCCF 448 SCMW), part of the Department of Defense, posted a sources sought notice titled “F16_Aircraft_Noun_Trailing_Edge_NSN_1560_01_725_3383_PN_202312284-20” under solicitation number F16_Aircraft_Noun_Trailing_Edge_NSN_1560_01_725_3383_PN_202312284-20. It was posted on Mar 13, 2025. Responses are due Dec 1, 2026, 12:00 AM EST. No set-aside is listed. The place of performance is Tinker AFB, Oklahoma. The listed point of contact is Tracey Beringer.
RFP Detector Score
Every RFP starts at 50. Each factor adds or subtracts points compared with a typical RFP; unknown data counts as neutral.
Starts at 50
No value published, and there isn't enough award history to estimate one. Scored as neutral.
Full and open competition.
24 other RFPs from Department of the Air Force on RFP Detector in the past 12 months; no award history found.
Sources sought (market research, not a bid): 6 days to respond (due Dec 1, 2026, 12:00 AM EST). Tight.
Documents not listed, named contact with email and phone, 296-word description.
Posted 621 days ago.
50 + contributions = 44 (D, Limited)
Informational, not advice to bid or not bid. Score version 1.0.0, evaluated Nov 25, 2026.
Eligibility · Full and open competition
Full and open competition means the notice states no set-aside: any responsible business can respond, subject to the requirements in the notice.
Not stated in a form we could extract. See the official solicitation for requirements, evaluation criteria and submission steps.
From the official notice
1. JUSTIFICATION FOR ESTABLISHING A QUALIFICATION REQUIREMENT a. Criticality: Production of this Trailing Edge, Aircraft requires engineering source approval by the engineering support activity 416 SCMS/GUEAA in order to maintain the quality of the part. Failure to procure this Trailing Edge, Aircraft from a fully qualified source can result in structural or functional deficiencies that will degrade the mission capability of the F-16 Aircraft. b. Complexity, Manufacturing Processes, and/or Material Considerations: Inadequate control of characteristics associated with machining and processing of this Trailing Edge, Aircraft can result in product structural or durability degradation. Close tolerance matching of components is required. Special care and attention is required for surface finish, assembly, and sealing of this Trailing Edge, Aircraft to assure compliance with specified acceptance test requirements. c. Form, Fit, Function, and Interface: The qualification requirements specified herein are necessary to verify the structural and/or functional integrity and/or fit, form, and interface of the Trailing Edge, Aircraft being procured. 2. REASON WHY QUALIFICATION REQUIREMENT MUST BE DEMONSTRATED PRIOR TO ANY CONTRACT AWARD a. Completion of the specified pre-contract award qualification requirements are necessary to assure the government that the offeror is capable of producing the Trailing Edge, Aircraft in compliance with the applicable technical specification/data within the schedule and economic constraints of our contracts. There are significant technical and schedule risks which can only be minimized by a completion of the requirements prior to contract award. b. Qualification Requirement Cost Estimate: Estimated likely costs for testing and evaluation, which will be incurred by the potential offering party to become qualified: $4000. c. Qualification Time Completion Estimate: It is the estimate of the engineering support activity that completion of this qualification effort should require 180 days. This is based on complexity of the Trailing Edge, Aircraft and other factors.
No documents are listed for this notice.
Tracey Beringer
PrimaryPoints of contact as published on the notice.
Sources Sought posted
Responses dueNext · in 6 days
Archive date on the official notice
Same NAICS group or Other, nearby first, ranked by score.
Federal Aviation Administration · Oklahoma City, OK
Why this score
New this week, 9 days to respond.
Why this score
New this week, 23 days to respond.
Why this score
New this week, active issuer (24 RFPs); but thin documentation.
Department of the Air Force · Tinker AFB, OK
Why this score
New this week, active issuer (24 RFPs); but thin documentation.
Department of the Air Force · Tinker AFB, OK
Why this score
Clear, complete notice, active issuer (34 RFPs); but posted 469 days ago.
Department of the Air Force · Tinker AFB, OK
Why this score
Clear, complete notice, active issuer (34 RFPs); but posted 469 days ago.
RFP Detector Scores are informational.How we score →
762 open RFPs from this issuer and its offices.
Department of the Air Force · Warner Robins, GA
Why this score
Active buyer ($1.1B FY24–FY26); but only less than a day left.
Department of the Air Force · Patrick Air Force Base, FL
Why this score
But only less than a day left.
Department of the Air Force · JBSA Randolph, TX
Why this score
New this week, small-business set-aside; but only less than a day left.
Department of the Air Force · McConnell AFB, KS
Why this score
Full and open, clear, complete notice; but only less than a day left.
Department of the Air Force · Hanscom AFB, MA
Why this score
Small-business set-aside, new this week; but only less than a day left.
Department of the Air Force · Montgomery, AL
Why this score
New this week; but only less than a day left.
RFP Detector Scores are informational.How we score →
Official federal notice. Updated Mar 13, 2025.
Official solicitation:Sign in free to open the official solicitation
RFP Detector is an independent service and is not affiliated with any government agency. Scores are informational.
RFP Detector is not affiliated with the organization that issued this RFP. Always rely on the official notice and confirm every date and requirement with the issuer.