Skip to content
FederalRFIOpen Federal notice

Request for Information/Market Intelligence Notice: Repair Electrical Distribution System Switchgear Stations & Addition of Redundancy Cable Use of Progressive Design Build (PDB) with Other Transaction Authority (OTA)

Department of the Air Force› FA7060 11TH CONTRACTING SQ PK Bolling AFB, DC

Solicitation # FA706027R0001Updated Oct 23, 2026Scored Nov 21, 2026

Responses due

Nov 30

Nov 30, 2026, 10:00 AM EST

Posted Oct 23Due Nov 30

Summary by RFP Detector

What this RFP is about

Department of the Air Force (FA7060 11TH CONTRACTING SQ PK), part of the Department of Defense, posted a request for information titled “Request for Information/Market Intelligence Notice: Repair Electrical Distribution System Switchgear Stations & Addition of Redundancy Cable Use of Progressive Design Build (PDB) with Other Transaction Authority (OTA)” under solicitation number FA706027R0001. It was posted on Oct 23, 2026. Responses are due Nov 30, 2026, 10:00 AM EST. It is classified under NAICS 238210 (Electrical Contractors and Other Wiring Installation Contractors) and product/service code Z2JZ. No set-aside is listed. The place of performance is Bolling AFB, District of Columbia. The listed point of contact is Terry Agena.

Key facts

Sector
Federal
Notice type
RFI
As posted: Sources Sought
PSC
Z2JZ
Place of performance
Bolling AFB, DC
ZIP 20032
Value
Not statedTypical award in this market ≈ $104.1K
Solicitation #
FA706027R0001
Listing
Official federal notice

RFP Detector Score

Score breakdown

Every RFP starts at 50. Each factor adds or subtracts points compared with a typical RFP; unknown data counts as neutral.

Starts at 50

  • Value−7.5estimated

    No value published. Typical award is about $104K: the median of 451 Air Force contracts over $25K awarded in NAICS 238210, FY24–FY26.

  • Competition & access+1.5measured

    Full and open competition. The largest recipient took 18% of these dollars in FY24–FY26.

  • Issuer & market−0.5measured

    Air Force obligated $214M on NAICS 238210 across 665 contracts in FY24–FY26. 4 other notices from this office in the past 12 months.

  • Time & stage+4.4measured

    Sources sought (market research, not a bid): 9 days to respond (due Nov 30, 2026, 10:00 AM EST).

  • Clarity & completeness+6.1estimated

    Documents not listed, 2 named contacts with email and phone, 1,053-word description.

  • Freshness−4.1measured

    Posted 28 days ago.

50 + contributions = 50 (C, Fair)

Score trend, last 30 daysScore history: 56, 52, 51, 50

Informational, not advice to bid or not bid. Score version 1.0.0, evaluated Nov 21, 2026.

Requirements & submission

Eligibility · Full and open competition

Full and open competition means the notice states no set-aside: any responsible business can respond, subject to the requirements in the notice.

Not stated in a form we could extract. See the official solicitation for requirements, evaluation criteria and submission steps.

From the official notice

Description

1,053 words

REQUEST FOR INFORMATION (RFI) / MARKET RESEARCH NOTICE: This is a request for information (RFI) for market intelligence and for informational purposes only. This announcement does not constitute a solicitation or a request for proposal (RFP), and no solicitation is currently available. Participation in this RFI is strictly voluntary. The Government will not be obligated to award any agreement or contract because of this RFI, nor will it reimburse respondents for any costs associated with the preparation or submission of information. Submitting a response will not affect a firm’s ability to submit a proposal should formal solicitation be issued in the future. NAICS CODE: 238210 Electrical Contractors and Other Wiring Installation Contractors SMALL BUSINESS STANDARD: $19,000,000.00 NOTE: While Other Transaction Authority is not subject to FAR based small business regulations, this NAICS code is provided for market research to help the Government understand the size and demographics of the interested industrial base. PROGRAM/PROJECT OVERVIEW: The 11th Contracting Squadron (11 CONS), District of Washington, has a requirement to execute the design-build upgrades, repairs, and/or replacements to the deteriorated Electrical Switching Stations located at B18 and B168 on Joint Base Anacostia Bolling (JBAB) that includes developing a solution to establish a connection by high voltage electrical redundancy cable. The Government is evaluating the feasibility of executing these requirements via Progressive Design-Build (PDB) utilizing an Other Transaction (OT) Agreement under the statutory authority of 10 U.S.C. § 2808a. This project summary establishes the operational requirements, technical baseline, and acquisition framework for the Progressive Design-Build (PDB) Other Transaction Authority (OTA) effort to modernize Joint Base Anacostia-Bolling’s (JBAB) primary electrical infrastructure. Project Title JBAB Electrical Switching Stations (ESS B18 & B168) Modernization & Grid Redundancy Location Joint Base Anacostia-Bolling (JBAB), 11th Wing Acquisition Strategy Progressive Design-Build (PDB) via Other Transaction Authority (OTA) Primary Objective Engineer comprehensive design packages to repair, upgrade, and interconnect deteriorated electrical switching infrastructure Primary Deliverables 100% executable design packages, specifications, and implementation schedules for ESS upgrades, facility hardening, cable routing, and smart-grid wireless SCADA/telemetry Scope Breakdown by Facility & Component ESS B18 (Switching Station Upgrade) • Full replacement of legacy switchgear with FR3 fluid, air-insulated switchgear (per latest UFC 3-550-01) • Life-cycle cost and sustainability integration (UFC 1-200-02) • Thermal partition separating switchgear room from power generation bay • Dedicated HVAC system and air conditioning ductwork • Sized space heating units • High-efficiency interior LED lighting ESS B168 (Repair, Upgrade & Hardening) • Complete switchgear replacement mirroring ESS B168b using FR3 air-insulated switchgear (UFC 3-550-01) • Sustainable design practices (UFC 1-200-02) • Dedicated single HVAC unit and duct system • Interior/exterior high-efficiency LED flood/task lighting • Raised roof profile with comprehensive crack sealing/insulation • Foundation pillar repairs, crawl space waterproofing, and rainwater gutter system • Motorized roll-up door, cyber/physical cypher-locked access doors, and motorized loading dock ramp with widened sidewalk High-Voltage Redundancy Cables • Design 4-circuit bidirectional interconnect (8 cables total) connecting ESS B18 and ESS B168 • Baseline routing derived from 2025 Engineering Study • Mandatory underground routing preference across base footprint • Aerial routing permitted strictly as secondary exception where subsurface obstructions prevent underground installation Wireless SCADA & Grid Telemetry • Air Force long-term smart-grid wireless connectivity architecture • Cell-enabled control panels reporting directly to electric shop web interface without physical comm trunk lines • Relay-to-control panel comm wiring for ESS B18 and ESS B168 • Additional telemetry control panel integrated into ESS B4505 (sub-station to B18) to monitor sub-station power load profiles Key Technical Standards & Compliance Baseline UFC 3-550-01 Exterior Electrical Power Distribution Mandates modern FR3 biodegradable, fire-resistant fluid dielectric air-insulated switchgears, significantly mitigating environmental and thermal hazards. UFC 1-200-02 High Performance and Sustainable Building Requirements Governs energy efficiency, life-cycle cost effectiveness, indoor environmental quality, and durable materials integration. PDB / OTA Authority Prototype / Collaboration Framework Fosters early contractor involvement during Phase 1 design, mitigating unforeseen site and subsurface risk prior to Phase 2 construction commitment. INFORMATION REQUESTED: Interested industry partners are requested to respond to the following questions to help shape the final acquisition strategy: Company Profile: Q1. Business Name Q2. Address Q3. Point of Contract (Name, Title) Q4. Phone Number Q5. Email Address Q6. Unique Entity ID Q7. Cage Code Q8. Socioeconomic Status (Other Than Small, Small, 8(a), SDVOSB, etc.) Q9. Participating Role (Prime Contractor, Subcontractor, Design Firm, Other) Other Transaction Authority (OTA) & Statutory Compliance: Q10. OTA Experience – Describe your firm’s previous experience, if any, executing projects utilizing OTA. Q11. What project characteristics make PDB OTA particularly advantageous or disadvantageous for this requirement? Progressive Design-Build (PDB) / Early Contractor Involvement: Q12. What minimum level of detail (e.g., Statement of Need, conceptual site plans, target budget) does your firm require prior to entering Phase 1 (Design/Pre-construction) to feel confident in the project's viability? Q13. What collaborative mechanisms (such as joint design charrettes, target-value design workshops, or phased scoping approvals) do you recommend the Government implement in the first 30-90 days to rapidly transition from a "blank page" to a mutually agreed-upon baseline? Q14. Describe your experience executing Progressive Design-Build, Construction Manager at Risk (CMAR), or other highly collaborative delivery methods where designer and builder worked collaboratively with the owner before locking in a Guaranteed Maximum Price (GMP). Feedback on the Acquisition Strategy & Alternatives: Q15. Does the proposed PDB-OTA strategy incentivize your firm to participate? Why or why not? Q16. Are there alternative acquisition strategies, commercial phasing arrangements, or risk-sharing terms that the Government has not considered that would yield a higher quality facility, faster delivery, or lower cost? Bonding Capability: Q17. Specify your maximum bonding (single and aggregate) as a sole prime contractor and/or as a joint venture. SUBMISSION INSTRUCTIONS: Please submit your responses by 30 November 2026 at 1000 Eastern Standard Time (EST) to Mr. Terry Agena at terry.agena.1@us.af.mil and MSgt Quortez Dorsey quortez.dorsey@us.af.mil. The Government welcomes candid industry feedback and recommendations regarding commercial practices, agreement terms, project phasing, risk sharing, governance, pricing approaches, and other considerations that could improve successful execution of these projects under 10 U.S.C. § 2808a. Interested firms are encouraged to add themselves to the Interested Vendors List associated with this announcement on (see the official solicitation) to receive future updates. Note: Do not submit proprietary trade secrets, protected technologies, or classified information in your response. All feedback received will be handled as public market research to shape the Government's final acquisition approach.

Documents

No documents are listed for this notice.

Contacts

2 contacts

Points of contact as published on the notice.

Timeline & history

  1. Sources Sought posted

  2. Responses dueNext · in 8 days

  3. Archive date on the official notice

Federal award history

Market context

Department of the Air Force · NAICS 238210 · FY24–FY26

Typical award (over $25K)
$104.1K
Contracts awarded
665
Total obligated
$213.7M
Award size, Department of the Air Force · NAICS 238210 contracts, FY24–FY26 (log scale)
P25 $18.0KMedian $49.9KP75 $182.2KP90 $686.4K

Largest recipients in this market

  • MIWOK CONSTRUCTION LLC$38.3M18%
  • MODERN INTERNATIONAL INC$32.2M15%
  • GARY KUBIAK AND SON ELECTRIC, INC.$9.1M4%

Recipients of past awards in this market, not the incumbent of this RFP.

View as table
Fiscal yearObligated ($)
FY202273,917,241.85
FY202394,520,358.86
FY202490,114,099.62
FY202595,659,992.95
FY202627,890,868.89

Federal contract award records, award types A–D, FY24–FY26. Updated Nov 13, 2026.

Similar open RFPs

Same NAICS group or Construction & Renovation, nearby first, ranked by score.

Strong

Enterprise Workspace Management Support

Department of the Navy · Washington Navy Yard, DC

FederalSources soughtEngineering & Architecture
Posted Nov 10Due Dec 18, 2026, 2:00 PM EST (in 26 days)Federal notice
Strong

USDA Design/Build Perimeter Security Enhancement Parking Lot 9

USDA, Departmental Administration · Washington, DC

FederalCombined synopsisConstruction & Renovation
Posted Nov 19Due Jan 6, 2027, 2:00 PM EST (in 45 days)Federal notice
Strong

NMAH: 2027 Install Emergency Generator

Smithsonian Institution · District of Columbia

FederalPresolicitationConstruction & Renovation
Posted Nov 12Due Feb 10, 2027, 3:00 PM EST (in 80 days)Federal notice
Fair

Cooling Tower, Roofing, and Structural Construction

Bureau of Engraving and Printing · District of Columbia

FederalRFPSmall business set-asideConstruction & Renovation+1
Posted Sep 16Due Dec 11, 2026, 12:00 PM CST (in 19 days)Federal notice
Fair

DOJ Phase II Renovation

Offices, Boards and Divisions · Washington, DC

FederalSpecial noticeConstruction & Renovation
Posted Nov 17Due Dec 11, 2026, 5:00 PM EST (in 19 days)Federal notice

RFP Detector Scores are informational.How we score →

More from Department of the Air Force

764 open RFPs from this issuer and its offices.

Poor

FD2020

Department of the Air Force

FederalSpecial notice
Posted Nov 22Due Nov 21, 2026 (in 2 h)Federal notice
Poor

FD2020

Department of the Air Force

FederalSpecial notice
Posted Nov 22Due Nov 21, 2026 (in 2 h)Federal notice
Poor

FD2020

Department of the Air Force

FederalSpecial notice
Posted Nov 22Due Nov 21, 2026 (in 2 h)Federal notice
Poor

FD2020

Department of the Air Force

FederalSpecial notice
Posted Nov 22Due Nov 21, 2026 (in 2 h)Federal notice
Poor

FD2020

Department of the Air Force

FederalSpecial notice
Posted Nov 22Due Nov 21, 2026 (in 2 h)Federal notice
Poor

FD2020

Department of the Air Force

FederalSpecial noticeSupplies, Equipment & Furniture
Posted Nov 22Due Nov 22, 2026 (in 26 h)Federal notice

RFP Detector Scores are informational.How we score →

About this notice

Official federal notice. Updated Oct 23, 2026.

Official solicitation:Sign in free to open the official solicitation

RFP Detector is an independent service and is not affiliated with any government agency. Scores are informational.

RFP Detector is not affiliated with the organization that issued this RFP. Always rely on the official notice and confirm every date and requirement with the issuer.