Skip to content
FederalSources soughtClosed Federal notice

USCG Station at Cape Disappointment

Department of the Army› W071 ENDIST PORTLAND

Solicitation # W9127N27R2184Updated Nov 2, 2026

This RFP closed on Nov 15, 2026.

The details below are kept for reference. Similar open RFPs are listed first.

Closed

Nov 15, 2026

Responses were due Nov 15, 2026, 3:00 PM PST

Posted
Oct 23, 2026
Closed
Nov 15, 2026

Similar open RFPs

Same NAICS group or Other, nearby first, ranked by score.

RFP Detector Scores are informational.How we score →

Summary by RFP Detector

What this RFP is about

Department of the Army (W071 ENDIST PORTLAND), part of the Department of Defense, posted a sources sought notice titled “USCG Station at Cape Disappointment” under solicitation number W9127N27R2184. It was first posted on Oct 23, 2026 and has been updated 2 times since. The response deadline was Nov 15, 2026, 3:00 PM PST. No set-aside is listed. The listed point of contact is Brandon Lasich.

Key facts

Sector
Federal
Notice type
Sources sought
As posted: Sources Sought
Category
Other
NAICS
Not stated
PSC
Not stated
Place of performance
Not stated
Value
Not stated
Solicitation #
W9127N27R2184
Listing
Official federal notice

Score at publication

Score breakdown

Every RFP starts at 50. Each factor adds or subtracts points compared with a typical RFP; unknown data counts as neutral.

Frozen at publication: closed RFPs are not re-scored.

Starts at 50

  • Value0.0unknown

    No value published, and there isn't enough award history to estimate one. Scored as neutral.

  • Competition & access−0.6estimated

    Full and open competition.

  • Issuer & market+2.9estimated

    23 other RFPs from Department of the Army on RFP Detector in the past 12 months; no award history found.

  • Time & stage+5.4measured

    Sources sought (market research, not a bid): 23 days to respond (due Nov 15, 2026, 3:00 PM PST).

  • Clarity & completeness+2.3estimated

    Documents not listed, 2 named contacts with email, 1,531-word description.

  • Freshness+9.0measured

    Posted today.

50 + contributions = 69 (B, Strong)

Score trend, last 30 daysScore history: 45, 43, 40

Informational, not advice to bid or not bid. Score version 1.0.0, evaluated Oct 23, 2026.

Requirements & submission

Eligibility · Full and open competition

Full and open competition means the notice states no set-aside: any responsible business can respond, subject to the requirements in the notice.

Not stated in a form we could extract. See the official solicitation for requirements, evaluation criteria and submission steps.

From the official notice

Description

1,531 words

11/02/2026: Update - Regarding the section 4. "Submission instructions" on responding using the link, please disregard using the link. This has been removed from that section. You must submit your answers by emailing them to the points of contact for this posting, as now instructed in section 4. 10//27/2026: Update - The response due date has been changed to 15 November 2026. General. This is a SOURCES SOUGHT and is for informational/market research purposes only. THIS IS NOT A REQUEST FOR PROPOSAL, QUOTATION OR BID, NOR A SYNOPSIS OF A PROPOSED CONTRACT ACTION UNDER RFO FAR SUBPART 5.1, PRESOLICITATION. This Sources Sought is to gain knowledge of the interest, capabilities, and qualifications of industry so the government can make informed business decisions. We are seeking responses from both large and small business members of industry to include: Small Business, Small Disadvantaged Businesses to include 8(a) firms, Historically Underutilized Business Zones (HUBZone), Woman Owned Small Business (WOSB) to include Economically Disadvantaged Women-Owned Small Business (EDWOSB), Service-Disabled Veteran-Owned Small business (SDVOSB) and Veteran Owned Small Business (VOSB). All interested parties are highly encouraged to respond. The North American Industrial Classification Code (NAICS) for this requirement is: TBD - The approximate value of Project will be $50M to $100M. Formal Sources Sought Response Due – before 3:00 pm PDT on 26 November 2026 2. Project Details and Background. The USCG Station at Cape Disappointment requires repairs, upgrades, and improvements to existing infrastructure and nearby areas to restore and retain full mission readiness. The Station is on an unstable sandbar which has experienced sediment migration into dock and adjacent waterway areas. Dock structures are failing and require repair/replacement. The vessel haul-out facility is currently inoperable due to sedimentation and requires the USCG to conduct frequent maintenance dredging. Haul-out structure is failing and requires replacement. Adjacent landscape features pose rockfall dangers above the engineering and maintenance buildings to people and property 3. Project Scope. Rockfall slope instability corrective measures: Anticipated rockfall mitigation will require corrective measures including but not limited to tree removal, rock scaling, rock dowel installation, draped mesh removal and replacement, removal and/or repair of an existing damaged ringnet fence, and installation of a midslope attenuator system. Rockfall mitigation will require difficult access techniques to reach the full height of the hazardous slope. Temporary protection of the facility and workers will be required. Repairs to damaged roadways, utilities or access pathways may be required. Repair of an existing small landslide slump along the access road is required. Final mitigation work will reduce rockfall risk to USCG personnel and facility. Waterfront structures and vessel haul-out: The waterfront structures require repairs and upgrades. Replacement of the existing floating docks is required; they will retain their current configuration (footprint) but utilize updated material specifications. Existing timber and steel piles will be either replaced, or reused with new floats, as part of this contract, depending on current condition. Geotechnical, civil, structural, mechanical, and electrical scope is included. Constraints include: Float A to be retained; guide piles at floating docks #2 and #4 to be replaced; wave screens to be replaced; electrical equipment to be upgraded; existing vessel haul-out facility to be replaced. Eel grass and SAV surveys are required to inform design. Dock operations are to be maintained during construction, per phasing to be outlined by the government. Coastal Resilience and Sedimentation Remediation: Due to the catastrophic loss of the protective coastal dune, the facility requires a comprehensive permanent solution to control massive sediment migration. Bathymetric surveys, geotechnical testing, and coastal modeling are required to inform viable design and permit alternatives. The design will utilize modern, resilient coastal engineering practices including Nature-Based Solutions (NBS), dynamic revetments, segmented offshore breakwaters/sills, and the beneficial reuse of dredged sediment wherever practicable. Construction may be implemented in functional phases to optimize funding and operational readiness. Shoreline protection repairs and upgrades are considered part of this category along with the Haul Out structure. Interim repair work: Interim repair work may be required on existing structures before new design and construction activity can be completed. If the need arises, USACE will provide USCG a description of the recommended repairs and a cost estimate. If USCG would like USACE to institute repairs, an updated agreement to define the scope will be established. 4. Submission Instructions. Formal responses to this Sources Sought notice must be submitted via email with supporting documentation requested here in Section 4 Submission Instructions. Submit your email with SUBJECT: "Response to questions on Cape Disappointment". Please email to Brandon Lasich Brandon.M.Lasich@usace.army.mil and Jaren Bowman, at jaren.l.bowman@usace.army.mil Interested parties’ responses to this Sources Sought shall be limited to six (6) pages and shall include the following information: What is the interest in submitting a proposal for a Design Build solicitation for the dock work What would be the interest in submitting a bid for a Design Build solicitation for the Sedimentation mitigation work. What is the interest in submitting a proposal for a Progressive Design Build contract. Provide benefits and risks for Progressive Design Build for any of the scope items presented. What issues do you see with soliciting for construction contracts work as described in section 3. List the capabilities of your firm to do the design and construction of new segmented breakwater and haul structure working close to a Federal Channel, complex tidal currents and wave loading, complex movement of sand, and subject to large storm event What are the capabilities to design and construction for the renovation of new dock work. Do you have experience designing to USACE and/or USCG waterfront design criteria: USCG Configuration Standard Technical Orders relevant to this project scope UFC/USACE requirements relevant to this project scope Design for complex hydro loading conditions in shallow bays to USACE/UFC criteria. List previous design build work for doing work in complex environment where one had to consider the working close to a Federal Channel, complex tidal currents, complex movement of sand, subject to large storm events and is highly dynamic. List previous design build work for dock work. What issues do you see with the work. What issue do you see with design bid build. Provide input for benefits and negatives to separate construction contracts (for each scope item in Section 3), or a combination of scope items into 1 or 2 contracts. Rockfall Mitigation Specific Questions What construction methods are anticipated for the rock scaling, for rock dowels, mesh and attenuator installation? What is the general anticipated construction sequence to remove trees, scale rock and debris, install mitigation and make repairs to existing rockfall systems (to remain)? How will rock scaling be performed? What method(s) will prevent scaled rock and cut trees from damaging building, buried utilities? What are the anticipated types and size of equipment required to construct the rockfall systems - e.g. crane or helicopter size; wagon drill, crane mounted drill, or hand plugger; scale bar, air bag, or mechanical scaling, etc? List any constructability issues or concerns; e.g. accessibility, equipment footprints, scaling etc. What is the contractor’s experience with similar types of flexible midslope attenuator/geohazard mitigation on transportation, dam infrastructure or similar projects? During rockfall mitigation work, how fast can work stop, safely hold and clear road debris to allow USCG emergency responders full, safe access to execute rescue operations? Dock Replacement Specific Questions What construction method is anticipated to replace the dock pilings and boat haulout pier in a similar footprint? What is your experience in pile and dock removal and replacement in tightly controlled spaces (both in plan area around operating docks, and elevation limitations for installation of piles in clearance limited spaces), and relying on phased construction to maintain operations of the current facility during construction? Provide feedback for potential to fast track certain fabricated parts during the design phase to meet specific in water work windows (season, year). Are there items that can be queued up for fabrication earlier in the design phase while final details are still being finalized, in order to expedite lead times to meet installation windows? Sedimentation Specific Questions Anticipated method to transport riprap and/or jetty stone via land? Via water? Anticipated method to install riprap and/or jetty stone, based on land and/or water transport. What is the construction sequence for dredging, stone procurement, transport and placement of stone? 5. Disclaimer and Important Notes. a. This notice does not obligate the Government to award a contract. No reimbursement will be made for any costs associated with providing information in response to this Sources Sought or any follow-up information. The Government reserves the right to use information provided by respondents for any purpose deemed necessary and legally appropriate. Any organization responding to this notice should ensure that its response is complete and sufficiently detailed to allow the Government to determine the organization's capabilities to perform the work. Respondents are advised that the Government is under no obligation to acknowledge receipt of the information received or to provide feedback to respondents with respect to any information submitted. b. All interested firms must be registered in the System for Award Management (SAM) at (see the official solicitation) to have size status considered. You must remain current for the duration of the source selection process to be eligible for award of a Government contract.

Documents

No documents are listed for this notice.

Contacts

2 contacts

Points of contact as published on the notice.

Timeline & history

  1. Sources Sought posted

  2. Sources Sought posted

  3. Sources Sought posted

  4. Responses were due

More from Department of the Army

862 open RFPs from this issuer and its offices.

Limited

Fort Benning Stray Animal Control

Department of the Army

FederalSources sought8(a) set-asideFacilities, Maintenance & Janitorial+1
Posted Nov 17Due Nov 22, 2026, 9:00 AM EST (in 34 h)Federal notice
Limited

Building Filters

Department of the Army

FederalCombined synopsisSmall business set-asideSupplies, Equipment & Furniture+1
Posted Nov 9Due Nov 22, 2026, 12:55 PM MST (in 40 h)Federal notice
Fair

GIS Lab Maun Botswana

Department of the Army

FederalPresolicitationConstruction & Renovation
Posted Nov 13Due Nov 23, 2026, 10:00 AM GMT+1 (in 2 days)Federal notice

RFP Detector Scores are informational.How we score →

About this notice

Official federal notice. Updated Nov 2, 2026.

Official solicitation:Sign in free to open the official solicitation

RFP Detector is an independent service and is not affiliated with any government agency. Scores are informational.

RFP Detector is not affiliated with the organization that issued this RFP. Always rely on the official notice and confirm every date and requirement with the issuer.