Why this score
31 days to respond, posted today; but small typical award (~$138K).
Updated Oct 7, 2026
This RFP closed on Nov 6, 2026.
Nov 6, 2026
Responses were due Nov 6, 2026, 7:00 PM EST
Same NAICS group or Supplies, Equipment & Furniture, nearby first, ranked by score.
Why this score
31 days to respond, posted today; but small typical award (~$138K).
Why this score
31 days to respond, posted today; but small typical award (~$138K).
Why this score
31 days to respond, posted today; but small typical award (~$138K).
Why this score
31 days to respond, posted today; but small typical award (~$138K).
Why this score
31 days to respond, posted today; but small typical award (~$138K).
Defense Logistics Agency
Why this score
WOSB set-aside, new this week; but small typical award (~$47K).
RFP Detector Scores are informational.How we score →
Summary by RFP Detector
Department of the Army (W6QK ACC-APG NATICK), part of the Department of Defense, posted a request for information titled “RFI: Draft MIL-DTL for Militarized USB-C (USB-CM) - Feedback Request”. It was posted on Oct 7, 2026. The response deadline was Nov 6, 2026, 7:00 PM EST. It is classified under NAICS 334417 (Electronic Connector Manufacturing). No set-aside is listed. The listed point of contact is Danny Soto.
Score at publication
Every RFP starts at 50. Each factor adds or subtracts points compared with a typical RFP; unknown data counts as neutral.
Frozen at publication: closed RFPs are not re-scored.
Starts at 50
No value published, and there isn't enough award history to estimate one. Scored as neutral.
Full and open competition.
20 other RFPs from Department of the Army on RFP Detector in the past 12 months; no award history found.
Special notice: 30 days to respond (due Nov 6, 2026, 7:00 PM EST).
Documents not listed, 2 named contacts with email, 280-word description.
Posted today.
50 + contributions = 61 (C, Fair)
Informational, not advice to bid or not bid. Score version 1.0.0, evaluated Oct 7, 2026.
Eligibility · Full and open competition
Full and open competition means the notice states no set-aside: any responsible business can respond, subject to the requirements in the notice.
Not stated in a form we could extract. See the official solicitation for requirements, evaluation criteria and submission steps.
From the official notice
THIS IS A REQUEST FOR INFORMATION (RFI) ONLY. This is not a Request for Quotation (RFQ), Request for Proposal (RFP) or an Invitation for Bid (IFB). The Program Manager – Protection and Integration (PM-PI) is seeking feedback on draft #2 of Military Detail document aka MIL-DTL for a new design for military connections. This draft incorporated comments from draft #1 and is subject to change based on relevant feedback and other developmental milestones of the program. Militarized USB-C aka “USB-CM” is an environmentally hardened connection built to survive military environments. The connector supports power and data requirements and supports USB standards unless specifically stated otherwise. This government owned design is intended to provide a standard interface for military equipment and is not proprietary. USB-CM is intended to provide a reliable and ruggedized standard connector for users across the Department of War in their deployed terrestrial, maritime: surface and sub-surface, air, and space operational environment(s). PM-PI is looking for public feedback on the second draft of MIL-DTL document including, but not limited to: USB-CM connector design, manufacturability, ability to integrate into vendor products, cost considerations, any perceived limitations of use, durability and corrosion resistance, materials, etc. It is encouraged that comments include tradeoffs in metrics, such as cost/data/design/testing as it relates to data rate and power levels. This is a refined second draft incorporating previous feedback. Please send all further comments to USB-CMilitary@army.mil. MS word or PDF is the preferred format. The draft MIL-DTL including design and detailed performance characteristics, can be found in the Attachments section of this posting. This Request for Information is associated with: RFI: Feedback on Draft MIL-DTL for Militarized USB-C (USB-CM) Connections dated 13 April 2026
No documents are listed for this notice.
Danny Soto
PrimaryLydia Wang
Points of contact as published on the notice.
Special Notice posted
Responses were due
872 open RFPs from this issuer and its offices.
Department of the Army · Worcester, MA
Why this score
New this week, clear, complete notice; but only less than a day left.
Department of the Army · Lompoc, CA
Why this score
Active buyer ($24.3B FY24–FY26), clear, complete notice; but only less than a day left.
Department of the Army · Santa Barbara, CA
Why this score
Active issuer (39 RFPs); but only less than a day left.
Department of the Army · Savannah, GA
Why this score
Clear, complete notice, active issuer (37 RFPs); but only less than a day left.
Department of the Army · Aberdeen Proving Ground, MD
Why this score
Active issuer (48 RFPs); but only less than a day left.
Department of the Army · Picatinny Arsenal, NJ
Why this score
Active buyer ($4.1B FY24–FY26), typical award ~$1M; but only less than a day left.
RFP Detector Scores are informational.How we score →
Official federal notice. Updated Oct 7, 2026.
Official solicitation:Sign in free to open the official solicitation
RFP Detector is an independent service and is not affiliated with any government agency. Scores are informational.
RFP Detector is not affiliated with the organization that issued this RFP. Always rely on the official notice and confirm every date and requirement with the issuer.