Skip to content
FederalCombined synopsisClosed Federal notice

STA Sand Key Repair Fuel Lines and Tank

US Coast Guard› Base Miami Beach Clearwater Beach, FL

Solicitation # 30321PR270000001Updated Oct 29, 2026

This RFP closed on Nov 13, 2026.

The details below are kept for reference. Similar open RFPs are listed first.

Closed

Nov 13, 2026

Responses were due Nov 13, 2026, 3:00 PM EST

Posted
Oct 29, 2026
Closed
Nov 13, 2026

Similar open RFPs

Same NAICS group or Construction & Renovation, nearby first, ranked by score.

Excellent

FY27 NRM (PROJ 573-24-110) BB - Expand Cardiology Service

Department of Veterans Affairs · Gainesville, FL

FederalSpecial noticeSDVOSB set-asideConstruction & Renovation+1
Posted Nov 17Due Dec 18, 2026, 3:30 PM EST (in 23 days)Federal notice
Excellent

Port Everglades USCG Reconfiguration Project

Department of the Army · Fort Lauderdale, FL

FederalSources soughtConstruction & Renovation
Posted Nov 16Due Dec 17, 2026, 2:00 PM EST (in 22 days)Federal notice

RFP Detector Scores are informational.How we score →

Summary by RFP Detector

What this RFP is about

US Coast Guard (Base Miami Beach), part of the Department of Homeland Security, posted a combined synopsis/solicitation titled “STA Sand Key Repair Fuel Lines and Tank” under solicitation number 30321PR270000001. It was posted on Oct 29, 2026. The response deadline was Nov 13, 2026, 3:00 PM EST. It is classified under NAICS 237120 (Oil and Gas Pipeline and Related Structures Construction) and product/service code Z2PZ. The set-aside is listed as Small Business Set Aside - Total. The place of performance is Clearwater Beach, Florida. The listed point of contact is MKC Zachery Little.

Key facts

Sector
Federal
Notice type
Combined synopsis
As posted: Combined Synopsis/Solicitation
PSC
Z2PZ
Place of performance
Clearwater Beach, FL
ZIP 33767
Value
Not stated
Solicitation #
30321PR270000001
Listing
Official federal notice

Score at publication

Score breakdown

Every RFP starts at 50. Each factor adds or subtracts points compared with a typical RFP; unknown data counts as neutral.

Frozen at publication: closed RFPs are not re-scored.

Starts at 50

  • Value0.0unknown

    No value published, and there isn't enough award history to estimate one. Scored as neutral.

  • Competition & access+4.5estimated

    Total small-business set-aside.

  • Issuer & market−3.9estimated

    1 other RFP from US Coast Guard on RFP Detector in the past 12 months; no award history found.

  • Time & stage+7.6measured

    Solicitation, bids due: 15 days to respond (due Nov 13, 2026, 3:00 PM EST).

  • Clarity & completeness+5.0estimated

    Documents not listed, named contact with email and phone, 2,133-word description.

  • Freshness+9.0measured

    Posted today.

50 + contributions = 72 (B, Strong)

Informational, not advice to bid or not bid. Score version 1.0.0, evaluated Oct 29, 2026.

Requirements & submission

Eligibility · Small Business Set Aside - Total

Small-business set-asides reserve a contract, or part of it, for businesses that meet the size standard for the NAICS code on the notice. "Total" set-asides restrict the whole requirement; "partial" set-asides restrict part of it.

Not stated in a form we could extract. See the official solicitation for requirements, evaluation criteria and submission steps.

From the official notice

Description

2,133 words

COMBINED SYNOPSIS / SOLICITATION NOTICE Commercial Products and Commercial Services / Simplified Acquisition Procedures (In accordance with FAR Subpart 12.6 and FAR Part 13 / FAR Subpart 36.2 as applicable) GENERAL INFORMATION • Action Code: Combined Synopsis/Solicitation • Document Type: Combined Synopsis/Solicitation Notice • Solicitation Number: 30321PR270000001 • Notice Date: 10/29/2026 • Set-Aside Status: Total Small Business Set-Aside • Primary NAICS Code: 237120 – Oil and Gas Pipeline and Related Structures Construction • Small Business Size Standard: $45.0 Million (for NAICS 237120) • Product Service Code (PSC): Z2PZ – Repair or Alteration of Other Utilities POINTS OF CONTACT Contracting Officer’s Representative: MKC Zachery Little Email: Zachery.T.Little@uscg.mil Phone: (417) 612-3258 SECTION 1: SYNOPSIS & DESCRIPTION This is a combined synopsis/solicitation for commercial services prepared in accordance with the format in Federal Acquisition Regulation (FAR) Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested and a written solicitation will not be issued separately. The Department of Homeland Security, United States Coast Guard (USCG), has a requirement for repair, remediation, testing, and coating of fuel lines, storage tanks, and associated fuel system infrastructure located at USCG Station Sand Key, Clearwater, Florida. The Government intends to award a single, Firm-Fixed-Price (FFP) contract resulting from this request for quotation (RFQ). SECTION 2: PLACE OF PERFORMANCE & OPERATIONAL HOURS • Location: United States Coast Guard Station Sand Key 1375 Gulf Boulevard Clearwater, FL 33767 • Operating Hours: Normal base operating hours are 0700 to 1700 (7:00 AM – 5:00 PM), Monday through Friday, excluding federal holidays. Any work required outside these hours must receive prior written coordination and approval from the Contracting Officer’s Representative (COR). • Continuity of Operations: Station Sand Key is an active, operational military facility. The contractor shall coordinate all operations with the unit to ensure the station does not lose the capability to fuel operational vessels during the execution of repairs. SECTION 3: SUMMARY SCOPE OF WORK (SOW) DEPARTMENT OF HOMELAND SECURITY UNITED STATES COAST GUARD STATION SAND KEY SPECIFICATIONS FOR Repair Fuel Lines & Tank General: United States Coast Guard Station Sand Key requesting repair work to be completed on various fuel lines and fuel related systems. Location: United States Coast Guard Station Sand Key. 1375 Gulf Boulevard Clearwater, FL 33767 I. Continuity of Facilities Operation: Schedule work to minimize interference with the facility’s normal operations. Normal operating hours are from 0700 to 1700 Monday thru Friday except federal holidays. Any work during other hours unless otherwise instructed or permitted shall be scheduled and approved with the Contracting Officers Representative. II. Notification of Start and Completion of Work: The Contractor shall notify Coast Guard one week prior to start of work. III. Coast Guard Contracting Officers Representative: The Contractor shall contact the COR to coordinate all construction efforts onboard Coast Guard Facilities. MKC Zachery Little Zachery.T.Little@uscg.mil 417-612-3258 IV: Recycling and Disposal of Refuse: Minor refuse, excess or waste materials resulting from construction operations may be disposed of in Station dumpsters. All disposals shall be done in accordance with federal, state, and local laws and regulations. V: Safety: During the execution of this contract, the Contractor shall conform to the rules and regulations as set forth by OSHA Safety and Health Standards, 29 CFR Part 1926 - Safety and Health Regulations for Construction. The contractor shall have a written safety plan as required in FAR 5.236-13. The plan shall unequivocally assign responsibility and authority for safety to the superintendent by name. Immediate notification to the Contracting Officer’s Representative of lost time due to accidents is required. Provide two copies of workman’s compensation accident reports by noon of the day following the accident. The Coast Guard reserves the right to bar any workers or supervisors from the premises should they be documented as violating set safety standards and regulations. VI. Inspection: The Contracting Officer’s Representative has the right to reject defective workmanship or materials or work not performed as per the project specifications. Only the Contracting Officer or his/her representative may accept work performed by the contractor. VII. Operations and Storage: The contractor is to take whatever steps necessary to ensure that his materials are protected. The Coast Guard has no responsibility for receipt, storage, or protection of contractor’s materials. All equipment, materials and supplies shall be addressed to the contractor. The Coast Guard will not accept shipments. The contractor is responsible for the protection of existing structures, utilities, work and vegetation. Any damage shall be repaired at the contractor’s expense. VIII. Contractor Identification: The contractor and subcontractor personnel shall, at all times, wear company identification. IX. Existing Utilities: The Contractor shall field verify all utility locations before commencing work. This shall include, but not be limited to, the use of visual, sonic, electronic or magnetic detection devices. Contractor shall be responsible for repairing any utilities damaged during construction at no additional cost to the Government. X: Regulations while onboard Coast Guard Station Sand Key: 1. Daily colors and the raising/lowering of the American flag will take place every morning at 0800 and every evening at sunset. All personnel on Base will face the main flag pole & maintain silence and all vehicles & equipment will halt during these brief events. 2. The construction site shall be maintained in a clean condition at all times. This included daily clean-ups of the construction and storage areas (FAR 52.236-12). The site shall be well lit and well barricaded/cordoned off as appropriate. 3. There is one smoking area on base, SE corner next to dumpsters. 4. Traffic Regulations: a) 15 mph speed limit b) No use of cell phones is permitted while driving vehicles or operating heavy machinery c) All personnel shall obey all marked traffic signals including stop signs & stop lights. 5. Absolutely no firearms or weapons of any kind are allowed onboard Station Sand Key 6. Only American citizens and permanent resident aliens are allowed onboard Station Sand Key. Absolutely no foreign nationals are permitted on the premises. 7. Notice shall be given to the Coast Guard’s representative 1 week in advance of any planned power, water, and sewage or lighting outages. 8. The contractor shall provide a consolidated list of all contracted personnel, including their driver’s license numbers (or other valid gov’t issued ID number) who will be working on Station Sand Key Facilities either the day of or prior to the notice to proceed date. 9. Contractors are welcome to utilize the restrooms on the 1st decks of the building. Providing they are clean and do not track mud, dirt or any other debris into the restrooms. 10. Should warnings of gale force or stronger winds, or other inbound natural disasters be issued, the contractor shall take every practicable precaution to minimize the danger to persons, to the work, and the adjacent property. These precautions shall include closing all openings, removing all loose materials, tools and equipment from exposed locations, and removing or securing scaffolding, securing field trailers, and other appropriate equipment and other temporary work. 11. No personnel other than the contracting officer have the authority to alter the terms of any contract or to issue any change orders. 12. All contractor vehicles, equipment and gear onboard Coast Guard properties are subject to search at all times. Additionally at all times due to security and operational needs, the contractors is subject to orders to evacuate the property at any time. VIII: SCOPE OF WORK: Contractor shall provide all labor, materials, and equipment necessary to complete the following noted below: 1. All work in this contract shall be completed in USCG STA Sand Key 1375 Gulf Blvd Clearwater, FL 33767 2. Both SCU’s (spill containment unit) have corrosion on the outside of the SCU’S. Treat/remove corrosion on DSL (Diesel) and RUL (Regular Unleaded) spill containment units. 3. Label and calibrate DSL and RUL clock gauge so that a high level 90% warning alarm will sound if tank is filled past capacity. Additionally, provide testing once repairs are made and submit to unit for record keeping. 4. Treat/remove corrosion both DSL and RUL tanks and all associated piping, apply environmentally safe paint to the entirety of both tanks and associated piping additionally attach appropriate markings on both tanks IAW local, state, and county regulations (capacity, description, ect.) 5. Investigate and make repairs to both DSL and RUL dispensers to correct flow rate. 6. Investigate and make repairs to both DSL and RUL UDC’s (under dispenser containment) complete integrity test once repairs are made and submit to unit for records keeping. 7. Complete integrity test for 03 transition sumps, make any necessary repairs and provide testing records to unit after any repairs are made for records keeping. 8. Investigate and make repairs to or replace leak detection panel and sensors, to ensure system operates correctly, additionally label monitoring panel for each leak detector location. 9. Conduct Line leak detection on all fuel lines, and make any repairs that are needed, provide test results to unit for records keeping. 10. Replace non-compliant section of copper fuel piping and components that supply emergency generator tank. 11. Contractor will work with unit to ensure the units does not lose the ability to fuel vessels while repairs are taking place. 12. Contractor will test run system after all repairs are made to ensure system operation. 13. Contractor shall provide dumpster AS NEEDED and shall be responsible for all cleanup of the project area. 14. Contractor shall be responsible for the removal of the dumpster once the project is complete. 15. Contractor shall protect all equipment and merchandise in work locations. 16. All work must be approved by the Contracting Officer’s Representative SECTION 4: SITE-SPECIFIC REGULATIONS & SECURITY REQUIREMENTS 1. Security & Personnel Screening: a. Only U.S. citizens and lawful permanent resident aliens are permitted on the installation. Foreign nationals are strictly prohibited. b. The contractor must submit a roster of all personnel (including subcontractors) containing full legal names and driver’s license numbers (or valid government ID) prior to or on the Notice to Proceed (NTP) date. c. All personnel, vehicles, equipment, and packages are subject to search at any time by Coast Guard security. 2. Military Customs & Flag Etiquette: a. Morning Colors (0800) and Evening Colors (Sunset): All personnel on base must halt vehicles/equipment, face the national ensign/flagpole, and observe silence during the playing of the National Anthem or bugle calls. 3. Traffic & Safety Rules: a. Installation speed limit is 15 MPH. b. Cellular phone use while driving or operating equipment on base is prohibited. c. Smoking is restricted to the designated smoking area (southeast corner near dumpsters). d. Firearms and weapons are strictly forbidden. 4. Safety & Environmental Compliance: a. Contractor shall comply with OSHA Construction Standards (29 CFR Part 1926). b. A written Site Safety Plan must be submitted prior to commencement of work per FAR 52.236-13, naming the designated site safety supervisor. c. Notify the COR immediately of any lost-time accidents, followed by copies of accident reports by 1200 the following business day. 5. Utility Verification & Weather Contingencies: a. The contractor is responsible for locating and protecting all existing underground and aboveground utilities prior to disturbing surfaces. b. In the event of tropical storm/gale force wind warnings, the contractor must immediately secure all scaffolding, equipment, loose materials, and containers. SECTION 5: SITE VISIT • Pre-Proposal Site Visit: o An organized site visit is scheduled for: NOV 04, 2026 at 10am EST. o Location: USCG Station Sand Key, 1375 Gulf Blvd, Clearwater, FL 33767. SECTION 6: EVALUATION CRITERIA (FAR 52.212-2) The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. Award will be made based on: • Evaluation Basis: Best Value Tradeoff o Technical Capability: Compliance with all SOW requirements and demonstrated ability to maintain fuel availability. o Past Performance: Record of satisfactory past performance on similar commercial or government fuel infrastructure projects. o Price: Price reasonableness. SECTION 7: APPLICABLE CLAUSES & PROVISIONS The following Federal Acquisition Regulation (FAR) and Homeland Security Acquisition Regulation (HSAR) provisions and clauses apply: • FAR 52.204-7, System for Award Management • FAR 52.204-13, System for Award Management Maintenance • FAR 52.204-24 / 25 / 26, Representation Regarding Certain Telecommunications • FAR 52.212-1, Instructions to Offerors – Commercial Products and Commercial Services • FAR 52.212-2, Evaluation – Commercial Products and Commercial Services • FAR 52.212-3, Offeror Representations and Certifications – Commercial Products and Commercial Services • FAR 52.212-4, Contract Terms and Conditions – Commercial Products and Commercial Services • FAR 52.212-5, Contract Terms and Conditions Required to Implement Statutes or Executive Orders – Commercial Products and Commercial Services • FAR 52.236-12, Cleaning Up • FAR 52.236-13, Accident Prevention • HSAR clauses as applicable to DHS acquisitions.

Documents

No documents are listed for this notice.

Contacts

Points of contact as published on the notice.

Timeline & history

  1. Combined Synopsis/Solicitation posted

  2. Responses were due

More from US Coast Guard

155 open RFPs from this issuer and its offices.

Limited

Station Grand Isle Sewage Treatment

US Coast Guard · Grand Isle, LA

FederalSolicitationSmall business set-asideEnergy & Utilities+1
Posted Nov 16Due Nov 26, 2026, 5:00 PM CST (in 23 h)Federal notice
Limited

Connecting Rod Piston

US Coast Guard

FederalRFQSupplies, Equipment & Furniture
Posted Nov 19Due Nov 27, 2026, 9:00 AM EST (in 38 h)Federal notice
Fair

Filter Element Fluid

US Coast Guard · Curtis Bay, MD

FederalRFQSmall business set-asideSupplies, Equipment & Furniture+1
Posted Nov 20Due Nov 27, 2026, 10:00 AM EST (in 39 h)Federal notice
Poor

Cylinder, Actuating Linear

US Coast Guard · Curtis Bay, MD

FederalRFQSmall business set-asideSupplies, Equipment & Furniture+1
Posted Nov 13Due Nov 27, 2026, 1:00 PM EST (in 42 h)Federal notice
Limited

CGC FLORENCE FINCH Telescopic Handler Rental

US Coast Guard · Astoria, OR

FederalCombined synopsisSmall business set-asideSupplies, Equipment & Furniture+1
Posted Nov 24Due Nov 27, 2026, 2:30 PM EST (in 44 h)Federal notice
Limited

Repair AUDIO CONT PANELS

US Coast Guard

FederalRFQTransportation, Fleet & Logistics
Posted Nov 23Due Nov 27, 2026, 4:00 PM EST (in 45 h)Federal notice

RFP Detector Scores are informational.How we score →

About this notice

Official federal notice. Updated Oct 29, 2026.

Official solicitation:Sign in free to open the official solicitation

RFP Detector is an independent service and is not affiliated with any government agency. Scores are informational.

RFP Detector is not affiliated with the organization that issued this RFP. Always rely on the official notice and confirm every date and requirement with the issuer.