Allegheny River Lock and Dam 2 Interlock and Traffic Control System Replacement
Department of the Army · Pittsburgh, PA
Why this score
Small-business set-aside, active buyer ($22B FY24–FY26).
Solicitation # DOIRFBO260003Updated Dec 18, 2025
This RFP closed on Jan 4, 2026.
Jan 4, 2026
Responses were due Jan 4, 2026, 5:00 PM EST
Same NAICS group or Construction & Renovation, nearby first, ranked by score.
Department of the Army · Pittsburgh, PA
Why this score
Small-business set-aside, active buyer ($22B FY24–FY26).
Department of the Army · West Mifflin, PA
Why this score
Small-business set-aside, active buyer ($22B FY24–FY26).
Department of the Army
Why this score
Small-business set-aside, 22 days to respond.
Department of the Army
Why this score
Small-business set-aside, 42 days to respond.
Department of the Army · Fort Eustis, VA
Why this score
Small-business set-aside, 49 days to respond.
Department of the Army
Why this score
Small-business set-aside, 24 days to respond.
RFP Detector Scores are informational.How we score →
Summary by RFP Detector
Bureau of Reclamation (Great Plains Regional Office), part of the Department of the Interior, posted a sources sought notice titled “Heart Butte Dam Safety of Dams Modification” under solicitation number DOIRFBO260003. It was posted on Dec 18, 2025. The response deadline was Jan 4, 2026, 5:00 PM EST. It is classified under NAICS 237990 (Other Heavy and Civil Engineering Construction). No set-aside is listed. The listed point of contact is Stephens, Travis.
Score at publication
Every RFP starts at 50. Each factor adds or subtracts points compared with a typical RFP; unknown data counts as neutral.
Frozen at publication: closed RFPs are not re-scored.
Starts at 50
No value published. Typical award is about $631K: the median of 251 Bureau of Reclamation contracts over $25K awarded in NAICS 237990, FY24–FY26.
Full and open competition. The largest recipient took 26% of these dollars in FY24–FY26.
Bureau of Reclamation obligated $1.8B on NAICS 237990 across 278 contracts in FY24–FY26. 6 other notices from this office in the past 12 months.
Sources sought (market research, not a bid): 17 days to respond (due Jan 4, 2026, 5:00 PM EST).
Documents not listed, named contact with email and phone, 856-word description.
Posted today.
50 + contributions = 69 (B, Strong)
Informational, not advice to bid or not bid. Score version 1.0.0, evaluated Dec 18, 2025.
Eligibility · Full and open competition
Full and open competition means the notice states no set-aside: any responsible business can respond, subject to the requirements in the notice.
Not stated in a form we could extract. See the official solicitation for requirements, evaluation criteria and submission steps.
From the official notice
Heart Butte Dam Modification Sources Sought Notice December 18, 2025 This announcement is being used for market research and advanced planning purposes. Proposals are not requested and will not be accepted from this Sources Sought Notice. THIS IS NOT A SOLICITATION FOR PROPOSALS AND A CONTRACT WILL NOT BE AWARDED AS A RESULT OF THIS NOTICE. In accordance with FAR 15.201 Exchanges with Industry Before Receipt of Proposals, the United States Bureau of Reclamation (Reclamation), Missouri Basin Regional Office, previously hosted an Industry Day Event for the Heart Butte Dam Safety of Dams Modification (HBSDM) project located near Elgin, North Dakota. Please see special notice number DOIRFB0240024 on (see the official solicitation) for additional information regarding the industry day previously held in relation to this Sources Sought notice. Heart Butte Dam Safety Modification (HBSDM) Project ¿ Scope of Work The Heart Butte Dam Safety Modification project encompasses a comprehensive suite of civil, geotechnical, and structural construction activities designed to enhance the long-term safety, stability, and performance of the dam infrastructure. The scope of work includes, but is not limited to, the following major components: 1. Dewatering and Unwatering Systems ¿ Design, installation, operation, and maintenance of temporary dewatering and unwatering systems to facilitate dry working conditions within the outlet works and adjacent excavation zones. ¿ Systems shall be capable of managing both surface water and groundwater inflows throughout all phases of construction. 2. Cofferdam Works ¿ Engineering design, construction, and subsequent removal of temporary cofferdams to isolate work areas from reservoir and tailwater influences. ¿ Cofferdams shall meet all applicable safety and hydraulic performance criteria and be coordinated with dewatering operations. 3. Foundation Void Remediation ¿ Injection grouting to fill and stabilize voids or discontinuities within the foundation materials, accessed from within the outlet works conduit. ¿ Grouting operations shall be performed using low-mobility or chemical grout, as specified, to ensure compatibility with existing geologic conditions. 4. Outlet Works Conduit Rehabilitation ¿ Selective demolition of deteriorated concrete sections using saw cutting and hydro-demolition techniques. ¿ Installation of temporary structural shoring to support conduit integrity during repair operations. ¿ Reinforcement repair and reconstruction of the conduit to restore structural capacity and hydraulic performance. 5. Jet Grouting Operations ¿ Execution of jet grouting from both interior and exterior access points of the outlet works conduit to improve ground strength and reduce permeability. ¿ Grouting shall be performed in accordance with engineered patterns and quality control protocols to ensure uniform treatment. 6. Embankment Excavation ¿ Controlled excavation of designated portions of the existing dam embankment to facilitate installation of new filter and drainage systems. ¿ Excavation shall be staged and supported to maintain embankment stability and minimize risk to existing structures. 7. Filter and Drainage System Construction ¿ Construction of a new sand filter trench to intercept and manage seepage flows. ¿ Installation of a zoned filter and drain system, including sand filter layers, gravel drainage zones, and protective berms, designed to meet modern dam safety standards. 8. Toe Drain System Installation ¿ Placement of high-density polyethylene (HDPE) toe-drain piping systems, including associated observation wells and cleanouts, to enhance seepage monitoring and control. ¿ All components shall be installed to specified grades and alignments to ensure long-term functionality. 9. Earth Retaining Structures ¿ Furnishing and installation of pre-fabricated earth retaining wall systems to support excavation faces and permanent embankment features. ¿ Retaining walls shall be designed for site-specific loading conditions and integrated with adjacent structures. 10. Outlet Conduit Joint Sealing ¿ Application of chemical grouting techniques to seal joints within the outlet works conduit, preventing internal leakage and mitigating potential piping pathways. This scope of work is intended to address critical dam safety concerns through a combination of structural rehabilitation, seepage control, and foundation improvement measures. All work shall be executed in accordance with applicable federal, state, and local regulations, as well as project-specific technical specifications and quality assurance requirements. The government intends on awarding a Firm Fixed Price contract with a period of performance of approximately December 31, 2026, to June 30, 2030, or 1,277 calendar days. The Government is seeking interest from large businesses, 8(a) and small businesses, small-disadvantaged businesses, woman-owned small businesses, HubZone small businesses and/or service-disabled veteran owned small business concerns who have the specialized knowledge, experience, and resources necessary to successfully complete a project of this size, scope, and complexity. The NAICS Code for this project is 237990 Other Heavy and Civil Engineering Construction with a business size standard of $45.0 million. The Government will not reimburse any costs associated with responding to this Sources Sought Notice. This notice shall not be construed as a commitment by the Government to issue a solicitation or ultimately award a contract, nor does it restrict the Government to a particular acquisition approach. The Government will not be bound by this information if a solicitation is issued. Responses to this Sources Sought notice may include capability statements, past performance information, and any additional details that respondents believe demonstrate their company's capacity to undertake the size, scope, complexity, and magnitude of this effort. All responses should be submitted to Contracting Officer Mitchell Frost at mfrost@usbr.gov by 1700 EST on January 4, 2026.
No documents are listed for this notice.
Stephens, Travis
PrimaryPoints of contact as published on the notice.
Sources Sought posted
Responses were due
Federal award history
Department of the Interior · NAICS 237990 · FY24–FY26
Recipients of past awards in this market, not the incumbent of this RFP.
| Fiscal year | Obligated ($) |
|---|---|
| FY2022 | 533,657,683.27 |
| FY2023 | 545,224,326.37 |
| FY2024 | 451,660,250.79 |
| FY2025 | 820,601,583.05 |
| FY2026 | 494,275,554.77 |
Federal contract award records, award types A–D, FY24–FY26. Updated Nov 13, 2026.
5 open RFPs from this issuer and its offices.
Why this score
Recently updated; but limited documentation.
Why this score
25 days to respond, typical award ~$1.8M; but posted 159 days ago.
Bureau of Reclamation
Why this score
62 days to respond, typical award ~$2.8M; but thin documentation.
Bureau of Reclamation
Why this score
Typical award ~$1.8M, solicitation not out yet; but posted 164 days ago.
Bureau of Reclamation
Why this score
Small-business set-aside, solicitation not out yet; but posted 195 days ago.
Bureau of Reclamation
RFP Detector Scores are informational.How we score →
Official federal notice. Updated Dec 18, 2025.
Official solicitation:Sign in free to open the official solicitation
RFP Detector is an independent service and is not affiliated with any government agency. Scores are informational.
RFP Detector is not affiliated with the organization that issued this RFP. Always rely on the official notice and confirm every date and requirement with the issuer.