Department of Energy, AT Courtyard Construction and Site Utility Infrastructure
Department of the Army · West Mifflin, PA
Why this score
Small-business set-aside, active buyer ($22B FY24–FY26).
Solicitation # W912DQ26RA035Updated Mar 18, 2026
$18.8M
to MOBLEY CONTRACTORS, INCAward W912DQ26CA044
Same NAICS group or Construction & Renovation, nearby first, ranked by score.
Department of the Army · West Mifflin, PA
Why this score
Small-business set-aside, active buyer ($22B FY24–FY26).
Department of the Army
Why this score
Small-business set-aside, 23 days to respond.
Department of the Army · Fort Eustis, VA
Why this score
Small-business set-aside, 50 days to respond.
Department of the Army
Why this score
Small-business set-aside, 25 days to respond.
Department of the Army
Why this score
Small-business set-aside, 43 days to respond.
Department of the Army
Why this score
Small-business set-aside, 24 days to respond.
RFP Detector Scores are informational.How we score →
Summary by RFP Detector
Department of the Army (W071 ENDIST KANSAS CITY), part of the Department of Defense, posted a solicitation titled “Kansas City Levees UPRR Closure Structure” under solicitation number W912DQ26RA035. It was first posted on Mar 9, 2026 and has been updated 2 times since. The response deadline was Apr 23, 2026, 11:00 AM CDT. It is classified under NAICS 237990 (Other Heavy and Civil Engineering Construction) and product/service code Y1LB. No set-aside is listed. An award was reported to MOBLEY CONTRACTORS, INC on Aug 21, 2026 for $18,803,862. The listed point of contact is Myleesa France.
Score at publication
Every RFP starts at 50. Each factor adds or subtracts points compared with a typical RFP; unknown data counts as neutral.
Frozen at publication: closed RFPs are not re-scored.
Starts at 50
No value published. Typical award is about $2.4M: the median of 1,434 Army contracts over $25K awarded in NAICS 237990, FY24–FY26.
Full and open competition. The largest recipient took 12% of these dollars in FY24–FY26, and spending is spread across many vendors.
Army obligated $22B on NAICS 237990 across 1,618 contracts in FY24–FY26. 53 other notices from this office in the past 12 months.
Solicitation, bids due: 45 days to respond (due Apr 23, 2026, 11:00 AM CDT).
Documents not listed, 2 named contacts with email and phone, 240-word description.
Posted today.
50 + contributions = 95 (A, Excellent)
Informational, not advice to bid or not bid. Score version 1.0.0, evaluated Mar 9, 2026.
Eligibility · Full and open competition
Full and open competition means the notice states no set-aside: any responsible business can respond, subject to the requirements in the notice.
Not stated in a form we could extract. See the official solicitation for requirements, evaluation criteria and submission steps.
From the official notice
The Kansas City District, United States Army Corps of Engineers (USACE), has a need for the construction of four closure structures (two stoplog and two sandbag) located on both sides of two Union Pacific Railroad (UPRR)- owned bridges crossing the Armourdale (ARM; West side of the Kansas River) and Central Industrial District (CID; East side of the Kansas River) Levee Units. The south bridge (UPRR #3) contains two sets of railroad tracks: Mainline Track No. 1 and Mainline Track No. 2. The north bridge (MOPAC) contains two sets of railroad tracks: Track No. 3 and Track No. 202. Floodwalls are to be constructed to the north and the south of the closure structures and tie into existing floodwalls on the ARM side. Closure structures on the CID side connect to earthen levees. Stoplogs and all stoplog components need to be fabricated for the project, and once construction of the stoplog closure structures is complete, a test-fit of the stoplogs across Mainline Track No. 1 and Mainline Track No. 2 is required. To facilitate construction and test-fit of the stop logs, UPRR will require the approval of construction submittals, including a phasing plan, temporary shoring plans, and obtaining temporary track outages. Construction will require flagging operations for all activities within 25 feet of the track or if equipment has the potential to foul track. Stoplog storage structures to store all stoplog components also need to be provided on each levee unit.
No documents are listed for this notice.
Myleesa France
PrimaryDavid Walsh
Points of contact as published on the notice.
Solicitation posted
Solicitation posted
Solicitation posted
Responses were due
Awarded to MOBLEY CONTRACTORS, INC
· $18.8M
Award Notice posted
Federal award history
Department of the Army · NAICS 237990 · FY24–FY26
Recipients of past awards in this market, not the incumbent of this RFP.
| Fiscal year | Obligated ($) |
|---|---|
| FY2022 | 6,964,202,710.65 |
| FY2023 | 5,771,565,912.07 |
| FY2024 | 7,045,473,563.73 |
| FY2025 | 5,563,247,668.1 |
| FY2026 | 9,406,703,869.97 |
Federal contract award records, award types A–D, FY24–FY26. Updated Nov 13, 2026.
874 open RFPs from this issuer and its offices.
Department of the Army
Why this score
Small-business set-aside, clear, complete notice; but only less than a day left.
Department of the Army
Why this score
Recently updated; but only less than a day left.
Department of the Army · Rock Island, IL
Why this score
Active buyer ($22B FY24–FY26), new this week; but only less than a day left.
Department of the Army · Rock Island, IL
Why this score
Active buyer ($22B FY24–FY26), new this week; but only less than a day left.
Department of the Army · Rock Island, IL
Why this score
Active buyer ($22B FY24–FY26), new this week; but only less than a day left.
Department of the Army
Why this score
Small-business set-aside, recently updated; but only 1 day left.
RFP Detector Scores are informational.How we score →
Official federal notice. Updated Mar 18, 2026.
Official solicitation:Sign in free to open the official solicitation
RFP Detector is an independent service and is not affiliated with any government agency. Scores are informational.
RFP Detector is not affiliated with the organization that issued this RFP. Always rely on the official notice and confirm every date and requirement with the issuer.