Skip to content
FederalSpecial noticeClosed Federal notice

U.S. Army Partnership Solutions Opening for Organic Industrial Base Advanced Manufacturing

Department of the Army› W6QK ACC-RI

Updated Jun 3, 2026

This RFP closed on Jun 22, 2026.

The details below are kept for reference. Similar open RFPs are listed first.

Closed

Jun 22, 2026

Responses were due Jun 22, 2026, 4:00 PM CDT

Posted
Jun 3, 2026
Closed
Jun 22, 2026

Similar open RFPs

Same NAICS group or Other, nearby first, ranked by score.

Strong

Munro DS FQ4

US Coast Guard · Alameda, CA

FederalSources sought
Posted Nov 20Due Dec 11, 2026, 12:00 PM EST (in 19 days)Federal notice
Strong

HNC Support Services SATOC

Department of the Army · Redstone Arsenal, AL

FederalSources sought
Posted Nov 20Due Dec 8, 2026, 9:00 AM CST (in 16 days)Federal notice

RFP Detector Scores are informational.How we score →

Summary by RFP Detector

What this RFP is about

Department of the Army (W6QK ACC-RI), part of the Department of Defense, posted a special notice titled “U.S. Army Partnership Solutions Opening for Organic Industrial Base Advanced Manufacturing”. It was posted on Jun 3, 2026. The response deadline was Jun 22, 2026, 4:00 PM CDT. No set-aside is listed. The listed point of contact is ACC-RI S3COE Team.

Key facts

Sector
Federal
Notice type
Special notice
As posted: Special Notice
NAICS
Not stated
PSC
Not stated
Place of performance
Not stated
Value
Not stated
Solicitation #
Not stated
Listing
Official federal notice

Score at publication

Score breakdown

Every RFP starts at 50. Each factor adds or subtracts points compared with a typical RFP; unknown data counts as neutral.

Frozen at publication: closed RFPs are not re-scored.

Starts at 50

  • Value0.0unknown

    No value published, and there isn't enough award history to estimate one. Scored as neutral.

  • Competition & access−0.6estimated

    Full and open competition.

  • Issuer & market+3.2estimated

    69 other RFPs from Department of the Army on RFP Detector in the past 12 months; no award history found.

  • Time & stage+1.4measured

    Special notice: 19 days to respond (due Jun 22, 2026, 4:00 PM CDT).

  • Clarity & completeness−0.1estimated

    Documents not listed, named contact with email, 1,028-word description.

  • Freshness+9.0measured

    Posted today.

50 + contributions = 63 (C, Fair)

Informational, not advice to bid or not bid. Score version 1.0.0, evaluated Jun 3, 2026.

Requirements & submission

Eligibility · Full and open competition

Full and open competition means the notice states no set-aside: any responsible business can respond, subject to the requirements in the notice.

Not stated in a form we could extract. See the official solicitation for requirements, evaluation criteria and submission steps.

From the official notice

Description

1,028 words

03 JUN 2026 Update The response due date is extended to 4:00 PM CST on 22 JUN 2026. Submit responses to this request for partnership solutions to ACC-RI mailbox usarmy.ria.acc.mbx.s3coe@army.mil with subject line: PSO Response OIB 4.0/5.0 Integration. 21 MAY 2026 Partnership Solutions Opening – Request for Whitepapers Agency: Department of War (DoW) / Army Materiel Command (AMC) Notice Type: Partnership Solutions Opening (PSO) Title: Organic Industrial Base (OIB) Modernization and Co-Production Partnership via Industry 4.0/5.0 Integration 1.0 INTRODUCTION & AUTHORITY The U.S. Army Materiel Command (AMC) is issuing this request for partnership solutions via white paper submission solely for market research, planning, and concept exploration regarding a potential Public-Private Partnership (P3) under the authority of 10 U.S.C. § 7544. Building upon industry feedback from the preceding U.S. Army Enterprise Strategic Capital Partnership RFI, the focus of this announcement is Advanced Manufacturing within the Organic Industrial Base (OIB) (Pillar 5). Based on prior industry input, the Government has refined its problem statement and is now requesting specific conceptual solutions on how to optimally structure and execute Public-Private Partnership (P3) Cooperative Arrangements. The core objective is to leverage private investment to modernize Government facilities to Industry 4.0 and 5.0 automation standards. Industry 4.0 is defined as the Fourth Industrial Revolution, is characterized by the "Smart Factory." It aims to create highly efficient, autonomous production lines by integrating cyber-physical systems with the Internet of Things (IoT) and cloud computing. Industry 5.0 is not meant to replace Industry 4.0 but to refine it. It recognizes that pure automation can overlook human creativity and environmental impact. It places the well-being of the worker and the planet at the center of the industrial process. This modernization will enable authorized co-production and facility-use activities that mutually benefit the Government's national security mission and the private partner's commercial enterprise. Disclaimer: This PSO does not constitute a Request for Proposals (RFP), nor is it a procurement action governed by the Federal Acquisition Regulation (FAR). The Government is not obligated to enter into any cooperative arrangement or agreement as a result of this PSO and will not reimburse respondents for any costs associated with submitting a response. 2.0 PROBLEM STATEMENT & TARGETED OIB LINES The Government is seeking conceptual solutions from private industry to fully modernize existing repair/overhaul lines or establish new manufacturing lines utilizing Industry 4.0 and Industry 5.0 standards at the following locations: Anniston Army Depot (ANAD): Repair & Overhaul Line for M88 Engine, M88 Transmission, M1 Abrams Engine, M1 Abrams Transmission Red River Army Depot (RRAD): New Manufacturing Line for Track shoe (and components) and road wheels for M1 Abrams, M2 Bradley, M88, M109, and heavy construction equipment Red River Army Depot (RRAD): New Manufacturing Line for Tire and Wheel Assembly (For all wheeled military vehicles) Corpus Christi Army Depot (CCAD): Repair & Overhaul Line for Allison Engine 1107C and 1107F (Rolls Royce), AH-64E Transmission, AH-64E L/ & R/H Nose Gearbox, AH-64E Composite Main Rotor Blade (Boeing), T901 Engine (GE), Bearings Corpus Christi Army Depot (CCAD): New Manufacturing Line for AH-64 Coupling (Collins) Tobyhanna Army Depot (TYAD): New Manufacturing Line for Wiring Harness Connectors Tobyhanna Army Depot (TYAD): New Manufacturing Line for Raw Board Manufacturing for Printed Circuit Cards 3.0 FINANCIAL & INVESTMENT REQUIREMENTS (CAPITAL EXPENDITURES) To accelerate modernization without requiring upfront Government MILCON or procurement funding, the selected industry partner(s) must meet the following financial parameters: Private Equity Financed Capital Expenditures (CapEx): An industry partner(s) must utilize private equity or internal corporate capital to fund 100% of the modernization CapEx for the targeted lines. Scope of CapEx: This investment must cover all necessary facility upgrades, structural modifications, equipment procurement, software integration, and physical installation. 4.0 OPERATIONAL CONCEPT: CO-PRODUCTION & COOPERATIVE ARRANGEMENT In exchange for the capital investment and modernization of the targeted OIB lines, the Government will enter into a Cooperative Arrangement pursuant to 10 U.S.C. § 7544(a). Commercial Capacity Guarantee (Facilities Use): In accordance with 10 U.S.C § 7544(b)(5), an industry partner will be granted a facilities-use contract guaranteeing a portion of the capacity of the modernized/new lines for their own commercial requirements, with the precise amount to be negotiated based on the overall structure of the partnership, other in-kind considerations offered, etc. Excess Capacity Utilization: Pursuant to 10 U.S.C § 7544(c)(3), an industry partner is authorized to use any additional excess capacity not actively utilized or identified for future plans by the Government. Non-Interference Mandate: As required by 10 U.S.C § 7544(c)(2), all commercial production must not interfere with the performance of work for the Department of War. Government production requirements for combat vehicles, rotary-wing platforms, and enterprise wheel/tire support hold absolute priority. Government Production Costs:?If an industry partner requires additional operational costs (e.g., labor, sustainment) to execute the Government's portion of the production, the respondent must explicitly identify these in their white paper as a firm, fixed-price or cost-reimbursement contract for services per 10 U.S.C § 7544(d)(1). 5.0 MANDATORY STATUTORY PROVISIONS (10 U.S.C. § 7544) Indemnification: A selected Industry partner will be required to agree to the indemnity restrictions located at § 7544(c)(4). Suspension/Termination: The Government may suspend or terminate commercial activity, or require priority performance for military work, during a war or national emergency. 6.0 WHITE PAPER SUBMISSION REQUIREMENTS Volume I: Technical & Automation Approach Detailed architecture for Industry 4.0/5.0 integration (e.g., automated tire assembly, robotic engine overhaul). Timeline for facility upgrades. Volume II: Financial & Investment Plan Proof of capital sufficient to execute all required CapEx. Detailed breakdown of estimated CapEx costs by depot/facility. Volume III: Co-Production & 10 U.S.C. § 7544 Compliance Concept of Operations (CONOPS) detailing how the structure capacity split would be for commercial and Government. 7.0 REVIEW OF RESPONSES Technological Innovation: Verifiable Industry 4.0/5.0 integration to increase throughput and quality on the specified platforms. Financial Viability: Strength of the private equity financing to cover CapEx without Government subsidy. Statutory Feasibility (Co-Production): The ability to utilize capacity for commercial requirements without interfering with the facility's military mission, effectively maximizing OIB utilization. Submission Instructions: Submit responses to this request for partnership solutions to ACC-RI mailbox usarmy.ria.acc.mbx.s3coe@army.mil with subject line: PSO Response OIB 4.0/5.0 Integration. Response must be received by 4:00 PM CST on 05 JUN 2026.

Documents

No documents are listed for this notice.

Contacts

Points of contact as published on the notice.

Timeline & history

  1. Special Notice posted

  2. Responses were due

More from Department of the Army

916 open RFPs from this issuer and its offices.

Poor

Building Filters

Department of the Army

FederalCombined synopsisSmall business set-asideSupplies, Equipment & Furniture+1
Posted Nov 9Due Nov 22, 2026, 12:55 PM MST (in 5 h)Federal notice
Fair

GIS Lab Maun Botswana

Department of the Army

FederalPresolicitationConstruction & Renovation
Posted Nov 13Due Nov 23, 2026, 10:00 AM GMT+1 (in 18 h)Federal notice
Limited

NCLEX Predictor and Remediation Examination Platform

Department of the Army · JBSA Ft Sam Houston, TX

FederalRFQSmall business set-asideIT & Software+1
Posted Nov 6Due Nov 23, 2026, 6:00 AM CST (in 21 h)Federal notice

RFP Detector Scores are informational.How we score →

About this notice

Official federal notice. Updated Jun 3, 2026.

Official solicitation:Sign in free to open the official solicitation

RFP Detector is an independent service and is not affiliated with any government agency. Scores are informational.

RFP Detector is not affiliated with the organization that issued this RFP. Always rely on the official notice and confirm every date and requirement with the issuer.