Space Environment Technologies and Science (SETS) Broad Agency Announcement (BAA)
Department of the Air Force · Albuquerque, NM
Why this score
Active buyer ($36.7B FY24–FY26), recently updated.
Solicitation # S-167732Updated Apr 7, 2026Scored Nov 16, 2026
Apr 24
Apr 24, 2027, 5:00 PM MDT
Summary by RFP Detector
Department of Energy (Triad - DOE Contractor) posted a special notice titled “TECHNOLOGY LICENSING OPPORTUNITY: Selective Separation” under solicitation number S-167732. It was posted on Apr 7, 2026. Responses are due Apr 24, 2027, 5:00 PM MDT. It is classified under NAICS 541715 (Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)) and product/service code AJ11. No set-aside is listed. The place of performance is Los Alamos, New Mexico. The listed point of contact is Satya Srinivasan.
RFP Detector Score
Every RFP starts at 50. Each factor adds or subtracts points compared with a typical RFP; unknown data counts as neutral.
Starts at 50
No value published. Typical award is about $500K: the median of 18,238 federal contracts over $25K awarded in NAICS 541715, FY24–FY26.
Full and open competition. The largest recipient took 8% of these dollars in FY24–FY26, and spending is spread across many vendors.
Across all agencies, NAICS 541715 saw 21,708 contracts worth $138B in FY24–FY26. No agency-specific history found. 83 other notices from this office in the past 12 months.
Special notice: 160 days to respond (due Apr 24, 2027, 5:00 PM MDT). Long lead time.
Documents not listed, 2 named contacts with email, 575-word description.
Posted 222 days ago.
50 + contributions = 53 (C, Fair)
Informational, not advice to bid or not bid. Score version 1.0.0, evaluated Nov 16, 2026.
Eligibility · Full and open competition
Full and open competition means the notice states no set-aside: any responsible business can respond, subject to the requirements in the notice.
Not stated in a form we could extract. See the official solicitation for requirements, evaluation criteria and submission steps.
From the official notice
Tunable Chemistry for Precise Metal Isolation This technology from Los Alamos National Laboratory offers a simpler, faster and more cost-effective way to separate closely related metals—including challenging actinide and lanthanide elements—by replacing complex solvent extraction systems with a flexible, single-step selective precipitation approach. By pairing tailored complexing and precipitating agents, Selective Separation enables precise, tunable separations across a wide range of metal systems while eliminating the need for harsh organic chemicals, reducing waste and lowering operational complexity. This adaptability extends its value beyond nuclear applications to areas such as rare earth element processing, medical isotope production and broader mineral and chemical separations, providing a scalable and environmentally responsible platform for next-generation metal recovery. The Challenge: Separating metals that have nearly identical chemical properties—such as actinides and lanthanides—remains one of the most persistent challenges in nuclear fuel recycling, critical mineral processing and advanced manufacturing. Existing approaches rely on complex, multi-step solvent extraction systems that use large volumes of harsh organic chemicals, require specialized equipment and generate significant secondary waste, making them costly, time-consuming and difficult to scale. These limitations create bottlenecks in recovering valuable materials and complicate efforts to improve efficiency and sustainability across multiple industries. As demand grows for cleaner, more efficient processing of nuclear materials and rare earth elements, there is a clear need for simpler, more selective and more adaptable separation technologies. Problems Solved: Selective Separation addresses these challenges by introducing a streamlined separation approach that leverages tunable chemical interactions to selectively control the behavior of metals in solutions. By strategically combining metal-binding and phase-transfer mechanisms, Selective Separation enables certain metals to remain in solution while others are selectively removed, avoiding the need for complex, multi-stage solvent extraction systems. This approach reduces process complexity, lowers costs, and minimizes secondary waste, while maintaining high selectivity even for chemically similar elements such as actinides and lanthanides. Because the underlying chemistry can be tailored to different metal systems, the approach provides a flexible platform adaptable to a wide range of applications in nuclear, rare earth and broader chemical processing industries. Key Advantages: Simplified processing: Replaces complex, multi-step separation systems with a streamlined approach High selectivity: Effectively separates chemically similar metals, including actinides and lanthanides Reduced chemical burden: Avoids or minimizes the use of harsh organic solvents Lower cost and faster throughput: Decreases processing time, equipment needs, and operational expenses Reduced secondary waste: Generates fewer byproducts, improving environmental performance Flexible and tunable platform: Adaptable to a wide range of metal systems and industrial applications Market Applications: Nuclear Energy (fuel reprocessing, waste management, materials recovery) Critical Minerals (rare earth processing, battery materials, supply chains) Mining and Metals Processing (ore refining, hydrometallurgy, metal recovery) Healthcare and Medical Isotopes (isotope production, radiochemical purification) Chemical Manufacturing (catalyst recovery, specialty materials processing) Environmental Services (waste treatment, resource recovery from industrial streams) Development Status: TRL 3 US Patent pending LA-UR-26-22792 LANL Tech Partnerships: Unlock the Innovative Potential Los Alamos National Laboratory offers a wide range of cutting-edge technologies and capabilities that may provide your company with a competitive edge in the market and unlock the innovative potential that can enhance, refine, and revolutionize your products. LANL’s licensing program focuses on moving inventions developed by our researchers to commercial innovations. Patented and patent pending inventions and copyrighted software are available to existing and start-up companies through exclusive and non-exclusive licensing agreements. For specific discussions, please contact licensing@lanl.gov. Note: This is not a call for external services for the development of this technology. https://www.lanl.gov/engage/collaboration/feynman-center/partner-with-us/licensing-technology m.lanl.gov/tech-search
No documents are listed for this notice.
Satya Srinivasan
PrimaryLindsay Augustyn
Points of contact as published on the notice.
Special Notice posted
Archive date on the official noticeNext · in 158 days
Responses due
Federal award history
All agencies · NAICS 541715 · FY24–FY26
Recipients of past awards in this market, not the incumbent of this RFP.
| Fiscal year | Obligated ($) |
|---|---|
| FY2022 | 36,048,638,839.8 |
| FY2023 | 44,095,127,523.94 |
| FY2024 | 44,548,015,723.6 |
| FY2025 | 48,137,939,314.17 |
| FY2026 | 45,326,010,167.74 |
Federal contract award records, award types A–D, FY24–FY26. Updated Nov 13, 2026.
Same NAICS group or Research & Scientific Services, nearby first, ranked by score.
Department of the Air Force · Albuquerque, NM
Why this score
Active buyer ($36.7B FY24–FY26), recently updated.
Department of the Air Force · Kirtland AFB, NM
Why this score
Active buyer ($36.7B FY24–FY26), full and open.
Department of Energy · Los Alamos, NM
Why this score
Active market ($138B FY24–FY26), recently updated.
Department of the Air Force · Albuquerque, NM
Why this score
Active buyer ($36.7B FY24–FY26), clear, complete notice; but posted 2106 days ago.
Department of the Air Force · Kirtland AFB, NM
Why this score
Active buyer ($36.7B FY24–FY26), full and open; but posted 202 days ago.
Department of Energy · Los Alamos, NM
Why this score
Active market ($138B FY24–FY26), clear, complete notice; but posted 163 days ago.
RFP Detector Scores are informational.How we score →
122 open RFPs from this issuer and its offices.
Department of Energy · Oak Ridge, TN
Why this score
New this week, active market ($1.1B FY24–FY26); but only 1 day left.
Department of Energy · Oak Ridge, TN
Why this score
New this week, full and open; but only 2 days left.
Department of Energy · New York
Why this score
Recently updated, clear, complete notice; but small typical award (~$39K).
Department of Energy · Los Alamos, NM
Why this score
Active market ($2.1B FY24–FY26), clear, complete notice; but only 2 days left.
Department of Energy · Los Alamos, NM
Why this score
Active market ($138B FY24–FY26); but only 2 days left.
Department of Energy · Menlo Park, CA
Why this score
But only 2 days left.
RFP Detector Scores are informational.How we score →
Official federal notice. Updated Apr 7, 2026.
Official solicitation:Sign in free to open the official solicitation
RFP Detector is an independent service and is not affiliated with any government agency. Scores are informational.
RFP Detector is not affiliated with the organization that issued this RFP. Always rely on the official notice and confirm every date and requirement with the issuer.