Skip to content
FederalRFIOpen Federal notice

Request for Information (RFI)- Parallel Battery Relay

Department of the Air Force› FA8692 HELICOPTER PGM AFLCMC WIH Wright Patterson AFB, OH

Solicitation # MH139-CR11Updated Nov 12, 2026Scored Nov 18, 2026

Responses due

Dec 11

Dec 11, 2026, 5:00 PM EST

Posted Nov 10Due Dec 11

Summary by RFP Detector

What this RFP is about

Department of the Air Force (FA8692 HELICOPTER PGM AFLCMC WIH), part of the Department of Defense, posted a request for information titled “Request for Information (RFI)- Parallel Battery Relay” under solicitation number MH139-CR11. It was first posted on Nov 10, 2026 and has been updated once since. Responses are due Dec 11, 2026, 5:00 PM EST. No set-aside is listed. The place of performance is Wright Patterson AFB, Ohio. The listed point of contact is Chad Group.

Key facts

Sector
Federal
Notice type
RFI
As posted: Sources Sought
Category
Other
NAICS
Not stated
PSC
Not stated
Place of performance
Wright Patterson AFB, OH
ZIP 45433
Value
Not stated
Solicitation #
MH139-CR11
Listing
Official federal notice

RFP Detector Score

Score breakdown

Every RFP starts at 50. Each factor adds or subtracts points compared with a typical RFP; unknown data counts as neutral.

Starts at 50

  • Value0.0unknown

    No value published, and there isn't enough award history to estimate one. Scored as neutral.

  • Competition & access−0.6estimated

    Full and open competition.

  • Issuer & market0.0unknown

    No award history or issuer activity found yet. Scored as neutral.

  • Time & stage+5.4measured

    Sources sought (market research, not a bid): 24 days to respond (due Dec 11, 2026, 5:00 PM EST).

  • Clarity & completeness+3.4estimated

    Documents not listed, 2 named contacts with email, 1,140-word description.

  • Freshness+4.0measured

    Posted 7 days ago.

50 + contributions = 62 (C, Fair)

Score trend, last 30 daysScore history: 66, 65, 64, 63, 62

Informational, not advice to bid or not bid. Score version 1.0.0, evaluated Nov 18, 2026.

Requirements & submission

Eligibility · Full and open competition

Full and open competition means the notice states no set-aside: any responsible business can respond, subject to the requirements in the notice.

Not stated in a form we could extract. See the official solicitation for requirements, evaluation criteria and submission steps.

From the official notice

Description

1,140 words

1. NOTICE This Request for Information (RFI) is issued for informational and market research purposes only in accordance with Federal Acquisition Regulation (FAR) Part 10. It does not constitute a solicitation, a Request for Proposal (RFP), or a promise to issue an RFP in the future. The Government will not reimburse any company or individual for expenses associated with preparing or submitting information in response to this RFI. The information provided may be used by the U.S. Air Force in developing its acquisition strategy, Statement of Work (SOW), and performance specifications. Interested parties are responsible for adequately marking proprietary or competition-sensitive information. 2. BACKGROUND AND SCOPE The Air Force Life Cycle Management Center (AFLCMC), MH-139A Program Office (AFLCMC/WIH), is conducting market research to identify sources capable of providing Parallel Battery Relay modification for the MH-139A. The MH-139A missions routinely require off-station engine starts using only battery power. Flight data indicates that isolated battery starts in extreme cold weather degrade transient voltage, resulting in failed or hot engine starts. The objective of this effort is to modify the aircraft to parallel the main and auxiliary batteries during start sequences to prevent engine damage in austere environments. The Government considers Leonardo Service Bulletin SB 139-360 Rev C, Part II, (including Kit P/Ns 4G2430F00713) as the known baseline solution. Key requirements for the system include: System Functionality: Simultaneous utilization of main and auxiliary batteries during engine start sequences. Proposed solutions must either be the OEM kits or an equivalent FAA-approved modification that meets the exact same requirement. Airworthiness Support: The vendor must provide the necessary engineering data package to support a Federal Aviation Administration (FAA) Supplemental Type Certificate (STC) and a military Engineering Change Proposal (ECP). Critical Exclusion (Batteries): The USAF currently possesses compatible Nickle-Cadmium 44 Ah Main and 27 Ah Auxiliary batteries.[CA1] [BA2] [JC3] Modification pricing must strictly exclude the physical batteries and include only the installation hardware (relays, brackets, wiring, consumables). Support & Documentation: The vendor must provide the necessary technical data package (e.g., flight manual supplements, wiring diagrams, structural data, and software integration files) associated with their kit to allow the Government to integrate the modification into baseline aircraft and training devices. 3. INSTRUCTION TO POTENTIAL RESPONDENTS Respondents are encouraged to provide comprehensive responses that demonstrate existing capability, supply chain stability, and technical support qualifications. Please structure your response to address the following sections: A. Company Information: Company Name, Address, CAGE Code, and Website URL. Point of Contact (Name, Title, Phone, Email). Business Size Status under NAICS Code 336413 (Aircraft Manufacturing), with a size standard of 1,500 employees. Please self-certify for all applicable categories: Small Business (Yes/No) Woman-Owned Small Business (WOSB) (Yes/No) HUBZone Certified (Yes/No) Service-Disabled Veteran-Owned Small Business (SDVOSB) (Yes/No) Company Ownership (Domestic or Foreign-owned). Interest as Prime Contractor or Subcontractor. B. Technical Capability, Logistics, and Sustainment: Provide a detailed description of your proposed hardware kit (whether providing the OEM baseline or an equivalent solution). Describe the Size, Weight, Power, Cooling, and Center of Gravity (CG) impacts of the installation hardware (excluding the batteries). Detail your strategy for interfacing the physical relay with the aircraft's Operational Flight Program (OFP) and Crew Alerting System (CAS) to provide pilot advisories, fault alerts, and engine Full Authority Digital Engine Control (FADEC) interlocks.[JC4] If a physical switch or manual control is required for the activation of the proposed solution, the vendor must detail the strategy for aircraft modification, including the exact proposed placement of the interface to ensure in-flight aircrew accessibility. Provide engineering analysis or electrical modeling curves demonstrating the system's ability to maintain transient voltage above the engine hot-start threshold during a simulated start sequence at temperatures down to -40°C (-40°F). Provide proof of your company being part 145 certified. Sustainment & Tooling: Identify any proprietary or non-standard tooling required for installation. Identify strict shelf-life limitations or specialized storage/packing requirement for any kit consumables (e.g., adhesives, sealants). Confirm supply chain capability to provide individual replacement parts (relays, brackets) for long-term sustainment. Describe the technical data package provided with your kit and detail how your company will ensure the USAF Program Office receives future engineering revisions, safety notices, or updates related to this specific kit. Provide an impact analysis on how aircrew training syllabi and training devices (e.g., flight simulators, Weapons System Trainers, Cockpit Part Task Trainers, Operational Flight Trainers) will need to be updated. Acknowledge your ability to provide the necessary engineering artifacts required to support a Government CCB, ECP development, and TCTO generation. Facility Suitability: Describe the facility/depot where this installation would occur. Confirm that your facility meets the minimum footprint, tooling, and safety standards (e.g., specialized battery storage, hazardous material handling, and overhead clearance) required to perform the parallel battery kit installation. Throughput and Parallel Capacity: What is your maximum capacity for simultaneous (parallel) aircraft installations? Please detail how your facility layout and tooling availability support this throughput. C. Cost, Schedule, and Manpower: Provide a Rough Order of Magnitude (ROM) cost estimate broken down in two parts: Non-Recurring Engineering (NRE): Electrical design, software/CAS integration, flight manual updates, and ECP/STC certification data package support, to include the engineering source data required for TCTO generation and Technical Order (TO) updates. Modification Kit & Field Installation: The per-aircraft cost to procure the physical hardware (excluding batteries) and perform the retrofit installation. Provide an estimated timeline for the development, testing, kit delivery lead times, and initial operational capability of the first modified aircraft. Validation of Maintenance Man-Hours (MMH): Respondents must name estimated MMH, and then clarify this estimate by addressing the following: The assumed environment/conditions for this estimate (e.g., controlled factory/depot environment vs. an operational flightline hangar). Active "touch-labor" hours vs. passive calendar/cure time, including whether the estimate assumes standard room-temperature or accelerated heat curing. Assumed crew size (single technician vs. multi-person). Inclusion or exclusion of post-installation testing and airworthiness sign-off time. Detail your available certified manpower (specifically avionics technicians and structural installers) to support the modification effort. Clarify if dedicated crews will be used for each aircraft, or if staff will be shared across multiple, parallel installation lines. Describe your crewing strategy for handling multiple, parallel aircraft modification lines (e.g., dedicated crews per aircraft vs. shared staff). D. Small Business Utilization: For Small Businesses: Describe how you will comply with FAR 52.219-14, Limitations on Subcontracting, if this requirement is set-aside. For Large Businesses: Provide a realistic small business utilization target as a percentage of total contract value and explain your rationale. 4. RESPONSES AND COMMUNICATIONS Responses shall not exceed 15 pages (single-sided, 12-point font). Submit responses electronically by 5:00 PM Eastern Time on 12/11/2026. Mark all proprietary information clearly. Unmarked information will be considered publicly releasable. Be advised that government-contracted support personnel may handle submissions under non-disclosure agreements. Prospective contractors must be registered in the System for Award Management (SAM) at (see the official solicitation). Submit Responses to: Buyer: Chad Group (chad.group@us.af.mil) PCO: Jeremy Perry (jeremy.perry.5@us.af.mil)

Documents

No documents are listed for this notice.

Contacts

2 contacts

Points of contact as published on the notice.

Timeline & history

  1. Sources Sought posted

  2. Sources Sought posted

  3. Responses dueNext · in 23 days

  4. Archive date on the official notice

Similar open RFPs

Same NAICS group or Other, nearby first, ranked by score.

RFP Detector Scores are informational.How we score →

More from Department of the Air Force

743 open RFPs from this issuer and its offices.

Limited

USAFA Rangeland Noxious Weed Control

Department of the Air Force · USAF Academy, CO

FederalSources soughtFacilities, Maintenance & Janitorial
Posted Nov 4Due Nov 18, 2026, 2:00 PM MST (in < 1 h)Federal notice
Poor

B-2 Relay Assembly NSN

Department of the Air Force · Tinker AFB, OK

FederalSolicitationSupplies, Equipment & Furniture
Posted Mar 13Due Nov 18, 2026, 3:00 PM CST (in < 1 h)Federal notice
Fair

MACH1 AOI FA890327M1006 F-47 Future Campus at Nellis AFB

Department of the Air Force · Nellis AFB, NV

FederalPresolicitationConstruction & Renovation
Posted Oct 30Due Nov 18, 2026, 4:00 PM CST (in 1 h)Federal notice

RFP Detector Scores are informational.How we score →

About this notice

Official federal notice. Updated Nov 12, 2026.

Official solicitation:Sign in free to open the official solicitation

RFP Detector is an independent service and is not affiliated with any government agency. Scores are informational.

RFP Detector is not affiliated with the organization that issued this RFP. Always rely on the official notice and confirm every date and requirement with the issuer.