Amarillo and Big Springs Air Ambulance
Department of Veterans Affairs · Amarillo, TX
Why this score
SDVOSB set-aside, new this week.
Solicitation # CGSS26-COCO0003-0001Updated Nov 17, 2026Scored Nov 20, 2026
Nov 30
Nov 30, 2026, 12:00 AM EST
Summary by RFP Detector
US Coast Guard (CG-HCA-COCO-3), part of the Department of Homeland Security, posted a special notice titled “Intent to Sole Source USCG Museum Fabrication Final Option” under solicitation number CGSS26-COCO0003-0001. It was posted on Nov 17, 2026. Responses are due Nov 30, 2026, 12:00 AM EST. It is classified under NAICS 712110 (Museums) and product/service code M1JA. No set-aside is listed. The place of performance is New London, Connecticut. The listed point of contact is Domingo Cruz.
RFP Detector Score
Every RFP starts at 50. Each factor adds or subtracts points compared with a typical RFP; unknown data counts as neutral.
Starts at 50
No value published. Typical award is about $84K: the median of 168 federal contracts over $25K awarded in NAICS 712110, FY24–FY26.
Notice signals a sole-source or brand-name intent. The largest recipient took 51% of these dollars in FY24–FY26, so expect a strong incumbent.
Across all agencies, NAICS 712110 saw 243 contracts worth $112M in FY24–FY26. No agency-specific history found.
Special notice: 10 days to respond (due Nov 30, 2026, 12:00 AM EST).
Documents not listed, named contact with email, 756-word description.
Posted 2 days ago.
Capped at 30: not openly competed
Informational, not advice to bid or not bid. Score version 1.0.0, evaluated Nov 20, 2026.
Eligibility · Full and open competition
Full and open competition means the notice states no set-aside: any responsible business can respond, subject to the requirements in the notice.
Not stated in a form we could extract. See the official solicitation for requirements, evaluation criteria and submission steps.
From the official notice
1. Description of Requirement The United States Coast Guard (USCG), Director of Operational Logistics (DOL) / Contracting Activity, announces its intent to negotiate and award a sole-source contract modification/task order to Design and Production, Inc. (D&P), located at 7110 Rainwater Place, Lorton, VA 22079. This requirement encompasses the final phase of comprehensive professional design refinement, fabrication, delivery, systems integration, and on-site installation services necessary to achieve full operational readiness for the permanent exhibitions of the National Coast Guard Museum (NCGM) prior to its scheduled grand opening in 2027. The scope of work under this action includes, but is not limited to: Exhibit Fabrication: Precision fabrication and final assembly of specialized, museum-grade physical exhibits, interactive displays, and artifact mounts. Archival Case Integration & Security: Structural fabrication, microclimate control integration, and multi-tier physical and electronic security systems integration across seventy (70) custom archival display cases. Graphics & Digital Production: Final production and high-resolution imaging of environmental typography, historical imagery, and large-format digital artwork. Integrated Site Installation & Coordination: Comprehensive on-site installation management, including specialized theatrical and conservation exhibit lighting, structured low-voltage signal cabling, audiovisual network backbone integration, and critical structural alignment with the base-building prime architectural and engineering design. 2. Statutory Authority and Rationale for Sole-Source Award The statutory authority permitting this sole-source acquisition is 41 U.S.C. § 3304(a)(1), as implemented by FAR 6.302-1(a)(2)(iii): "Only One Responsible Source and No Other Supplies or Services Will Satisfy Agency Requirements" for the continuation of highly specialized services. Key Justification Factors: Unacceptable Delays to Mission Schedule: Design and Production, Inc. has served as the sole prime contractor responsible for the preceding conceptual, schematic, and detailed engineering phases of the NCGM exhibits. A transition to any other vendor at this critical milestone would necessitate a re-baselining of engineering drawings, building interfaces, and vendor tooling, causing an estimated 12- to 18-month operational delay. This delay would directly jeopardize the congressionally and publicly recognized 2027 opening timeline. Substantial Duplication of Cost: Onboarding a new contractor would require complete engineering re-validation, structural interface re-certification, project management re-mobilization, and redesign of seventy (70) integrated archival display cases. The Government estimates that this transition would result in $5,000,000 to $7,000,000 in duplicated costs that cannot be expected to be recovered through competitive procurement. Integrated Technical Liability & Proprietary Fit: D&P possesses preexisting proprietary structural calculations, digital assets, and tooling specifications engineered directly into the museum's ongoing physical construction. Introducing a separate fabrication contractor at this terminal phase creates severe contractual warranty and liability fractures regarding case tolerances and museum environmental performance. 3. Notice to Industry (Pursuant to FAR 5.207(c)(16)(ii)) THIS SYNOPSIS IS PUBLISHED FOR INFORMATIONAL PURPOSES ONLY AND DOES NOT CONSTITUTE COMPETITIVE SOLICITATION OR A REQUEST FOR COMPETITIVE PROPOSALS (RFP). No formal solicitation document is available. A determination by the Government not to compete this proposed action based upon responses to this notice is solely within the discretion of the Government. Information received will normally be considered solely for the purpose of determining whether to conduct competitive procurement in the future. 4. Capability Statement Submission Criteria All responsible sources may submit a capability statement that demonstrates the technical capability and capacity to fulfill the requirements described herein. To be considered substantive, capability statements must provide clear, convincing, and documented evidence addressing each of the following mandatory criteria: Seamless Assumption of Structural Liability: Detailed demonstration of how the respondent could immediately adopt, validate, and assume full structural and environmental liability for the existing design packages and proprietary display case engineering without voiding existing warranties or requiring baseline redesign. Archival & Security Integration Experience: Documented past performance (within the past five years) delivering turnkey fabrication and security integration for at least fifty (50) high-security museum display cases conforming to federal preservation and security standards. Schedule Feasibility: A detailed milestone and transition schedule demonstrating the ability to mobilize immediately, complete all fabrication, and achieve full operational turnover in alignment with the fixed 2027 museum commissioning date without schedule slippage. Cost Duplication Mitigation: A verifiable plan demonstrating how the vendor would eliminate or absorb the estimated $5M–$7M duplication in engineering, tooling, and facility coordination expenses without passing these costs to the Government. 5. Submission Details & Instructions Response Deadline: [Insert Date, minimum 15 calendar days from posting, e.g., Month DD, YYYY at 4:00 PM EST] Submission Format: Responses must be submitted electronically in searchable PDF format (maximum [e.g., 10–15] pages, 11-point font minimum). Proprietary information must be clearly marked. Point of Contact (POC): Contracting Officer: domingo.cruz2@uscg.mil Telephonic inquiries and capability statements delivered after the deadline will not be accepted or evaluated.
No documents are listed for this notice.
Domingo Cruz
PrimaryPoints of contact as published on the notice.
Special Notice posted
Responses dueNext · in 9 days
Archive date on the official notice
Federal award history
All agencies · NAICS 712110 · FY24–FY26
Recipients of past awards in this market, not the incumbent of this RFP.
| Fiscal year | Obligated ($) |
|---|---|
| FY2022 | 26,358,048.87 |
| FY2023 | 31,414,231.09 |
| FY2024 | 35,262,249.12 |
| FY2025 | 38,618,399.85 |
| FY2026 | 37,892,947.3 |
Federal contract award records, award types A–D, FY24–FY26. Updated Nov 15, 2026.
Same NAICS group or Events, Travel & Hospitality, nearby first, ranked by score.
Department of Veterans Affairs · Amarillo, TX
Why this score
SDVOSB set-aside, new this week.
Department of the Army
Why this score
25 days to respond, posted today; but limited documentation.
Department of the Army · Massachusetts
Why this score
25 days to respond, small-business set-aside; but small typical award (~$54K).
Department of Veterans Affairs · Fayetteville, NC
Why this score
14 days to respond, recently updated.
Department of Veterans Affairs · Georgia
Why this score
SDVOSB set-aside, typical award ~$1.2M; but thin documentation.
Department of the Air Force · USAF Academy, CO
Why this score
Small-business set-aside, new this week; but small typical award (~$63K).
RFP Detector Scores are informational.How we score →
139 open RFPs from this issuer and its offices.
US Coast Guard · Curtis Bay, MD
Why this score
Not openly competed. Notice signals a sole-source or brand-name intent. The largest recipient took 47% of these dollars in FY24–FY26, so expect a strong incumbent.
Why this score
New this week, clear, complete notice; but only 2 days left.
Why this score
Active buyer ($649M FY24–FY26); but small typical award (~$70K).
US Coast Guard · Curtis Bay, MD
Why this score
Active buyer ($9.4B FY24–FY26), clear, complete notice; but only 3 days left.
Why this score
New this week, full and open; but small typical award (~$53K).
Why this score
New this week; but limited award history ($1.2M FY24–FY26).
RFP Detector Scores are informational.How we score →
Official federal notice. Updated Nov 17, 2026.
Official solicitation:Sign in free to open the official solicitation
RFP Detector is an independent service and is not affiliated with any government agency. Scores are informational.
RFP Detector is not affiliated with the organization that issued this RFP. Always rely on the official notice and confirm every date and requirement with the issuer.