Indefinite Delivery Indefinite Quantity Contract for Inland and Coastal Vessels Engineering Services, Naval Architecture, and Marine Engineering
Department of the Army
Why this score
Small-business set-aside, active buyer ($19.9B FY24–FY26).
Solicitation # 36C24526R0101Updated Nov 18, 2026Scored Nov 21, 2026
Closes in 3 days, Nov 25, 2026, 2:00 PM EST
Amended Nov 19, 2026: Due date moved from Nov 20, 2026, 2:00 PM EST to Nov 25, 2026, 2:00 PM EST
Nov 25
Nov 25, 2026, 2:00 PM EST
Summary by RFP Detector
Department of Veterans Affairs (245-NETWORK CONTRACT OFFICE 5 (36C245)) posted a sources sought notice titled “Renovate Specialty Clinics on 2nd” under solicitation number 36C24526R0101. It was first posted on Sep 24, 2026 and has been updated 3 times since. Responses are due Nov 25, 2026, 2:00 PM EST. It is classified under NAICS 541310 (Architectural Services) and product/service code C1DA. The set-aside is listed as Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14). The place of performance is Beckley, West Virginia. The listed point of contact is Millard Adkins, Contracting Officer.
RFP Detector Score
Every RFP starts at 50. Each factor adds or subtracts points compared with a typical RFP; unknown data counts as neutral.
Starts at 50
No value published. Typical award is about $317K: the median of 365 VA contracts over $25K awarded in NAICS 541310, FY24–FY26.
Service-disabled veteran-owned small business set-aside. The largest recipient took 10% of these dollars in FY24–FY26, and spending is spread across many vendors.
VA obligated $288M on NAICS 541310 across 378 contracts in FY24–FY26. 52 other notices from this office in the past 12 months.
Sources sought (market research, not a bid): 4 days to respond (due Nov 25, 2026, 2:00 PM EST). Tight.
Documents not listed, named contact with email and phone, 1,921-word description.
Updated 2 days ago (deadline moved).
50 + contributions = 72 (B, Strong)
Informational, not advice to bid or not bid. Score version 1.0.0, evaluated Nov 21, 2026.
Eligibility · Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
Service-disabled veteran-owned small business (SDVOSB) set-asides are reserved for small businesses owned and controlled by service-disabled veterans.
Not stated in a form we could extract. See the official solicitation for requirements, evaluation criteria and submission steps.
From the official notice
Please be advised that the submission deadline for SF 330 has been extended from November 20, 2026, to November 25, 2026, at 2:00 PM EST. See responses to RFI s below. VA responses to RFI s are bold below. Could you please clarify which disciplines are anticipated to be required? For example, regarding surveying, would the scope include a building measured survey, utility survey, site topographic survey, or a combination of these? Disciplines expected to be required: Architecture; Structural; Civil; Mechanical (HVAC); Plumbing; Electrical; Fire Protection; Industrial Hygiene; Interior Design; Surveying; Cost Estimating; Certified Physical Security Specialist; and other A/E services as defined by FAR 36.6 as necessary. Must a licensed surveyor be included as a named member of the SF330 team, or may surveying services be provided by a consultant on an as-needed basis? Identify the proposed discipline leads and specialty consultants required by the scope, including architecture, interior design, mechanical, electrical, plumbing/fire protection, and other disciplines as applicable. Describe the firm s and proposed team s experience with project specific technical features (e.g., MEP renovation, electrical distribution, emergency power, HVAC modifications, clinical space systems, fire protection/life safety systems, low voltage/IT coordination, medical gas systems, infection control/occupied facility coordination). Relevant VA experience and comparable non VA healthcare experience will be considered. Given that the primary scope involves renovating the existing second-floor clinic area, is new field surveying anticipated for this project? Building measurement and verification of existing utilities are expressly supported by the SOW. It requires a thorough as-built investigation and independent field verification of dimensions, wall layouts, utilities, material types, and other design conditions. The notice does not expressly require a boundary survey, campus-wide utility survey, or site topographic survey. It also does not define survey limits, accuracy, deliverables, or whether licensed land-surveying services are intended. Therefore: Existing-building measured documentation: required. Verification of utilities affecting the design: required. Please confirm if there is a page limit in addition to the 10MB PDF file size for the SF330 submission. 10MB PDF file size no page limit. For Factor II Specialized Experience and Technical Competence, the solicitation states that "recent experience means projects completed, substantially completed, or actively performed within five years before the response due date." Can the VA clarify whether this requirement is based on completion of the A/E design services? For this factor, recent experience means projects completed, substantially completed, or actively performed within five years before the response due date. Do the requirements outlined under Factor 3 Past Performance pertain to our Section F project examples? Section F project description will not necessarily satisfy Factor III by itself. Add the required performance information and cross-reference the project numbers rather than merely repeating scope descriptions. Are CPARS / PPQs required to be included with our submission? The supplied notice does not require CPARS attachments, completed PPQs nor does it exclude submission. As the Solicitation expects the A/E to collaborate with other A/E firms involved in other projects throughout the facility, can the VA provide the names of the actual other A/E firms and the other projects? No. Is a space program or a list of the specific specialty clinics to be consolidated on the 2nd Floor available and can it be provided at this time? No, not at this time. The anticipated disciplines include Surveying. Given that the project is primarily an interior renovation within Building 1, can the VA clarify the anticipated scope of surveying services required for this project? Building measurement and verification of existing utilities are expressly supported by the SOW. It requires a thorough as-built investigation and independent field verification of dimensions, wall layouts, utilities, material types, and other design conditions. The notice does not expressly require a boundary survey, campus-wide utility survey, or site topographic survey. It also does not define survey limits, accuracy, deliverables, or whether licensed land-surveying services are intended. Therefore: Existing-building measured documentation: required. Verification of utilities affecting the design: required. Can the VA clarify whether replacement of the air handling unit(s) serving the renovated 2nd Floor area is anticipated as part of this project, or whether the design should evaluate and determine HVAC system modifications necessary to support the renovated space? The SOW anticipates significant system upgrades, utility verification, and HVAC design, but it does not identify units to replace or establish replacement as a mandatory solution. The supported interpretation is that the A/E must evaluate existing systems and develop modifications or replacement recommendations needed for the approved renovation. VA architectural guidance likewise calls for investigating whether existing systems have sufficient capacity for renovations. That guidance does not establish that these particular AHUs require replacement Will the 2nd Floor space be vacated during construction or will phased construction be required? Full vacancy is not promised. The SOW expressly requires construction phasing, infection-control planning, outage and temporary-access planning, and a temporary relocation plan if needed. Firms should demonstrate occupied-facility and phasing capability; the actual decanting and construction sequence remain to be determined with VA. The SOW states that "an all-inclusive concept will need to be created" for the approximately 16,530 SF renovation area. Can the VA clarify whether the interior design concept is intended to encompass only the renovated specialty clinic space or also adjacent public and circulation areas on the 2nd Floor? The all-inclusive interior design concept applies to the approximately 16,530-square-foot specialty clinic renovation area identified in the SOW. The A/E shall coordinate the renovated area with directly adjacent public and circulation areas as necessary to provide appropriate transitions and maintain operational continuity. Design of other portions of the second floor is not included unless specifically identified or authorized by the VA. Deadline time zone: Please confirm that 2:00 p.m. Eastern Standard Time for the October 14, 2026 question deadline and October 26, 2026 submission deadline means 2:00 p.m. prevailing Eastern Time on those dates. 2:00 pm EASTERN TIME, NEW YORK, USA Page and formatting limits: Please confirm that there is no page limit, minimum font size, or separate length limit for supplemental qualification statements, provided the complete submission is a single PDF no larger than 10 MB. Submit SF 330 Parts I and II by email to millard.adkins@va.gov as a single Adobe PDF file (no larger than 10 MB). No ZIP files. Receipt must be confirmed. No page limit or minimum font size. Past-performance documentation: Should firms attach Contractor Performance Assessment Reporting System (CPARS) reports or Past Performance Questionnaires (PPQs), or should Factor III be addressed through narrative only unless supporting records are requested? The supplied notice does not require CPARS attachments, completed PPQs nor does it exclude submission. Project examples: May the up to five projects discussed under Factor III be the same projects presented in SF330 Section F? May Section F include more than five projects if the Factor III discussion is limited to five? Yes. The projects discussed under Factor III may be the same projects presented in SF330 Section F. However, the Factor III response must provide the specific past-performance information requested by that factor, including the firm s performance regarding quality, cost control, schedule compliance, coordination, project outcome, and the roles of proposed key personnel, as applicable. Firms may cross-reference the corresponding Section F project number rather than repeat the full project description. The Factor III discussion is limited to no more than five projects. Additional projects may be included in Section F to the extent permitted by the SF330 requirements and the submission size limitation, but only the five projects identified for Factor III will be evaluated under the specific Factor III project-example requirements. Section E resumes: Which disciplines does the Government expect firms to treat as key discipline leads requiring Section E resumes? Please clarify whether resumes are required for every discipline listed under A/E Eligibility and Disciplines, or only the proposed key leads applicable to this project. The notice expressly asks for the PM and proposed key discipline leads, with architecture, interior design, mechanical, electrical, and plumbing/fire protection identified in Factor II. It does not expressly demand a separate resume for every discipline on the broad eligibility list. Include the PM and each proposed key lead, including specialty consultants who meet that definition including but not limited to cost estimator an Quality Manager. Receipt confirmation: The solicitation states that receipt must be confirmed. What form of confirmation is acceptable? If acknowledgment is not received before the submission deadline, whom should the firm contact, and through what method? Receipt will be confirmed by the contracting officer by email once received. The POC is Millard Adkins and can be contacted by email to Millard.Adkins@va.gov Project completion status: For projects presented in Section F and discussed under Factor III, must design be complete, construction be complete, or both? Factor II allows projects completed, substantially completed, or actively performed within the preceding five years; please clarify whether that same eligibility standard applies to Section F and Factor III. For Factor II, a project may be completed, substantially completed, or actively being performed, provided the qualifying work occurred within five years before the response due date. Neither design nor construction must necessarily be fully complete for a project to qualify under Factor II. For Factor III, firms should submit up to five recent and relevant projects that provide sufficient performance information for the Government to evaluate quality, cost control, schedule compliance, coordination, and project outcome. If a project is ongoing, the firm should clearly identify the work completed to date and the performance information available for evaluation. Regarding the subject solicitation, can you please confirm if this effort will require commissioning and life safety and if those roles are required to be third-party? Life safety is expressly required. The SOW requires final drawings addressing life safety and infection control, includes fire-protection drawings, and calls for relevant life-safety expertise in evaluation. It does not establish a separate third-party life-safety consultant requirement. Commissioning is not expressly assigned as a distinct service in the supplied SOW. Nevertheless, the cited requirement to comply with VA design criteria is significant: VA HVAC guidance requires commissioning practices tailored to project size and complexity and compliance with VA s commissioning manual. Civil Engineering and Surveying disciplines: The solicitation's required disciplines list includes Civil Engineering and Surveying, but neither discipline is addressed anywhere in the body of the SOW. Disciplines expected to be required: Architecture; Structural; Civil; Mechanical (HVAC); Plumbing; Electrical; Fire Protection; Industrial Hygiene; Interior Design; Surveying; Cost Estimating; Certified Physical Security Specialist; and other A/E services as defined by FAR 36.6 as necessary. Can you confirm whether Civil Engineering and Surveying services are in fact required for this project? They remain listed as anticipated disciplines Can you provide the anticipated scope of responsibilities for these two disciplines, since the current SOW does not describe any site, civil, or survey work for this second story interior renovation? No significant civil engineering or land surveying effort is currently anticipated for the second-floor renovation itself. However, firms should include civil engineering and surveying capabilities sufficient to support any site-related work that may become necessary as a result of construction phasing, utility modifications, temporary facilities, or continuity-of-operations requirements identified during design development. The VA has not predetermined the temporary relocation strategy. We wanted to clarify, for our SF330 submission if we needed to utilize the GSA SF330 form? Can we utilize a modified form to showcase photographs to reinforce our narrative about project examples provided in Part F. Preserve the SF330 sections, information, project identifiers, and signature certifications. GSA also provides a separate reproducible Section F. use only concise project-relevant images if space permits.
No documents are listed for this notice.
Millard Adkins
PrimaryContracting Officer
Points of contact as published on the notice.
1 change since posting.
Sources Sought posted
Sources Sought posted
Sources Sought posted
Sources Sought posted
Due date moved from Nov 20, 2026, 2:00 PM EST to Nov 25, 2026, 2:00 PM EST
Responses dueNext · in 3 days
Archive date on the official notice
Federal award history
Department of Veterans Affairs · NAICS 541310 · FY24–FY26
Recipients of past awards in this market, not the incumbent of this RFP.
| Fiscal year | Obligated ($) |
|---|---|
| FY2022 | 121,431,322.71 |
| FY2023 | 196,325,489.34 |
| FY2024 | 162,867,524.38 |
| FY2025 | 82,960,293.91 |
| FY2026 | 42,034,003.65 |
Federal contract award records, award types A–D, FY24–FY26. Updated Nov 13, 2026.
Same NAICS group or Engineering & Architecture, nearby first, ranked by score.
Department of the Army
Why this score
Small-business set-aside, active buyer ($19.9B FY24–FY26).
Department of the Navy
Why this score
Active buyer ($68B FY24–FY26), 27 days to respond.
Department of the Navy · Maryland
Why this score
Active buyer ($68B FY24–FY26), 24 days to respond.
Department of the Navy
Why this score
Active buyer ($68B FY24–FY26), 30 days to respond.
Department of the Navy · Panama City Beach, FL
Why this score
Active buyer ($68B FY24–FY26), 20 days to respond.
Department of the Army · New Orleans, LA
Why this score
Active buyer ($19.9B FY24–FY26), partial small-business set-aside.
RFP Detector Scores are informational.How we score →
466 open RFPs from this issuer and its offices.
Department of Veterans Affairs · Iowa City, IA
Why this score
Active buyer ($978M FY24–FY26), new this week; but only 1 day left.
Department of Veterans Affairs
Why this score
Active buyer ($634M FY24–FY26), full and open; but only 2 days left.
Department of Veterans Affairs
Why this score
New this week, active buyer ($736M FY24–FY26); but only 2 days left.
Department of Veterans Affairs
Why this score
Active buyer ($634M FY24–FY26), new this week; but only 2 days left.
Department of Veterans Affairs · Fayetteville, NC
Why this score
SDVOSB set-aside, new this week; but only 2 days left.
Department of Veterans Affairs · Indianapolis, IN
Why this score
Full and open; but only 2 days left.
RFP Detector Scores are informational.How we score →
Official federal notice. Updated Nov 18, 2026.
Official solicitation:Sign in free to open the official solicitation
RFP Detector is an independent service and is not affiliated with any government agency. Scores are informational.
RFP Detector is not affiliated with the organization that issued this RFP. Always rely on the official notice and confirm every date and requirement with the issuer.