USS HIGGINS (DDG 76) SRA 6C1, Bundle #1
Department of the Navy · Yokosuka
Why this score
Active buyer ($83.6B FY24–FY26), 28 days to respond; but small typical award (~$206K).
Solicitation # N00024-27-R-4444Updated Nov 17, 2026Scored Nov 18, 2026
Dec 15
Dec 15, 2026, 12:00 PM EST
Summary by RFP Detector
Department of the Navy (NAVSEA HQ), part of the Department of Defense, posted a request for information titled “REQUEST FOR INFORMATION (RFI) DDG 1000 Class Modernization: USS Michael Monsoor (DDG 1001) Conventional Prompt Strike (CPS) Depot Modernization Period (DMP); Large Missile Vertical Launch System (LMVLS) Heavy Lift and Industrial Installation” under solicitation number N00024-27-R-4444. It was posted on Nov 17, 2026. Responses are due Dec 15, 2026, 12:00 PM EST. It is classified under NAICS 336611 (Ship Building and Repairing) and product/service code J999. No set-aside is listed. The listed point of contact is James Thomas.
RFP Detector Score
Every RFP starts at 50. Each factor adds or subtracts points compared with a typical RFP; unknown data counts as neutral.
Starts at 50
No value published. Typical award is about $206K: the median of 5,875 Navy contracts over $25K awarded in NAICS 336611, FY24–FY26.
Full and open competition. The largest recipient took 29% of these dollars in FY24–FY26.
Navy obligated $83.6B on NAICS 336611 across 8,225 contracts in FY24–FY26. 57 other notices from this office in the past 12 months.
Special notice: 27 days to respond (due Dec 15, 2026, 12:00 PM EST).
Documents not listed, 2 named contacts with email and phone, 1,099-word description.
Posted today.
50 + contributions = 70 (B, Strong)
Informational, not advice to bid or not bid. Score version 1.0.0, evaluated Nov 18, 2026.
Eligibility · Full and open competition
Full and open competition means the notice states no set-aside: any responsible business can respond, subject to the requirements in the notice.
Not stated in a form we could extract. See the official solicitation for requirements, evaluation criteria and submission steps.
From the official notice
1.0 PURPOSE & OBJECTIVE PAE Maritime, on behalf of the dPAE Combatants/ DDG 1000 Class Program Office (PMS 500), is conducting market research to assess industry capabilities, engineering rigor, and shipyard infrastructure necessary to accomplish the industrial integration and installation of the Large Missile Vertical Launch System (LMVLS) aboard the USS Michael Monsoor (DDG 1001). The primary objective of this RFI is to evaluate prospective offerors' specific technical expertise, dry dock/pier-side heavy-lift capabilities, dimensional control methodologies, and integrated production scheduling to execute the installation of a pre-manufactured ~600-ton LMVLS module and associated Conventional Prompt Strike (CPS) warfare alterations. The questions contained in Section 3.0 are specifically structured to allow industry respondents to demonstrate their understanding of the unique structural, spatial, lifting, and combat systems complexities associated with this depot modernization period. 2.0 TECHNICAL BASELINE & REQUIREMENT SUMMARY Key technical parameters within the DDG 1001 CPS DMP include: 2.1 Ship Particulars Vessel: USS Michael Monsoor (DDG 1001) Length Overall (LOA) / LBP: 186 m (610 ft) / 182.9 m (600 ft) Beam (Maximum): 24.6 m (80.7 ft) Draft (Navigational / DWL): 8.4 m (27.6 ft) / 7.0 m (23.0 ft) Hull Form & Superstructure: Wave-piercing tumblehome hull; steel hull structure with composite deckhouse; integrated power system (IPS). 2.2 LMVLS Pre-Manufactured Assembly Profile (GFM) The Government plans to deliver the LMVLS as Government-Furnished Material (GFM) as a fully out-fitted, pre-manufactured modular block. The industrial effort will require rigging, lifting, transferring, lowering, and setting the ~600-ton LMVLS module into the hull pocket within tight spatial and angular tolerances. Additional specifications include: Envelope Dimensions: Approximately 44’ 7” Length × 20’ 8” Width × 41’ 1” Height. Total Lift Weight: Approximately 600 Long Tons (LT). Component Integration: Four (4) launch tubes housing Advanced Payload Modules (APMs) and All-Up Round Canisters (AUR-C), integral shock-isolation foundation assemblies, multi-level bulkheads (down through L5), decks, pre-installed outfitting, and weather deck / 01-level hatch structures. Installation Location: Forward Stack 1400 (reclaimed forward space following MT 61 AGS complete removal). 3.0 TECHNICAL CAPABILITY QUESTIONNAIRE Interested sources are requested to provide detailed technical narrative responses, supported by engineering calculations, facility specifications, past performance references, and risk mitigation methodologies, addressing each section below. Section A: Heavy Lift, Rigging & Facility Engineering Capabilities Lifting Infrastructure & Capacities: Detail your primary crane assets (gantry, floating, portal, or crawler) capable of hoisting and swinging a 600-ton (approx. 1,344,000 lbs) rigid modular assembly. Provide the specific crane load charts demonstrating rated capacity at the required operating radius and minimum hook height necessary to clear DDG 1001’s deck edge, bulwarks, and adjacent deckhouse structures (taking into account the 41’ 1” module height plus lifting beam/spreader bar rigging height). If utilizing a floating crane for the LMVLS, confirm that the selected crane has the clearance to transit under any bridges necessary to arrive at your shipyard. Specify whether the 600-ton lift will be executed in dry dock or pier-side, and detail the structural load-bearing capacity (pounds per square foot / ground bearing pressure) of the quay wall, pier apron, or dry dock wing walls supporting the crane footprint during maximum outrigger or track loadings. Rigging, Stability & Tandem Operations: Describe your concept for the lift rigging assembly (spreader frames, equalizing grommets, dynamic load monitoring systems) to eliminate torsional deflection, racking, and localized stress concentrations on the pre-assembled LMVLS module during the pick. If a tandem or multi-crane lift is planned, provide your operational methodology for synchronous motion, hook travel rate synchronization, and emergency load re-distribution mitigation. Address environmental limits: What are your maximum allowable wind speed, wave/surge motion (if using floating derrick/crane barges), and tidal envelopes for executing this precision lift? Ship Mooring, Ballast & Hull Stability During Module Placement: DDG 1001 possesses a unique wave-piercing tumblehome form with strict naval architectural stability limitations. Describe your approach to calculate, model, and monitor ship list, trim, draft changes, and metacentric height during the removal of the forward AGS weight and subsequent setting of the 600-ton LMVLS module (whether afloat at a pier or during block contact in dry dock). Section B: Precision Alignment, Metrology & Structural Integration Dimensional Control & Metrology Framework: The LMVLS module must interface with existing ship structure, pre-established shock-attenuation foundations, and tight topside radar cross-section (RCS) deck tolerances. Describe your advanced metrology procedures (e.g., 3D laser scanning, photogrammetry, laser tracking) from initial ship condition surveying through pre-lift verification and final post-weld alignment. Section C: Industrial Coordination, Schedule Phasing & AIT Co-Existence Integration of Alteration Installation Teams (AIT) & System OEMs: Installation of the CPS LMVLS requires extensive concurrent work by Government labs and weapon system prime contractors (e.g., Raytheon, Lockheed Martin, NAVWAR). Detail your approach for managing space conflicts, shared lifting/crane services, security access controls for classified weapon compartments, and jurisdictional hand-offs between shipyard trades and specialized weapon installers. Subcontracting, Teaming & Industrial Workshare: If teaming or significant subcontracting (>20%) is required to satisfy heavy crane, precision metrology, or specialized welding capabilities, outline your proposed organizational hierarchy, prime contractor oversight model, and quality assurance audit procedures. If responding as a Small Business prime under FAR 52.219-14, explicitly demonstrate how your organization will perform at least 50% of the cost of manufacturing and direct industrial labor. Section D: Risk Assessment, Lessons Learned & Resource Management Critical Technical & Industrial Risks: Identify what your organization views as the top three (3) critical technical failure modes or schedule risks during the LMVLS module installation (e.g., crane unavailability, structural distortion exceeding cell launch tolerances, GFM delivery mismatches, dry dock schedule creep). For each identified risk, provide specific, mitigation strategies and fallback procedures. 4.0 RESPONSE INSTRUCTIONS & SUBMISSION GUIDELINES 4.1 Content & Page Limitations Cover Sheet: CAGE Code, SAM UEI, MSRA/ABR status, business size under NAICS 336611 (Ship Building and Repairing), primary technical and contracts POCs. Volume I (Technical Capability Narrative): Not to exceed five (5) pages, addressing all questions in Section 3.0. Volume II (Facilities, Equipment & Crane Load Charts): Not to exceed five (5) pages, containing facility schematics, dry dock certified dimensions, dock loading curves, and relevant crane radius/load capacity charts. 4.2 Marking of Proprietary Information Respondents must clearly mark and isolate any proprietary data, trade secrets, or commercial pricing/cost methodologies. The Government will handle properly marked data in accordance with applicable statutory regulations and protect it as Business Sensitive. 4.3 Inquiries & Submission Points of Contact Submissions shall be delivered electronically via DoD SAFE or secure email no later than the time and date specified in the official (see the official solicitation) synopsis: Procuring Contracting Officer: Brian Romano, PAE M 025 (brian.c.romano.civ@us.navy.mil) Contract Specialist: James Thomas, PAE M 025 (james.c.thomas118.civ@us.navy.mil) Reference: Sources Sought N00024-26-R-4443 (DDG 1001 CPS DMP LMVLS RFI)
No documents are listed for this notice.
James Thomas
PrimaryBrian Romano
Points of contact as published on the notice.
Special Notice posted
Responses dueNext · in 26 days
Archive date on the official notice
Federal award history
Department of the Navy · NAICS 336611 · FY24–FY26
Recipients of past awards in this market, not the incumbent of this RFP.
| Fiscal year | Obligated ($) |
|---|---|
| FY2022 | 20,800,088,033.98 |
| FY2023 | 24,879,859,588.85 |
| FY2024 | 22,534,707,122.77 |
| FY2025 | 35,624,639,796.41 |
| FY2026 | 25,424,280,404.57 |
Federal contract award records, award types A–D, FY24–FY26. Updated Nov 13, 2026.
Same NAICS group or Supplies, Equipment & Furniture, nearby first, ranked by score.
Department of the Navy · Yokosuka
Why this score
Active buyer ($83.6B FY24–FY26), 28 days to respond; but small typical award (~$206K).
Department of the Navy · Yokosuka
Why this score
Active buyer ($83.6B FY24–FY26), 29 days to respond; but small typical award (~$206K).
Department of the Navy
Why this score
Active buyer ($83.6B FY24–FY26), 33 days to respond; but small typical award (~$206K).
Department of the Navy
Why this score
Active buyer ($83.6B FY24–FY26), 13 days to respond; but small typical award (~$206K).
Department of the Navy · Yokosuka
Why this score
Active buyer ($83.6B FY24–FY26), 28 days to respond; but small typical award (~$206K).
US Coast Guard · North Charleston, SC
Why this score
22 days to respond, active buyer ($9.4B FY24–FY26); but small typical award (~$94K).
RFP Detector Scores are informational.How we score →
1352 open RFPs from this issuer and its offices.
Why this score
Active buyer ($83.6B FY24–FY26); but only less than a day left.
Department of the Navy · Washington, DC
Why this score
New this week, full and open; but only 1 day left.
Department of the Navy
Why this score
Active buyer ($83.6B FY24–FY26), posted today; but only 1 day left.
Department of the Navy · Annapolis, MD
Why this score
New this week, clear, complete notice; but only 1 day left.
Why this score
Typical award ~$5.4M, active buyer ($4.8B FY24–FY26); but only 1 day left.
Department of the Navy · Panama City Beach, FL
Why this score
Not openly competed. Notice signals a sole-source or brand-name intent. The largest recipient took 16% of these dollars in FY24–FY26.
RFP Detector Scores are informational.How we score →
Official federal notice. Updated Nov 17, 2026.
Official solicitation:Sign in free to open the official solicitation
RFP Detector is an independent service and is not affiliated with any government agency. Scores are informational.
RFP Detector is not affiliated with the organization that issued this RFP. Always rely on the official notice and confirm every date and requirement with the issuer.