Skip to content
FederalSpecial noticeClosed Federal notice

TECHNOLOGY LICENSING OPPORTUNITY: Acid-tuned Terphenyl Membranes (ATM)

Department of Energy› Triad - DOE Contractor Los Alamos, NM

Solicitation # S-195397Updated Jul 22, 2026

This RFP closed on Aug 31, 2026.

The details below are kept for reference. Similar open RFPs are listed first.

Closed

Aug 31, 2026

Responses were due Aug 31, 2026, 5:00 PM MDT

Posted
Jul 22, 2026
Closed
Aug 31, 2026

Similar open RFPs

Same NAICS group or Supplies, Equipment & Furniture, nearby first, ranked by score.

Fair

Fetal Monitor - Zuni Comprehensive Community Health Center (ZCCHC)

Indian Health Service · Zuni, NM

FederalSources soughtIndian Small Business Economic EnterpriseSupplies, Equipment & Furniture+1
Posted Nov 16Due Dec 1, 2026, 12:30 PM MST (in 11 days)Federal notice
Fair

Propellant Skid AN Fitting

National Aeronautics and Space Administration · Las Cruces, NM

FederalRFQSmall business set-asideSupplies, Equipment & Furniture+1
Posted Nov 18Due Nov 25, 2026, 4:00 PM CST (in 5 days)Federal notice
Fair

Surgical Laser Equipment Rental Services

Department of Veterans Affairs · Albuquerque, NM

FederalRFQSDVOSB set-asideHealthcare & Medical+1
Posted Nov 10Due Nov 20, 2026, 5:00 PM PST (in 20 h)Federal notice

RFP Detector Scores are informational.How we score →

Summary by RFP Detector

What this RFP is about

Department of Energy (Triad - DOE Contractor) posted a special notice titled “TECHNOLOGY LICENSING OPPORTUNITY: Acid-tuned Terphenyl Membranes (ATM)” under solicitation number S-195397. It was posted on Jul 22, 2026. The response deadline was Aug 31, 2026, 5:00 PM MDT. It is classified under NAICS 325211 (Plastics Material and Resin Manufacturing) and product/service code AN12. No set-aside is listed. The place of performance is Los Alamos, New Mexico. The listed point of contact is Kathleen McDonald.

Key facts

Sector
Federal
Notice type
Special notice
As posted: Special Notice
PSC
AN12
Place of performance
Los Alamos, NM
ZIP 87545
Value
Not stated
Solicitation #
S-195397
Listing
Official federal notice

Score at publication

Score breakdown

Every RFP starts at 50. Each factor adds or subtracts points compared with a typical RFP; unknown data counts as neutral.

Frozen at publication: closed RFPs are not re-scored.

Starts at 50

  • Value0.0unknown

    No value published, and there isn't enough award history to estimate one. Scored as neutral.

  • Competition & access−0.6estimated

    Full and open competition.

  • Issuer & market+3.2estimated

    83 other RFPs from Department of Energy on RFP Detector in the past 12 months; no award history found.

  • Time & stage+1.4measured

    Special notice: 40 days to respond (due Aug 31, 2026, 5:00 PM MDT).

  • Clarity & completeness+4.2estimated

    Documents not listed, 2 named contacts with email, 641-word description.

  • Freshness+9.0measured

    Posted today.

50 + contributions = 67 (B, Strong)

Informational, not advice to bid or not bid. Score version 1.0.0, evaluated Jul 22, 2026.

Requirements & submission

Eligibility · Full and open competition

Full and open competition means the notice states no set-aside: any responsible business can respond, subject to the requirements in the notice.

Not stated in a form we could extract. See the official solicitation for requirements, evaluation criteria and submission steps.

From the official notice

Description

641 words

Acid-tuned Terphenyl Membranes (ATM) from Los Alamos National Laboratory delivers a fundamentally smarter approach to hydrocarbon proton exchange membrane design, replacing the brute-force strategy of adding more sulfonic acid groups with a precise molecular tweak that strengthens each acid site individually. By installing an electron-withdrawing unit next to the sulfonic acid group, the membrane achieves higher proton conductivity while cutting water uptake by more than half compared to its unmodified counterpart, a combination that provides a promising basis for improved dimensional stability and membrane durability. The result is a hydrocarbon platform that can rival perfluorinated incumbents on performance while opening a path to lower-cost, more sustainable clean energy hardware. How it Works ATM works by chemically tuning the acidity of the sulfonic acid groups that carry protons through the membrane, rather than simply adding more of them. A single electron-withdrawing unit is positioned adjacent to each sulfonic acid group along the polymer side chain, which makes it easier for the acid to release a proton and conduct it across the membrane. Because each acid site is intrinsically more effective, the polymer can hit competitive conductivity targets without needing the heavy sulfonation that normally causes a hydrocarbon membrane to swell, soften and lose its ion-transport channels under wet operating conditions. Technical Description The ATM platform uses a rigid terphenyl-based polymer backbone designed to carry sulfonic acid groups, the chemical sites responsible for moving protons across the robust membrane. The approach includes a baseline polymer with conventional sulfonic acid side chains and an engineered version in which a small fluorinated unit is placed directly next to each acid site. That efficient electron-withdrawing unit pulls electrons away from the acid group, which makes each site a stronger and more efficient proton donor. Because every acid site does more work on its own, the membrane can reach competitive conductivity without packing in extra sulfonic acid groups, which is the change that normally drives runaway water uptake, swelling and loss of mechanical strength in hydrocarbon membranes. Membrane property measurement performed at typical water electrolyzer operating conditions, 80 °C and fully humidified, shows the engineered polymer reaching 87 mS/cm proton conductivity with only 20% water uptake, compared to 79 mS/cm and 51% water uptake for the unmodified version. Higher conductivity paired with less than half the water absorption points to better hydration control, improved dimensional stability and a stronger foundation for long-term durability in real membrane electrode assemblies. Just as critical, the underlying design principle of tuning the acid site itself rather than multiplying acid groups is broadly applicable, offering a template for a wider family of next-generation hydrocarbon membranes serving fuel cells, electrolyzers and related electrochemical devices. Advantages • Higher proton conductivity than the unmodified hydrocarbon analog, without resorting to excessive sulfonation • Water uptake reduced by more than 60% relative to the baseline polymer, supporting better dimensional stability • Built on a rigid aromatic terphenyl backbone associated with good mechanical integrity • Provides a hydrocarbon-based, potentially lower-cost alternative to perfluorosulfonic acid membranes such as Nafion • Design principle is transferable, offering a platform strategy across multiple membrane chemistries Market Applications • Hydrogen • Transportation • Power Generation • Energy Storage • Off-road Equipment • Electrochemical Devices TRL 3 U.S. Patent pending LA-UR-26-26025 LANL Tech Partnerships: Unlock the Innovative Potential Los Alamos National Laboratory offers a wide range of cutting-edge technologies and capabilities that may provide your company with a competitive edge in the market and unlock the innovative potential that can enhance, refine, and revolutionize your products. LANL’s licensing program focuses on moving inventions developed by our researchers to commercial innovations. Patented and patent pending inventions and copyrighted software are available to existing and start-up companies through exclusive and non-exclusive licensing agreements. For specific discussions, please contact licensing@lanl.gov. Note: This is not a call for external services for the development of this technology. https://www.lanl.gov/engage/collaboration/feynman-center/partner-with-us/licensing-technology m.lanl.gov/tech-search

Documents

No documents are listed for this notice.

Contacts

2 contacts

Points of contact as published on the notice.

Timeline & history

  1. Special Notice posted

  2. Responses were due

More from Department of Energy

125 open RFPs from this issuer and its offices.

Poor

Technical Services Support

Department of Energy

FederalSolicitation8(a) set-asideProfessional & Management Consulting+1
Posted Aug 3Due Nov 20, 2026, 2:30 PM EST (in 14 h)Federal notice
Poor

Automatic Transfer Switch for Philip North Switchi

Department of Energy

FederalSolicitationSmall business set-asideSupplies, Equipment & Furniture+1
Posted Nov 9Due Nov 20, 2026, 2:00 PM CST (in 15 h)Federal notice
Poor

Ultra-High Vacuum Suitcase

Department of Energy · Upton, NY

FederalCombined synopsisSupplies, Equipment & Furniture
Posted Nov 13Due Nov 20, 2026, 5:00 PM EST (in 17 h)Federal notice
Limited

Vacuum Linear Motion Feedthrough Assembly

Department of Energy · Oak Ridge, TN

FederalRFQSupplies, Equipment & Furniture
Posted Nov 13Due Nov 20, 2026, 5:00 PM EST (in 17 h)Federal notice

RFP Detector Scores are informational.How we score →

About this notice

Official federal notice. Updated Jul 22, 2026.

Official solicitation:Sign in free to open the official solicitation

RFP Detector is an independent service and is not affiliated with any government agency. Scores are informational.

RFP Detector is not affiliated with the organization that issued this RFP. Always rely on the official notice and confirm every date and requirement with the issuer.