Cnsp and Atgpac Surface Force Training and Readiness Support
Department of the Navy · San Diego, CA
Why this score
Active buyer ($68B FY24–FY26), small-business set-aside; but thin documentation.
Solicitation # Project No. 4198First seen Nov 17, 2026 · confirm details on the official solicitationUpdated Nov 17, 2026
This RFP closed on Nov 19, 2026.
Nov 19, 2026
Responses were due Nov 19, 2026, 4:00 PM PST
Same NAICS group or Engineering & Architecture, nearby first, ranked by score.
Department of the Navy · San Diego, CA
Why this score
Active buyer ($68B FY24–FY26), small-business set-aside; but thin documentation.
Federal Aviation Administration · Paso Robles, CA
Why this score
Small-business set-aside, active buyer ($4B FY24–FY26).
Department of the Navy · Port Hueneme, CA
Why this score
Active buyer ($68B FY24–FY26), clear, complete notice.
Department of Veterans Affairs · Long Beach, CA
Why this score
New this week, active buyer ($634M FY24–FY26); but small typical award (~$75K).
National Aeronautics and Space Administration · Moffett Field, CA
Why this score
Small-business set-aside, new this week; but only 3 days left.
Department of the Air Force · Travis AFB, CA
Why this score
Small-business set-aside, posted 8 days ago; but small typical award (~$141K).
RFP Detector Scores are informational.How we score →
Summary by RFP Detector
The City of Orinda is seeking a consulting engineering firm to produce a complete set of plans, specifications and estimates for its 2027 annual pavement rehabilitation program. The work covers 50 street segments totaling roughly 56,500 linear feet, with treatments such as preventive maintenance, micro surfacing, cape seal and mill and overlay. Responsibilities include field assessment of pavement, base failures, utilities and ADA curb ramps, monument preservation, utility coordination, staged design submittals at 50, 90 and final bid stages, and a bid-ready package. The consultant also supports bidding and construction through submittal and RFI reviews. Proposals must follow a tabbed format with a cover letter, project understanding, work plan and schedule, staff qualifications with references, resumes, and an acknowledgement of the City's consultant agreement and insurance requirements. The technical proposal is capped at ten pages. Interested firms should note the questions deadline and the proposal submission deadline in the project schedule.
Score at publication
Every RFP starts at 50. Each factor adds or subtracts points compared with a typical RFP; unknown data counts as neutral.
Frozen at publication: closed RFPs are not re-scored.
Starts at 50
No value published, and there isn't enough award history to estimate one. Scored as neutral.
The notice doesn't state eligibility restrictions. Scored as neutral.
0 other RFPs from City of Orinda and 85 Engineering & Architecture RFPs in California on RFP Detector in the past 12 months.
Solicitation, bids due: 28 days to respond (due Nov 19, 2026, 4:00 PM PST).
0 documents, named contact with email and phone, 2,855-word description.
Posted today.
50 + contributions = 65 (B, Strong)
Informational, not advice to bid or not bid. Score version 1.0.0, evaluated Oct 22, 2026.
See the notice
We don’t reproduce this notice. Our summary and the extracted facts are above; the full text is on the official solicitation.
Sign in free to open the official solicitationDocuments are published with the official solicitation.
Ha Nguyen
PrimaryAs printed on the official solicitation.
Request for Proposals posted
Questions due
First seen by RFP Detector
Responses were due
Issuer & category on RFP Detector
Counts from RFP Detector’s own records. Federal award history doesn’t apply to this issuer.
Public notice, first seen Nov 17, 2026. Details extracted and summarised by RFP Detector; confirm them on the official solicitation.
Official solicitation:Sign in free to open the official solicitation
RFP Detector is an independent service and is not affiliated with any government agency. Scores are informational.
RFP Detector is not affiliated with the organization that issued this RFP. Always rely on the official notice and confirm every date and requirement with the issuer.