Skip to content
FederalRFIOpen Federal notice

RFI USMMA Campus Modernization Program SATOC Seawall Project

Department of the Army› W2SD ENDIST NEW YORK Kings Point, NY

Solicitation # W912DS27S0006Updated Nov 12, 2026Scored Nov 22, 2026

Responses due

Dec 4

Dec 4, 2026, 4:00 AM EST

Posted Nov 12Due Dec 4

Summary by RFP Detector

What this RFP is about

Department of the Army (W2SD ENDIST NEW YORK), part of the Department of Defense, posted a request for information titled “RFI USMMA Campus Modernization Program SATOC Seawall Project” under solicitation number W912DS27S0006. It was first posted on Nov 12, 2026 and has been updated once since. Responses are due Dec 4, 2026, 4:00 AM EST. It is classified under NAICS 237990 (Other Heavy and Civil Engineering Construction) and product/service code Y1PZ. No set-aside is listed. The place of performance is Kings Point, New York. The listed point of contact is Mohenda Surage.

Key facts

Sector
Federal
Notice type
RFI
As posted: Sources Sought
PSC
Y1PZ
Place of performance
Kings Point, NY
Value
Not statedTypical award in this market ≈ $2.4M
Solicitation #
W912DS27S0006
Listing
Official federal notice

RFP Detector Score

Score breakdown

Every RFP starts at 50. Each factor adds or subtracts points compared with a typical RFP; unknown data counts as neutral.

Starts at 50

  • Value+7.5estimated

    No value published. Typical award is about $2.4M: the median of 1,434 Army contracts over $25K awarded in NAICS 237990, FY24–FY26.

  • Competition & access+3.9measured

    Full and open competition. The largest recipient took 12% of these dollars in FY24–FY26, and spending is spread across many vendors.

  • Issuer & market+10.7measured

    Army obligated $22B on NAICS 237990 across 1,618 contracts in FY24–FY26. 35 other notices from this office in the past 12 months.

  • Time & stage+5.4measured

    Sources sought (market research, not a bid): 12 days to respond (due Dec 4, 2026, 4:00 AM EST).

  • Clarity & completeness+5.0estimated

    Documents not listed, named contact with email and phone, 1,789-word description.

  • Freshness+2.9measured

    Posted 9 days ago.

50 + contributions = 85 (A, Excellent)

Score trend, last 30 daysScore history: 92, 91, 90, 89, 88, 87, 86, 85

Informational, not advice to bid or not bid. Score version 1.0.0, evaluated Nov 22, 2026.

Requirements & submission

Eligibility · Full and open competition

Full and open competition means the notice states no set-aside: any responsible business can respond, subject to the requirements in the notice.

Not stated in a form we could extract. See the official solicitation for requirements, evaluation criteria and submission steps.

From the official notice

Description

1,789 words

THIS IS A REQUEST FOR INFORMATION ANNOUNCEMENT ONLY This announcement is issued solely for market research purposes in accordance with Revolutionary FAR Overhaul (RFO) Part 10, Market Research. The U.S. Army Corps of Engineers (USACE), New York District, is seeking information regarding the interest, capability, and qualifications of firms that may be capable of performing the requirement described below. This RFI is for planning and informational purposes only. It does not constitute a solicitation, Request for Proposals (RFP), Invitation for Bids (IFB), or commitment by the Government to issue a solicitation or award a contract. Responses to this RFI are not offers and cannot be accepted by the Government to form a binding contract. The Government will not pay for, reimburse, or otherwise compensate respondents for costs associated with preparing or submitting information in response to this RFI. The Government does not intend to rank submissions or provide individual responses to interested firms. Information submitted and clearly marked as “Proprietary” will be handled accordingly. The U.S. Army Corps of Engineers, New York District is issuing this Request for Information (RFI) for an Indefinite Delivery/Indefinite Quantity, Single Award Task Order Contract (SATOC) to determine interest, capabilities, and qualifications to for Design-Build contractors. The NAICS codes for this procurement is 237990, Size Standard is $45 Million. The Request for Proposals is planned to be issued in the Spring of 2027 with construction to begin early in 2028. The estimated SATOC capacity is $70,000,000 with the anticipated Task Order magnitude between $10,000,000 and $25,000,000. Work under this contract is expected to begin in winter of 2028. The SATOC will be for contractor to replace/restore 2,800-foot seawall at the United States Merchant Marine Academy, Kings Point, NY. The project will be constructed within the access-controlled installation along the waterfront of the United States Merchant Marine Academy. Adjacent facilities will remain occupied during construction with minimal disruption to operations requiring precise construction planning. Work for this project is described below: 1. Project Purpose and Program Context USACE and USMMA have undertaken an agreement to modernize the campus in its entirety providing upgraded Barracks, Academic Buildings, Training Buildings, Athletic Facilities and Waterfront Spaces. The Seawall will serve to protect critical land side facilities essential to the education and training of Midshipmen from storm, wave action, and tidal erosion. ________________________________________ 2. Existing Conditions The existing seawall along the United States Merchant Marine Academy (USMMA) campus shoreline extends approximately 2,800 linear feet and is aligned generally north–south along the western waterfront. The seawall exhibits significant variability in height, construction type and functional purpose along with its length. At the northern end (north of Hague Basin), the shoreline protection system transitions through several construction types in sequence: beginning with a timber (wooden) bulkhead, followed by a stone and mortar wall, then reverting to a timber bulkhead and transitioning to a steel sheet pile bulkhead with a concrete cap. (See Attachment - USMMA Seawall Site Map) Within the Hague Basin, the shoreline structures consist primarily of steel sheet pile bulkheads and stone façade walls. Presume the stone façade walls incorporate a concrete core based on visual assessment. South of Hague Basin, the shoreline is predominantly stabilized by a concrete seawall with riprap protection, which further transitions to cast-in-place (poured) concrete only toward the southern extent. The southernmost seawall segment, segment 9, includes stabilizing the adjacent slope to address its instability, mitigate further erosion, and support a future 12 ft. wide roadway/walkway to connect existing roads on campus. ________________________________________ 3. Design and Construction Scope This project will rehabilitate/restore 2,800-feet of seawall at the United States Merchant Marine Academy. The scope includes progressing the government provided 35% design consisting of nine segments to 100% Design, completing all required permitting documents, reconstructing the seawall, and restoring the waterfront. The contractor will review, validate, and advance the government-furnished 35% Design RFP package to 65% and 100% Issued for Construction (IFC) submittals across civil, structural, coastal, and geotechnical disciplines. Following design finalization for a segment construction will commence to remove and/or restore the degraded segment of seawall. The contractor will be required to complete the work in accordance with all required permits, certifications and licenses required by Federal, State, and local law for the execution of this work. ________________________________________ 4. Design Standards and Performance Requirements All work will meet the USMMA Campus Design Guide and Engineering Design Standards which contain DOT standards including the International Building Code (IBC), GSA standards, and DoD Unified Facilities Criteria (UFC). ________________________________________ 5. Acquisition Strategy and Contracting Approach The Government intends to establish a Design-Build (D-B) Single Award Task Order Contract (SATOC) Indefinite-Delivery, Indefinite-Quantity (IDIQ) contract with a total contract capacity of $70,000,000 over an anticipated five-year ordering period. INFORMATION REQUESTED FROM RESPONDENTS Areas of particular interest to the government are responses to the following questions: 1) Is your firm interested in competing for this project? If so, do you anticipate proposing as an integrated prime contractor/Designer of Record (DOR) team, a joint venture (JV), or a prime construction contractor with a subcontracted design firm? 2) Based on the anticipated scope (steel sheet pile, bulkhead replacement, concrete seawall replacement, splash pads, and drainage system replacement), what percentage of the construction work do you anticipate self-performing with your own labor and equipment versus subcontracting? 3) Describe your teams experience over the past 5–10 years designing and constructing coastal infrastructure or shoreline stabilization projects of similar scale (exceeding 2,000 linear feet) or projects involving multiple, distinct structural wall types within a single contract. 4) What is the largest existing bulkhead or seawall replacement contract (by total dollar value and approximate linear footage) that your firm has completed as the prime contractor and/or Designer of Record? (Please specify whether each project was executed as Design-Build or Design-Bid-Build). 5) In a Design-Build delivery model, how would your team approach executing in-water geotechnical borings in tidal Long Island Sound conditions? Do you possess the in-house marine equipment and personnel to perform this subsurface investigation, or would you subcontract it to a specialized marine geotechnical firm? 6) Given that the 2,800-foot seawall is divided into 9 distinct segments with varying construction types (e.g., sheet pile, gravity wall, revetment), what specific technical challenges or efficiencies do you foresee in transitioning between these different wall typologies? 7) Describe your experience obtaining and/or working in compliance with Clean Water Act Section 401 Water Quality Certifications through the New York State Department of Environmental Conservation (NYSDEC) and Section 404 permits through USACE Regulatory, including managing design and construction schedules around Long Island Sound tidal and seasonal in-water work windows. What other permits would you anticipate on this project? 8) To minimize shoreline exposure, tidal vulnerability, and site disruption, would you recommend designing and constructing the 9 segments sequentially, concurrently in clusters, or prioritized by existing structural degradation? Based on your recommended approach, what is your estimated overall duration (broken down by design/permitting vs. construction)? 9) Considering the varying geometry and coastal exposure of the 9 segments along Long Island Sound, do you anticipate utilizing land-based equipment, marine-based barges/vessels, or a hybrid approach for demolition, material delivery, and staging? What specific site access, staging, or upland constraints should the Government clarify or address in the Design-Build Request for Proposal (RFP)? 10) Describe your team’s in-house or sub-consultant capabilities to perform advanced coastal engineering and numerical modeling, including nearshore wave transformation, wave overtopping, toe scour, and sea-level change lifecycle analysis. Which specific modeling tools or field measurements (e.g., spectral wave models such as SWAN/STWAVE, Boussinesq models, or Acoustic Doppler Current Profiler [ADCP] current measurements) do you anticipate needing to support final design? 11) Describe your team’s experience managing complex marine geotechnical risks along Long Island Sound or similar coastal environments, specifically regarding Soil-Structure Interaction (SSI) modeling, lateral earth/hydrostatic loading, and global slope stability analysis in soft, saturated marine sediments or variable glacial till strata. 12) Based on your experience with coastal Design-Build solicitations, what specific baseline coastal, hydrographic, and geotechnical data (e.g., historical storm surge/water-level statistics, offshore wave hindcast data, recent bathymetric/topographic surveys, or preliminary boring logs) do you expect the Government to provide in the 35% RFP package so that your team can accurately price and propose on the project? 13) Assuming the Government provides regional water-level statistics and baseline offshore wave data in the 35% RFP, what site-specific numerical modeling (e.g., nearshore wave transformation, EurOtop wave overtopping, localized toe-scour analysis, or USACE Sea Level Change projections) would your team anticipate executing post-award to finalize the design across the 2,800-foot alignment? 14) Given the variable subsurface stratigraphy of Long Island Sound, what supplemental field investigations (e.g., Standard Penetration Test [SPT] borings, Cone Penetration Testing [CPT], laboratory testing) and geotechnical modeling (e.g., PLAXIS 2D/3D, SEEP/W seepage and piping analysis, or global slope stability) do you anticipate performing post-award to advance the 35% concept into a sealed, Issued-for-Construction (IFC) foundation and wall design? 15) How will regional regulatory moratoriums and site usage restrictions along Long Island Sound (e.g., Essential Fish Habitat [EFH] and winter flounder/anadromous fish spawning windows, protected avian nesting seasons, and peak summer recreational beach/waterway usage) impact your proposed mobilization, staging, and construction sequencing across the 9 segments? 16) Are there specific materials anticipated for this seawall replacement (e.g., marine-grade steel sheet piling compliant with federal domestic sourcing requirements, specialized corrosion coatings, custom precast concrete units, or specific armor stone gradations) that are currently experiencing extended fabrication lead times or significant price volatility? 17) What do you view as the top three technical, schedule, or commercial risks for this 9-segment Design-Build project (e.g., unforeseen subsurface boulders/obstructions in glacial till, coastal storm events during open excavation, or permitting/utility delays), and how can the Government best structure the RFP or allocate risk to mitigate them? INFORMATION REQUESTED FROM RESPONDENTS All interested, capable, qualified, and responsive firms are encouraged to reply to this announcement. The Government is requesting that interested firms furnish the following information in addition to responses to the questions above: Corporate Information 1. Company name, address, point of contact, telephone number, and e-mail address. 2. Geographical areas in which you are capable of servicing. 3. Business-size and socioeconomic status, as applicable: a. Small or large business firm as defined by SBA, or b. Certified HUBZone firm, or c. Service-Disabled Veteran Owned Small Business (SDVOSB) firm, or d. SBA certified 8(a) firms. 4. Contractor’s comments or recommendations. Please provide, if any. SUBMISSION INSTRUCTIONS Due Date: All responses must be submitted no later than the date and time specified on the first page of this RFI. Limit response to 5 pages. Format: Submissions should be in Adobe PDF format. The file name should be: [Company Name]_Response_RFI_W912DS-27-S-0008.pdf. Submission: Responses shall be submitted via email only to the following points of contact: Contract Specialist: Mohenda Surage at mohenda.r.surage@usace.army.mil Project Manager: Richard Gussenhoven at Richard.Gussenhoven@usace.army.mil

Documents

No documents are listed for this notice.

Contacts

Points of contact as published on the notice.

Timeline & history

  1. Sources Sought posted

  2. Sources Sought posted

  3. Responses dueNext · in 12 days

  4. Archive date on the official notice

Federal award history

Market context

Department of the Army · NAICS 237990 · FY24–FY26

Typical award (over $25K)
$2.4M
Contracts awarded
1,618
Total obligated
$22.0B
Award size, Department of the Army · NAICS 237990 contracts, FY24–FY26 (log scale)
P25 $257.9KMedian $1.8MP75 $7.2MP90 $19.5M

Largest recipients in this market

  • THALLE CONSTRUCTION CO INC$2.5B12%
  • BARNARD CONSTRUCTION COMPANY, INCORPORATED$1.6B7%
  • FERROVIAL CONSTRUCCION PR, LLC$1.2B6%

Recipients of past awards in this market, not the incumbent of this RFP.

View as table
Fiscal yearObligated ($)
FY20226,964,202,710.65
FY20235,771,565,912.07
FY20247,045,473,563.73
FY20255,563,247,668.1
FY20269,406,703,869.97

Federal contract award records, award types A–D, FY24–FY26. Updated Nov 13, 2026.

Similar open RFPs

Same NAICS group or Construction & Renovation, nearby first, ranked by score.

Excellent

Smoke Barrier Door Replacement

Department of Veterans Affairs · Northport, NY

FederalPresolicitationSDVOSB set-asideConstruction & Renovation+1
Posted Nov 19Due Dec 8, 2026, 10:00 AM EST (in 16 days)Federal notice
Excellent

NRM-CONST 528-CSI-102 Urology Equipment Site Prep | FY27 NRM

Department of Veterans Affairs · Buffalo, NY

FederalSolicitationSDVOSB set-asideConstruction & Renovation+1
Posted Sep 16Due Dec 7, 2026, 10:00 AM EST (in 15 days)Federal notice
Strong

FY23-28 General Construction Services BPA

Department of the Army · Fort Drum, NY

FederalRFQHUBZone set-asideConstruction & Renovation+1
Posted Dec 2Due Nov 30, 2027, 11:59 PM EST (in 374 days)Federal notice
Strong

528A8-22-814 Consolidate Primary Care Reception

Department of Veterans Affairs · Albany, NY

FederalSolicitationConstruction & Renovation
Posted Oct 23Due Dec 8, 2026, 11:00 AM EST (in 16 days)Federal notice

RFP Detector Scores are informational.How we score →

More from Department of the Army

914 open RFPs from this issuer and its offices.

Fair

GIS Lab Maun Botswana

Department of the Army

FederalPresolicitationConstruction & Renovation
Posted Nov 13Due Nov 23, 2026, 10:00 AM GMT+1 (in 10 h)Federal notice
Limited

NCLEX Predictor and Remediation Examination Platform

Department of the Army · JBSA Ft Sam Houston, TX

FederalRFQSmall business set-asideIT & Software+1
Posted Nov 6Due Nov 23, 2026, 6:00 AM CST (in 13 h)Federal notice
Limited

Ergonomic Workstations JTF WHEM

Department of the Army · Doral, FL

FederalSolicitationSmall business set-asideSupplies, Equipment & Furniture+1
Posted Oct 23Due Nov 23, 2026, 9:00 AM EST (in 15 h)Federal notice
Limited

USAG Industrial Equipment Maintenance & Repair Services

Department of the Army · Fort Bragg, NC

FederalSources soughtFacilities, Maintenance & Janitorial
Posted Nov 16Due Nov 23, 2026, 10:00 AM EST (in 16 h)Federal notice

RFP Detector Scores are informational.How we score →

About this notice

Official federal notice. Updated Nov 12, 2026.

Official solicitation:Sign in free to open the official solicitation

RFP Detector is an independent service and is not affiliated with any government agency. Scores are informational.

RFP Detector is not affiliated with the organization that issued this RFP. Always rely on the official notice and confirm every date and requirement with the issuer.