What this RFP is about

Department of Energy (Battelle Energy Alliance–doe Cntr) posted a sources sought notice titled “Long-Duration Energy Storage (LDES) Battery System” under solicitation number INL-26-050. It was first posted on Aug 24, 2026 and has been updated 4 times since. Responses are due Dec 8, 2026, 11:59 PM MST. No set-aside is listed. The place of performance is Idaho Falls, Idaho. The listed point of contact is Chase Egbert.

Key facts

Sector
Federal
Notice type
Sources sought
As posted: Sources Sought
Category
Other
NAICS
Not stated
PSC
Not stated
Place of performance
Idaho Falls, ID
ZIP 83415
Value
Not stated
Solicitation #
INL-26-050
Listing
Official federal notice

RFP Detector Score

Score breakdown

Every RFP starts at 50. Each factor adds or subtracts points compared with a typical RFP; unknown data counts as neutral.

Starts at 50

  • Value0.0unknown

    No value published, and there isn't enough award history to estimate one. Scored as neutral.

  • Competition & access−0.6estimated

    Full and open competition.

  • Issuer & market+2.3estimated

    18 other RFPs from Department of Energy on RFP Detector in the past 12 months; no award history found.

  • Time & stage+5.4measured

    Sources sought (market research, not a bid): 18 days to respond (due Dec 8, 2026, 11:59 PM MST).

  • Clarity & completeness+2.3estimated

    Documents not listed, named contact with email, 902-word description.

  • Freshness+4.1measured

    Updated 3 days ago.

50 + contributions = 63 (C, Fair)

Score trend, last 30 daysScore history: 65, 64, 63

Informational, not advice to bid or not bid. Score version 1.0.0, evaluated Nov 21, 2026.

Requirements & submission

Eligibility · Full and open competition

Full and open competition means the notice states no set-aside: any responsible business can respond, subject to the requirements in the notice.

Not stated in a form we could extract. See the official solicitation for requirements, evaluation criteria and submission steps.

From the official notice

Description

902 words

INTRODUCTION Idaho National Laboratory (INL) and Argonne National Laboratory (ANL) are seeking information from organizations that can provide long-duration energy storage (LDES) battery systems for benchmark performance testing at National Laboratory facilities. This EOI aims to identify qualified technologies and suppliers, inform technical planning, and refine subsequent acquisition steps. BACKGROUND Idaho National Laboratory (INL) and Argonne National Laboratory (ANL) are seeking LDES technologies that will undergo benchmark performance testing at their facilities. Acceptable technologies include rechargeable electrochemical battery systems that: Can be configured into a module dimension, namely, 100-150 kWh, that can sustain 10-15 kW over ten hours. LxWxH shall not exceed 7x7x7 ft. Two such modules are sought. Can be configured into a full-size dimension, namely, 1000-1500 kWh, that can sustain 100-150 kW over ten hours. Anticipated dimension is one 40-ft shipping container, or two 20-ft containers. One such full-size system is sought. Can be operated between 0 to 50 ºC without more than 20% loss in power performance and 20% more aging (energy capacity loss) than that observed at a baseline condition of operating at 25 ºC. Provide an AC/DC interface that facilitates testing and logging of all system parameters, Will arrive at INL and ANL sites as pre-built systems, with only minor connections required prior to operation, has a lifetime under typical field conditions of no less than fifteen (15) years (lifetime estimate basis to be disclosed). It is required that data acquired from INL and ANL testing will be available for publication. Unacceptable technologies include: Lithium-ion, Lithium metal, Lead-acid, Redox flow batteries, any non-rechargeable system, any non-electrochemical system, any system requiring on-site fabrication, any system lacking sufficient durability in typical field conditions (<15 yr). SCOPE OF WORK These requirements define the minimum technical, safety, performance, and documentation expectations for acceptable long duration energy storage (LDES) systems. The system shall be capable of providing at least 10" hours” of continuous discharge at rated power and exporting both AC and DC power. Technology & Duration System must deliver ?10 hours at rated power under nominal conditions. Offeror must describe the non?lithium electrochemical technology, provide technical evidence (test data, certifications, field deployments), and outline any operational constraints. Provide dimensions, weight, expected lifetime, and fully burdened cost for module?scale and full?scale systems. Rated Power & Energy Modules: ?10 kW continuous power; ?100 kWh usable energy (10 hours). Bidirectional charging/discharging within stated environmental limits. Specify rated power/energy, overload capability, and electrical operating ranges. Full?Scale System: ?100 kW continuous power; ?1,000 kWh usable energy (10 hours). Bidirectional operation; same specification requirements as modules. AC/DC Interface & Controls AC interface: 3?phase, 60 Hz, 480 VAC; include single?line diagram and protection/connection requirements. DC interface: isolated export; 800–1500 VDC; specify current rating, transient behavior, grounding/isolation, converter needs. Preferred multi?port inverter providing simultaneous AC/DC power. Provide monitoring metrics, control interfaces, SCADA protocol support (Modbus TCP/IP, DNP3, IEC 61850), and Interface Control Document (ICD). Safety, Compliance & Hazard Mitigation Must meet NFPA 855, UL 9540/9540A (or equivalent), NEC/IEEE standards. Provide certifications or plan to obtain them. Submit hazard assessment (chemical, thermal, fire, explosion, environmental). Required safety systems: electrical protections, fire detection/notification, proper labeling/signage. Preferred: emergency stop, external alarm signaling/suppression. Include emergency response instructions. Performance, Availability & Degradation At commissioning, system must deliver rated power for ?10 hours. Specify initial and end?of?period usable capacity, round?trip efficiency, and availability target (?95% recommended). Provide maintenance intervals, corrective response times, and recommended spare parts. Degradation model preferred. Documentation, Testing & Support Provide 70%, 90%, and final design packages for module and full-scale systems. Conduct Factory Acceptance Testing (FAT) and Site Acceptance Testing (SAT); submit reports. Provide operation/maintenance manuals and preventative maintenance plan (delivered ?1 month before system delivery). Include remote monitoring and full project-period support, including troubleshooting and decommissioning support. Schedule, Delivery & Commissioning Provide full project schedule (design through testing). Modules delivered to INL within ~3 months of final design acceptance; full?scale system delivered to ANL within ~6 months. Perform onsite commissioning (inspection, energization, testing, controls configuration, safety verification). SAT completion preferred within 1 month of installation; system becomes available only after ANL formal acceptance. PROCESS This EOI is the first step in identifying interested and qualified vendors for future solicitation. Responses may be used to inform the development of a formal solicitation list. Selected vendors may be invited to participate in a Request for Proposal (RFP) process for award consideration. SUBMITTAL REQUIREMENTS Interested vendors must submit a single consolidated PDF or Word document containing: NAICS code and business size classification Cover letter with organization name, point of contact, and summary of proposed LDES technology Technology description (chemistry, architecture, evidence of ?10?hour discharge) Physical characteristics (dimensions/weight of modules and full?scale systems; installation/shipping details Interfaces (AC single?line diagram; DC specifications; supported communication protocols) Safety & compliance documentation (NFPA/UL/NEC/IEEE; hazard assessment; emergency response guidance; safety systems) Performance data (rated power/energy, round?trip efficiency, availability target, degradation model) Expected lifetime of system under vendor-specified field-type conditions, and basis for lifetime estimate (data, models, etc.). Operations & maintenance plan (maintenance intervals, spares, monitoring capability, support) Project schedule (design, manufacturing, delivery, commissioning/testing milestones) Commercials (indicative pricing for module and full-scale systems; warranty/support terms) Deadline for submission: December 8, 2026 Submit to: Chase.Egbert@inl.gov Only select respondents, as determined by BEA, will receive an invitation to participate in the anticipated RFP solicitation. PROPRIETARY INFORMATION Because information received in response to this EOI may be business sensitive or proprietary to the responding party, respondents must mark information in their responses accordingly.

Documents

No documents are listed for this notice.

Contacts

Points of contact as published on the notice.

Timeline & history

  1. Sources Sought posted

  2. Sources Sought posted

  3. Sources Sought posted

  4. Sources Sought posted

  5. Sources Sought posted

  6. Archive date on the official noticeNext · in 17 days

  7. Responses due

Similar open RFPs

Same NAICS group or Other, nearby first, ranked by score.

Limited

TAN AHU Replacement

Department of Energy · Idaho

FederalSources sought
Posted Mar 24Due Jan 29, 2027, 11:59 PM MST (in 70 days)Federal notice
Limited

TAN 675 Lighting Controls Upgrade

Department of Energy · Idaho Falls, ID

FederalSources sought
Posted Mar 24Due Jan 29, 2027, 11:59 PM MST (in 70 days)Federal notice
Strong

Munro DS FQ4

US Coast Guard · Alameda, CA

FederalSources sought
Posted Nov 20Due Dec 11, 2026, 12:00 PM EST (in 20 days)Federal notice

RFP Detector Scores are informational.How we score →

More from Department of Energy

139 open RFPs from this issuer and its offices.

Limited

Dilo Gas Cart Training and Maintenance Services

Department of Energy

FederalSpecial noticeEducation & Training
Posted Nov 19Due Nov 23, 2026, 11:30 AM MST (in 2 days)Federal notice
Limited

Outdoor IR Dome Camera and Adapter

Department of Energy · Oak Ridge, TN

FederalCombined synopsisSupplies, Equipment & Furniture
Posted Nov 16Due Nov 23, 2026, 5:00 PM EST (in 2 days)Federal notice
Poor

Radio Detection Kit with Accessories - No Alternatives

Department of Energy · New York

FederalSolicitationSupplies, Equipment & Furniture
Posted Nov 4Due Nov 23, 2026, 5:00 PM EST (in 2 days)Federal notice
Limited

Mounting Pads

Department of Energy · Oak Ridge, TN

FederalSolicitationSupplies, Equipment & Furniture
Posted Sep 3Due Nov 24, 2026, 12:00 PM EST (in 3 days)Federal notice
Limited

ITRON Software Maintenance Renewal

Department of Energy

FederalSpecial noticeIT & Software
Posted Nov 17Due Nov 24, 2026, 12:00 PM CST (in 3 days)Federal notice
Poor

Poplar Williston Project

Department of Energy

FederalSolicitationSmall business set-asideSupplies, Equipment & Furniture+1
Posted Nov 10Due Nov 24, 2026, 11:30 AM MST (in 3 days)Federal notice

RFP Detector Scores are informational.How we score →

About this notice

Official federal notice. Updated Nov 17, 2026.

Official solicitation:Sign in free to open the official solicitation

RFP Detector is an independent service and is not affiliated with any government agency. Scores are informational.

RFP Detector is not affiliated with the organization that issued this RFP. Always rely on the official notice and confirm every date and requirement with the issuer.