Pip-II F-37 Building Lwc Pump Room Piping System Installation
Department of Energy · Batavia, IL
Why this score
16 days to respond, recently updated.
Solicitation # W519TC26DBOASUpdated Nov 16, 2026Scored Nov 17, 2026
Nov 30
Nov 30, 2026, 4:30 PM CST
Summary by RFP Detector
Department of the Army (W6QK ACC-RI), part of the Department of Defense, posted a request for quotations titled “Steel Basic Ordering Agreement” under solicitation number W519TC26DBOAS. It was posted on Nov 16, 2026. Responses are due Nov 30, 2026, 4:30 PM CST. It is classified under NAICS 331110 (Iron and Steel Mills and Ferroalloy Manufacturing) and product/service code 9515. The set-aside is listed as Small Business Set Aside - Total. The place of performance is Rock Island, Illinois. The listed point of contact is Andrea Garcia.
RFP Detector Score
Every RFP starts at 50. Each factor adds or subtracts points compared with a typical RFP; unknown data counts as neutral.
Starts at 50
No value published. Typical award is about $61K: the median of 88 Army contracts over $25K awarded in NAICS 331110, FY24–FY26.
Total small-business set-aside. The largest recipient took 27% of these dollars in FY24–FY26.
Army obligated $16.1M on NAICS 331110 across 133 contracts in FY24–FY26. 80 other notices from this office in the past 12 months.
Solicitation, bids due: 13 days to respond (due Nov 30, 2026, 4:30 PM CST).
Documents not listed, 2 named contacts with email and phone, 1,785-word description.
Posted today.
50 + contributions = 64 (C, Fair)
Informational, not advice to bid or not bid. Score version 1.0.0, evaluated Nov 17, 2026.
Eligibility · Small Business Set Aside - Total
Small-business set-asides reserve a contract, or part of it, for businesses that meet the size standard for the NAICS code on the notice. "Total" set-asides restrict the whole requirement; "partial" set-asides restrict part of it.
Not stated in a form we could extract. See the official solicitation for requirements, evaluation criteria and submission steps.
From the official notice
SOLICITATION EXECUTIVE SUMMARY 1. THREE-STEP PROCUREMENT FRAMEWORK The Government will procure raw metal stock and components requirements utilizing a three-step process: Step One (Combined Synopsis/Solicitation): A separate Pre-solicitation Notice will not be issued; this synopsis is combined with the solicitation on (see the official solicitation) in accordance with FAR Subpart 12.6. Individual order-level Request for Quotes (RFQs) under this Basic Ordering Agreement (BOA) will be competed exclusively within the qualified pool and will not be synopsized, ensuring rapid execution. Clauses are in effect through FAC 2026-01. The primary NAICS code is 331110 (Iron and Steel Mills and Ferroalloy Manufacturing; Size Standard: 1,500 employees). Other codes are listed in Attachment 001 - Purchase Description, and the Product Service Code is 9515 (Plate, sheet, strip, foil, and leaf). Step Two (Master BOA Execution): The BOA Request for Proposal (RFP) will be released once for qualifications. The Government will execute no-cost, multi-award BOAs to responsible offerors whose proposals are compliant with Section L and rated "Acceptable" under Section M. BOAs are valid for up to five (5) years. NOTE: This RFP is the only opportunity to obtain a raw metal stock and components BOA. Proposals will not be accepted or executed at any other time. If a contractor wishes to participate in any future raw metal stock and component orders, they must respond to this initial RFP. Step Three (Order-Level Competition): As recurring supply needs arise, the PCO will issue competitive, order-level RFQs to the BOA pool. To participate, contractors must hold an active master BOA as of the RFQ closing date. Orders will result in individual, competitive Firm-Fixed-Price (FFP) contracts (Orders) under FAR 16.703. 2. SCOPE Contractors will provide commercial products supporting the following CONUS sites including but not limited to: Blue Grass Army Depot (BGAD) Pine Bluff Arsenal (PBA) Letterkenny Munitions Center (LEMC) Crane Army Ammunition Activity (CAAA) Tooele Army Depot (TEAD) McAlester Army Ammunition Plant (MCAAP) Joint Manufacturing and Technology Center (JMTC) Tank-Automotive and Armaments Command (TACOM) 3. SUBCONTRACTING FLEXIBILITY Offerors must demonstrate technical capability within the scope of Attachment 001: REV 2 Product Description. Capability may be achieved with or without subcontractors. In Step Three order-level proposals, contractors are not bound to the subcontractors proposed in Step Two but must propose resources necessary to perform each individual order. 4. BASIS FOR AGREEMENT EXECUTION The Government will execute no-cost, multi-award BOAs to responsible offerors with compliant proposals (Section L) rated "Acceptable" (Section M). NOTE: The Government reserves the right to waive the Compliance Review if in its best interest. The Government intends to execute BOAs on initial proposals without discussion. It reserves the right to negotiate if in its best interest but will only do so with offerors whose proposals do not contain significant informational deficiencies. LEGAL NOTICE: This master BOA process is not a competitive acquisition; the source selection procedures of FAR Part 15 do not apply. No pricing is requested or evaluated at this stage. Execution of a BOA does not constitute a contract or guarantee future orders. SECTION B – CONTRACT LINE-ITEM NUMBERS (CLINS) CLINs will be established at the order level for administrative categorization. SECTION C – EXECUTION BUSINESS RULES 1. GENERAL RULES The ordering period shall not exceed five (5) years from initial execution (DFARS 216.703(c)). Each BOA will be formally reviewed by the PCO annually (FAR 16.703(c)(2)) and revised as necessary. BOAs shall be changed only by modifying the agreement itself, not by individual orders. Modifications do not apply retroactively to active orders. Prior to the annual review, the PCO will confirm in writing if the contractor wishes to maintain the agreement. Either party may elect not to renew. The Government may cancel the BOA at any time if in its best interest. Only the Army Contracting Command–Rock Island Arsenal (ACC-RIA) is authorized to execute, modify, or perform annual reviews of these master BOAs. Other DoD activities may place orders under these BOAs with ACC-RIA approval. 2. STEP TWO EXECUTED BOAS (QUALIFICATION PHASE) Offerors must demonstrate technical capability by filling out Attachment 001- REV 2 Purchase Description by answering “Yes” to the items that can be completed and “No” to the items that cannot be completed by offeror. The purchase description at the order level will include but is not limited to the list found in Attachment 001- REV 2 Purchase Description. 3. STEP THREE ORDER REQUESTS (ORDERING PHASE) Order competitions are limited to active master BOA holders. Order performance periods will be established in each order and remain valid through completion, even if they extend beyond the master BOA's 5-year term. Specific evaluation criteria (e.g., Price-Only, LPTA, or Tradeoff) will be identified in each order’s RFQ. Detail purchase descriptions requirements will be provided at the order level. All orders will be Firm-Fixed-Price (FFP). Work shall not begin until the order is awarded. Business size standards and Non-Manufacturer Rule compliance will be certified and monitored at the order level. Offerors are required to provide pricing catalogs at the order level. SECTION H – SPECIAL CONTRACT REQUIREMENTS 1. CYBERSECURITY MATURITY MODEL CERTIFICATION (CMMC) Self-Assessment: To be eligible for award, and to remain eligible for orders, the contractor must maintain a current CMMC Level 1 Self-Assessment in the Supplier Performance Risk System (SPRS) at award. Maintenance: Failure to maintain this status will result in immediate restriction from participating in order RFQs, inability to exercise options, and potential removal from the raw metal stock and components BOA. Contractors are required to provide proof of CMMC Level 1 Self-Assessment with their submission to enter in this BOA. The Government will verify the offeror’s CMMC status directly via SPRS prior to awarding all delivery orders against the BOA. Flow-Down: Subcontractor CMMC requirements (ranging from non-applicable to Level 1) will be defined in individual order solicitations. Primes are solely responsible for subcontractor compliance. 4. SUBCONTRACTING LIMITS AND THE NON-MANUFACTURER RULE (NMR) Limitations on Subcontracting (FAR 52.219-14): Primes must perform at least 50% of the cost of manufacturing (excluding materials) for supply orders. Non-Manufacturer Rule (FAR 52.219-33): Non-manufacturers must supply the product of a domestic small business manufacturer, unless an SBA class or individual waiver applies. The KO will monitor compliance at the order level. 5. DELIVERY PROTOCOLS Multiple Sites: Specific details will be addressed in the delivery order. 6. ANNUAL REVIEWS AND ON/OFF RAMPING The Government reserves the unilateral right to "on-ramp" (add) or "off-ramp" (remove) contractors from the BOA pool at any time based on annual review findings, performance, compliance (CMMC), or market changes. SECTION J – LIST OF ATTACHMENTS Attachment 001: REV 2 Purchase Description Attachment 002: Offeror Points of Contact (POCs) Template Attachment 003: Provisions and Clauses SECTION L – INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS 1. GENERAL PROPOSAL INSTRUCTIONS Review Attachment 001 – REV 2 Purchase Description for insight into requirement details. Proposals must include sufficient information to demonstrate the offeror's understanding of each evaluated area. The Government intends to execute BOAs to responsible offerors with compliant proposals rated "Acceptable" for Technical. Cost/Price will not be evaluated at this stage. The Government intends to execute BOAs based on initial proposals without negotiations; initial proposals should contain complete information. The Government is not obligated to request missing data. It reserves the right to negotiate if in its best interest, but only with offerors whose proposals do not contain significant informational deficiencies. NOTICE: The source selection procedures of FAR 15.3 do not apply. Orders issued against the BOA will be competitive. Proposals must be valid for 180 days. Late proposals will not be accepted. Offerors must monitor (see the official solicitation) for amendments. 2. PROPOSAL PREPARATION Proposals must be in English. Failure to comply with instructions marked as COMPLIANCE REQUIREMENT renders a proposal non-compliant, and it will not be evaluated. NOTE: The Government reserves the right to waive the Compliance Review if in its best interest No classified material is permitted. Offerors must have an active (see the official solicitation) registration and CAGE Code at submission. Files must be compatible with Office 365 and must not be locked or password-protected. PDF files must be legible and text-searchable. Compressed (*.zip) or executable (*.exe) files are not accepted. 4. PROPOSAL STRUCTURE Include the offeror's name, CAGE code, RFP number, and date in the header/footer of each page. Submit only one proposal per firm. Proposals must provide narrative evidence of capabilities rather than merely repeating RFP requirements. Prior performance data not submitted will not be considered. 5. INFORMATION TO BE SUBMITTED VOLUME I – ADMINISTRATIVE COMPLIANCE (INDIVIDUAL PDF FILES) (see the official solicitation) Registration: PDF printout showing active registration and no exclusions. VOLUME II – TECHNICAL (INDIVIDUAL FILES) ATTACHMENT 001 – REV 2 Purchase Description ATTACHMENT 002 – Points of Contact **Required File Name: OfferorName_Att002_POCs CYBERSECURITY MATURITY MODEL CERTIFICATION (CMMC) Level 1- (INDIVIUAL PDF FILE) SUBMISSIONS ARE DUE Monday, November 30th, 2026, BY 4:30PM CST. 6. QUESTIONS Submit questions via email to the Contract Specialist listed above. Questions received less than 72 hours prior to closing may not be considered. 7. POINTS OF CONTACT (POC) Submissions should be sent in via email to Contract Specialist Andrea Garcia (andrea.garcia63.civ@army.mil) and Contracting Officer Ryan Buhman (ryan.j.buhman.civ@army.mil). 8. TECHNICAL FACTOR (VOLUME II, ATTACHMENT 001) Offerors must demonstrate technical capability by completing Technical Questionnaire portion of Attachment 001 – REV 2 Product Description. Required File Name: OfferorName_Att001_Technical File Format: MS Excel Select "YES" or "NO" for each item description listed. SECTION M – EVALUATION FACTORS FOR AWARD 1. BASIS FOR AGREEMENT EXECUTION The Government will execute a BOA to any responsible offeror whose proposal is compliant, rated "Acceptable" under Technical. No price evaluations or trade-offs will occur at the Master BOA level. COMPLIANCE REVIEW The Government will perform an initial administrative check to ensure all required documents (Volume I and II) are present and submitted in individual PDF and MS Word/EXCEL format. Non-compliant proposals will be excluded without further evaluation. Note: The Government reserves the right to waive the Compliance Review if in its best interest. 2. TECHNICAL FACTOR EVALUATION (VOLUME II, ATTACHMENT 001) Evaluators will assess Attachment 001 to verify the offeror’s capability in their proposed categories. The offerors must meet the following requirements: Registered in (see the official solicitation) Small Business Must be able to fill 50% of Attachment 001: REV 2 Purchase Description Amendment 1 1. Attachment 001- Rev 1 Purchase Description was revised and includes additional inventory highlighted in yellow. 2. The additional inventory highlighted in yellow requires a Steel Grit Material Certification from the manufacturer (Metaltec) at the time of delivery. 3. Submission date: Wednesday, October 21, 2026 Amendment 2 Attachment 001- Rev 2 Purchase Description was revised. The yellow inventory will require a Certificate of Material from the manufacturer. Contractors must maintain a minimum safeguarding requirement of CYBERSECURITY MATURITY MODEL CERTIFICATION (CMMC) Level 1 Submit CYBERSECURITY MATURITY MODEL CERTIFICATION (CMMC) Level 1- PDF Submission date: Monday, November 30th, 2026
No documents are listed for this notice.
Andrea Garcia
PrimaryRyan Buhman
Points of contact as published on the notice.
Solicitation posted
Responses dueNext · in 13 days
Archive date on the official notice
Federal award history
Department of the Army · NAICS 331110 · FY24–FY26
Recipients of past awards in this market, not the incumbent of this RFP.
| Fiscal year | Obligated ($) |
|---|---|
| FY2022 | 3,131,111.31 |
| FY2023 | 5,309,174.48 |
| FY2024 | 7,554,742 |
| FY2025 | 3,361,422.63 |
| FY2026 | 5,182,953.15 |
Federal contract award records, award types A–D, FY24–FY26. Updated Nov 15, 2026.
Same NAICS group or Supplies, Equipment & Furniture, nearby first, ranked by score.
Department of Energy · Batavia, IL
Why this score
16 days to respond, recently updated.
Department of the Army · Rock Island, IL
Why this score
20 days to respond, recently updated; but small typical award (~$70K).
Federal Prison System / Bureau of Prisons · Illinois
Why this score
Small-business set-aside, 13 days to respond; but small typical award (~$111K).
Department of Energy · Illinois
Why this score
15 days to respond, recently updated; but small typical award (~$92K).
Department of the Army · Rock Island, IL
Why this score
Small-business set-aside, 247 days to respond; but small typical award (~$68K).
Department of the Air Force · Scott AFB, IL
Why this score
Posted today, full and open; but small typical award (~$71K).
RFP Detector Scores are informational.How we score →
849 open RFPs from this issuer and its offices.
Department of the Army · Gaithersburg, MD
Why this score
New this week, 8(a) set-aside (strong incumbent); but only less than a day left.
Department of the Army · Fort Bragg, NC
Why this score
Recently updated; but only less than a day left.
Department of the Army · Johnston, IA
Why this score
Small-business set-aside, new this week; but only less than a day left.
Department of the Army · Aberdeen Proving Ground, MD
Why this score
Not openly competed. Notice signals a sole-source or brand-name intent. The largest recipient took 19% of these dollars in FY24–FY26.
Department of the Army · Camp Arifjan
Why this score
New this week, typical award ~$1.2M; but only less than a day left.
Department of the Army · Jolon, CA
Why this score
Active buyer ($24.3B FY24–FY26), full and open; but only less than a day left.
RFP Detector Scores are informational.How we score →
Official federal notice. Updated Nov 16, 2026.
Official solicitation:Sign in free to open the official solicitation
RFP Detector is an independent service and is not affiliated with any government agency. Scores are informational.
RFP Detector is not affiliated with the organization that issued this RFP. Always rely on the official notice and confirm every date and requirement with the issuer.