Skip to content
FederalIFBClosed Federal notice

ND NP THRO 204(1) Buck Hill Road

Federal Highway Administration› 6982AF CENTRAL FEDERAL LANDS DIVISI Medora, ND

Solicitation # 6982AF25B000004Updated Nov 3, 2026

This RFP closed on Nov 3, 2026.

The details below are kept for reference. Similar open RFPs are listed first.

Closed

Nov 3, 2026

Responses were due Nov 3, 2026, 2:00 PM MST

Posted
Oct 1, 2026
Closed
Nov 3, 2026

Similar open RFPs

Same NAICS group or Construction & Renovation, nearby first, ranked by score.

Strong

ND OMAD 2025(1) Minuteman Missile Access Road

Federal Highway Administration · Minot, ND

FederalSolicitationSmall business set-asideConstruction & Renovation+1
Posted Oct 1Due Dec 2, 2026, 1:00 PM MST (in 8 days)Federal notice
Strong

CRAC Units Replacement for MCE 1211 at GFAFB, ND

Department of the Air Force · Grand Forks AFB, ND

FederalCombined synopsisSmall business set-asideConstruction & Renovation+1
Posted Oct 29Due Nov 30, 2026, 1:30 PM CST (in 6 days)Federal notice
Fair

Flooring Requirement Contract Solicitation

Department of the Air Force · Grand Forks AFB, ND

FederalRFQSmall business set-asideConstruction & Renovation+1
Posted Nov 2Due Dec 3, 2026, 3:00 PM CST (in 9 days)Federal notice

RFP Detector Scores are informational.How we score →

Summary by RFP Detector

What this RFP is about

Federal Highway Administration (6982AF CENTRAL FEDERAL LANDS DIVISI), part of the Department of Transportation, posted an invitation for bids titled “ND NP THRO 204(1) Buck Hill Road” under solicitation number 6982AF25B000004. It was first posted on Oct 1, 2026 and has been updated 6 times since. The response deadline was Nov 3, 2026, 2:00 PM MST. It is classified under NAICS 237310 (Highway, Street, and Bridge Construction) and product/service code Y1LB. No set-aside is listed. The place of performance is Medora, North Dakota. The listed point of contact is Kelly Palmer.

Key facts

Sector
Federal
Notice type
IFB
As posted: Solicitation
PSC
Y1LB
Place of performance
Medora, ND
Value
Not statedTypical award in this market ≈ $3.8M
Solicitation #
6982AF25B000004
Listing
Official federal notice

Score at publication

Score breakdown

Every RFP starts at 50. Each factor adds or subtracts points compared with a typical RFP; unknown data counts as neutral.

Frozen at publication: closed RFPs are not re-scored.

Starts at 50

  • Value+9.7estimated

    No value published. Typical award is about $3.8M: the median of 295 Federal Highway Administration contracts over $25K awarded in NAICS 237310, FY24–FY26.

  • Competition & access+5.6measured

    Full and open competition. The largest recipient took 7% of these dollars in FY24–FY26, and spending is spread across many vendors.

  • Issuer & market+3.7measured

    Federal Highway Administration obligated $2.2B on NAICS 237310 across 296 contracts in FY24–FY26. 11 other notices from this office in the past 12 months.

  • Time & stage+12.2measured

    Solicitation, bids due: 33 days to respond (due Nov 3, 2026, 2:00 PM MST).

  • Clarity & completeness+2.3estimated

    Documents not listed, named contact with email, 463-word description.

  • Freshness+9.0measured

    Posted today.

50 + contributions = 92 (A, Excellent)

Informational, not advice to bid or not bid. Score version 1.0.0, evaluated Oct 1, 2026.

Requirements & submission

Eligibility · Full and open competition

Full and open competition means the notice states no set-aside: any responsible business can respond, subject to the requirements in the notice.

Not stated in a form we could extract. See the official solicitation for requirements, evaluation criteria and submission steps.

From the official notice

Description

463 words

INVITATION FOR BID (IFB) FULL AND OPEN COMPETITION WITH HUBZONE PREFERENCE PROJECT NUMBER: ND NP THRO 204(1) PROJECT NAME: Buck Hill Road PROJECT DESCRIPTION: Buck Hill Road, also known as Route 204, is located in Billings County within Theodore Roosevelt (THRO) National Park (NP) in the southeast portion of the park near the South Unit, Medora, ND. The route is located in mountainous terrain at approximate elevation of 2,500 to 2,800 feet. It begins at the intersection of Buck Hill Road and South Unit Scenic Loop Road. The route then proceeds southeasterly for approximately ¾ of a mile and ascends approximately 300 feet vertically to the Buck Hill Overlook parking area. The route is located entirely within Theodore Roosevelt NP. There is one (1) base schedule and no options. SCOPE OF THE WORK: The project includes three major components; 1) Approximately ¾ mile of roadway rehabilitation, 2) Approximately 1,000 linear feet of deep subexcavation to address an existing landslide, and 3) Reconstructing the existing Buck Hill Overlook parking lot. The main roadway rehabilitation includes pulverization of the existing roadway, placement of new roadway aggregate, and new hot asphalt concrete pavement and replacing existing guardrail with new guardrail. Additionally, this work includes constructing new paved ditches and installing concrete curb and gutter along most of the length of the roadway. This includes installation of several drainage inlets and culverts as well as new striping and signage. The deep subexcavation work includes removal of approximately existing unsuitable material to a 10 feet depth for a continuous 1,000 linear foot length of roadway and replacing with suitable material with geosynthetic reinforcement and installing subsurface drainage. A geotechnical report will be provided with the PS&E package. Reconstructing the existing Buck Hill Overlook parking lot expands and adds more parking spaces and accommodates larger trucks, recreational vehicles, and tour buses. The work includes removing the existing pavement, placing embankment material, new aggregate base, and new hot asphalt concrete pavement. This work also includes constructing accessible parking, placing new concrete sidewalk and curb and gutter, and striping and signage. New trash receptacles and stone benches will be installed as part of the new parking area. Buck Hill Road may be closed for the duration of construction. PRINCIPAL WORK ITEMS: Approximate quantities for major work items: 11,000 cubic yards of subexcavation 1,000 linear feet of geocomposite sheet drain 2,000 tons of hot asphalt concrete pavement 5,000 tons of roadway aggregate 550 linear feet of 24-inch pipe culvert (thick walled HDPE, fused) 5,100 linear feet of concrete curb and gutter (tan and onyx colored) 650 square yards of concrete sidewalk (tan colored) 1,600 linear feet of guardrail ANTICIPATED SCHEDULE: Advertisement – October 2026 Award - January 2027 Construction – April 2027 through November 2027 ESTIMATED COST RANGE: Between $5,000,000 and $10,000,000

Documents

No documents are listed for this notice.

Contacts

Points of contact as published on the notice.

Timeline & history

  1. Solicitation posted

  2. Solicitation posted

  3. Solicitation posted

  4. Solicitation posted

  5. Solicitation posted

  6. Solicitation posted

  7. Responses were due

  8. Solicitation posted

Federal award history

Market context

Federal Highway Administration · NAICS 237310 · FY24–FY26

Typical award (over $25K)
$3.8M
Contracts awarded
296
Total obligated
$2.2B
Award size, Federal Highway Administration · NAICS 237310 contracts, FY24–FY26 (log scale)
P25 $1.7MMedian $3.8MP75 $7.5MP90 $13.4M

Largest recipients in this market

  • GRANITE CONSTRUCTION COMPANY$156.7M7%
  • ESTES BROS. CONST. INC.$121.4M6%
  • AMRIZE SOUTHWEST INC$96.4M4%

Recipients of past awards in this market, not the incumbent of this RFP.

View as table
Fiscal yearObligated ($)
FY20221,009,471,111.67
FY20231,134,815,100.66
FY2024713,219,707.62
FY2025655,836,418.67
FY2026782,716,848.92

Federal contract award records, award types A–D, FY24–FY26. Updated Nov 13, 2026.

More from Federal Highway Administration

39 open RFPs from this issuer and its offices.

Poor

FY27 Aashto Accreditation and Inspection Services

Federal Highway Administration · Sevierville, TN

FederalCombined synopsisEngineering & Architecture
Posted Nov 13Due Nov 27, 2026, 12:00 PM EST (in 3 days)Federal notice
Strong

NM FLAP SR35(1) Grant County Bridges

Federal Highway Administration · Mimbres, NM

FederalPresolicitationConstruction & Renovation
Posted Nov 16Due Dec 1, 2026, 2:00 PM MST (in 7 days)Federal notice
Strong

UT NP ARCH 100(2) Bridges on Delicate Arch Road

Federal Highway Administration · Moab, UT

FederalSolicitationConstruction & Renovation
Posted Oct 6Due Dec 1, 2026, 2:00 PM MST (in 7 days)Federal notice
Strong

ND OMAD 2025(1) Minuteman Missile Access Road

Federal Highway Administration · Minot, ND

FederalSolicitationSmall business set-asideConstruction & Renovation+1
Posted Oct 1Due Dec 2, 2026, 1:00 PM MST (in 8 days)Federal notice

RFP Detector Scores are informational.How we score →

About this notice

Official federal notice. Updated Nov 3, 2026.

Official solicitation:Sign in free to open the official solicitation

RFP Detector is an independent service and is not affiliated with any government agency. Scores are informational.

RFP Detector is not affiliated with the organization that issued this RFP. Always rely on the official notice and confirm every date and requirement with the issuer.